Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹3.0 L+₹190.32 (0.06%)Rejected-AOC MELAIYUR | L2 | Rejected-AOC REJECTED |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
20 Apr 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER SIRKALI BLOCK
BLOCK DEVELOPMENT OFFICE SIRKALI BLOCK
Construction of SC Cremation Shed AT Vadakuvelli Adidravidar theru in Perunmangalam Panchayat Sirkali Block Mayiladuthurai District
2022_RDTN_228394_1
3421/2021/A4 04.04.2022
Open Tender
Civil Works - Roads
Item Rate
120 days
BLOCK DEVELOPMENT OFFICE SIRKALI BLOCK
REFER TENDER NOTICE
9 documents required · 9 mandatory
₹0
₹3,000
Yes
BLOCK DEVELOPMENT OFFICE SIRKALI BLOCK
22 Apr 2022
7 Apr 2022
20 Apr 2022
7 Apr 2022
20 Apr 2022
11 Apr 2022
7 Apr 2022 - 8 Apr 2022
11 Apr 2022
Amount
Construction of SC Cremation Shed @ Vadakuvelli Adidravidar theru in Perunmangalam Panchayat Sirkali Block Mayiladuthurai District
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing,laying,and wateringetc.complete For foundation &Greade beam
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing,laying,and wateringetc.complete For foundation &Greade beam
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Up to basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture.
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Shuttering.
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Centering.
Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete.
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
White washing two coats with shell lime, including cost and conveyance of all materials to worksite and all labour and all other incidental charges etc., complete.
Colour washing two coats with shell lime, including cost and conveyance of all materials to worksite and all labour and all other incidental charges etc., complete.
Provision for Chimmeny
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Abi Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .