Tender Value
₹49.6 L
EMD Value
₹99,158
Closing Date
3 Oct 2023, 11:00 amClosed
Superintending Engineer
15/12 A, Thornhill Road, Civil line, Prayagraj
Construction of 11 KV underground and overhead line, LT ABC and DT work for RFO-2 Allahabad, Bamrauli 4th line from track no. 831/12 to 833/19, Bamrauli, against Semi Turn Key Basis of Deposit work Under EUDD-Bamrauli, Prayagraj.
2023_PVVNV_839459_1
20/EUDC-II/PYG/SE/2023-24
Open Tender
Electrical Works
Turn-key
60 days
Prayagraj
As per Tender Specification
2 documents required · 2 mandatory
₹5,850
Yes
S.E. EUDC-II, Prayagraj.
₹99,158
Yes
10 Oct 2023
18 Sept 2023
3 Oct 2023
18 Sept 2023
3 Oct 2023
18 Sept 2023
SUPPLY OF MATERIALS
G.I. pipe 6" dia
Top channel 100x50x2240 mm
Service clamp O/S
Clamp for fixing pipe to pole
HDPE pipe 8" dia
Earthing complete
MS Nut & Bolt
Bracing angle 65x65x6x2700 mm with clamp
Stone Pad 300x300x75 mm
X-arm M.S Angle 65x65x6 mm V type for 11 KV
Guarding Angle 65x65xx1600 mm
Guarding Angle 65x65xx2600 mm
Earthing complete
Stay Complete
G.I. Wire 6 S.W.g for Guarding & lacing.
Top Channel 100 x50x2240 mm
Cross bracing angle with clamp
Service clamp
F/E-bracket for 11 KV
Cross arm holding clamp
Stone pad 300x300x75 mm
Danger board with clamp
Nut & Bolt with washer
Barded wire
Aluminium paint
Red oxide Paint
I-Hook
Dead End Clamp
Suspension Clamp
Piericing Connector 120 sq mm
Piericing Connector 90 sq mm
Distribution Boxes with accessories
M.S. Angle 50x50x6 MM 18"
U' Bolt
L.T. Shackel Insulator
1x35 sq mm PVC cable
1x16 sq mm PVC cable
MS Channel Dropper 100x50x2600 mm
MS Angle 75x75x6x2028 mm
MS Channel 125x65x2240 mm
M.S bole And Nuts off size with Washer
Earthing complete by MS Rod 20x2500 mm
DD wire
Aluminimum Lug 70 Sq mm
Aluminimum Lug 120 sq mm
PVC Tape
Mounting, Fitting, Errection & Dismental works with Loading & Unloading carriage from Naini Store to Site of Work. (Part-B)
Erection, grouting, plinthing, earthing & painting of 11 mtr long sub station type D/P for mounting of T/Fs with all accessories like 11 kv fuse set, TPMO, top channel, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly as per Resspo and Electrical Safety rule.
Erection & commissioning of T/F 25 KVA on D.P. along with HT/LT connections with copper L-piece. Complete in all respect,as per Resspo and Electrical Safety rule
Eerection, grouting, plinthing & earthings of 11 mtr single support with fixing of necessary clamps and other accessories like One no. cross arm, one no. guarding angle, grouting ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting , plinthing material will be arranged by the contractor.)
Erection, grouting, plinthing, earthing & painting of single support pole 9 mtr long STP for LT line, including fixing of necessary clamps grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly (Grouting & plinthing and all required material will be arranged by the contractor except 9 mtr long STPas per Resspo and Electrical Safety rule)
Errection&Commissioning of (3x120+1x195+1x16)/ (3x95+1x70+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule
Errection&Commissioning of ACSR Weasl for neutral conductor in LT AB line with fixing of LT X-arm, LT shackle insulator, clamps etc. at existing LT pole as per Resspo and Electrical Safety rule
Errection & Commissioning of distribution boxes/kiosk on the LT poles including all clamps & materials required, connections & sealing its connection in between Distribution Box & ABC 1x35 sq. mm LT PVC cable (all required Local materials including Distribution box arranged by the contractor as per Resspo and Electrical Safety rule)
Spreading and stringing of 3 Phase 3 wire ( 3 No. ACSR Dog conductor) continuous conductor for H.T. 11 KV line including binding of insulator complete in all respect. The work includes jumpering/connecting of conductor at sectional pole.
Spreading and stringing of 2 nos G.I. wire no.6 SWG for guarding of 11 KV line and knitting with G.I. wire for making guard at an interval of 5 Meters. The lacing nearest to the support will be about 1.5 Mtr. All required material will be provided by contractor.
Erection, grouting, plinthing, painting & earthing of 11 mtr long double pole/section pole with fixing of necessary clamps, other accessories like channel, disc insulator with fitting, pin insulator etc. grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ration 1:2:4 with 12 mm thickness curing of plingth should be done properly.(Grouting, plinthing and all required material will be provided by the contractor except 11 mtr STP )
Laying of single 11 KV, 3x185sq mm XLPE cable normal soil by digging of trench 900 mm deep, 600 mm wide including supply of required material like first class brick, stone pad and sand etc. The enter axial spacing between two cable( in case of any other cable is also running in parallel) should be in between o.25 mtr. to .40 mtr. The cable shall be laid between two continous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules (All material required for laying will be supplied by the contractor. 11 KV cable provided by Deptt.)
Drilling in all horizontally to cross the road, 1050 mm bellow from the surface for laying of HDPE Pipe and laying of 33 KV.3x300 sq m,m XLPE cable in 8'' dia HDPE Pipe.
Fixing of Heat Shrink cable type end Terminations suitable RAYCHEM RPG make for 11 KV, 3x185/3x120/3x70 sq mm XLPE cable and 11 KV 3x185/3x120/3x70 sq mm ISI mark jointing kit will be arrange by the contractor with one year gauranty as per Resspo and Electrical safety rules.
Outdoor/indoor jointing kit
Straight through jointing kit
Hoisting of 11 KV 3x185 sq mm XLPE cable providing GI pipe of size 6” dia 3 M long on double pole including its jumpering, complete with clamps, nut & bolts. (all required material arrange by contractor as per Resspo and Electrical safety rules.)
Earthing of support complete with the help of M.S. rod 16 mm dia and 2.5 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. (All material will be arranged by the contractor as per Resspo and Electrical Safety rule)
Fixing & Grouting of stay rod with cement, sand and bricks ballast in ratio 1:4:8 and fastening the stay wire with pole and stay rod nuzzling.(Grounting and all material will be provided by the contractor)
Laying/hanging of following LT cable of different sizes for main/distribution/connecting the main cable from T/F to tailless unit and for distribution, from tailless unit to LT section Pole, crimping the both ends of cable if required and tapping be made inside distribution box making channel of first class brick and filling with soil.
1x150 sq. mm.
Dismentaling Charge of old 11Kv Lines, LT Line, Transformer, Cartage of New Material from store/Dump Store to work site & cartage of old dismentaled material from site to ESC, Naini, Prayagraj
Fixing of marking stone for 33 KV U/G cable including supply of required
M/S VINAYAK ASSOCIATE
M/S P.K. Enterprises
D N S ENTERPRISES
GANGA ELECTRICALS
M/S Ajay Tripathi
M/s A.E. Enterprises
RAKESH ELECTRIC WORKS,ECID
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .