Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L1 | Accepted-Finance L1 |
Tender Value
₹2.3 L
EMD Value
₹2,400
Closing Date
20 Jun 2022, 2:00 pmClosed
SUPERINTENDING ENGINEER /ELECTRICAL SYSTEMS /MTPS1
Superintending Engineer Electrical Systems Mettur Thermal Power Station I Mettur Dam-636406
MTPSI ES Circle EMI Division Unit II Complete overhaul of one number 3500 KW 6.6KV HT motor BFP 2B Sl No 49152 C421 41 01 during Annual overhaul 2022
2022_EB_234871_1
SE / ES / MTPS-I /EM-1/No 11/2022-23
Limited
Electrical Works
Works
15 days
MTPS1 METTUR DAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2,400
Yes
22 Jun 2022
3 Jun 2022
21 Jun 2022
3 Jun 2022
20 Jun 2022
3 Jun 2022
3 Jun 2022 - 20 Jun 2022
Amount
Charges for disconnection of power cable, de-coupling of the motor from pump and checking alignment of the motor shaft with pump shaft.
Charges for removal of end covers and measuring the air gap and magnetic axis.
Charges for removal of water line pipes, cooler assembly and lifting the cooler unit to a convenient location.
Charges for removal of sleeve bearings, resting the rotor on the stator after placing rubber sheet.
Charges for removal of foundation bolts, lifting the motor to a convenient location.
OVERHAULING OF MOTOR:- a)OVERHAULING OF STATOR: charges for Inspection, cleaning and checking of stator windings, fastening of the stator winding to the end ring &also the inter coil spacers and packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, drying out the stator, preheating, checking the IR Value, DC resistance and Tan Delta.
b)OVERHAULING OF ROTOR: charges for Inspection, cleaning of released rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, cleaning of overheated and burnt places and applying one coat of Dr.Beck’s insulating varnish and drying out .
Charges for cleaning the cooler tubes, checking the coolers by hydraulic testing, reconditioning of cooler flanges, replacement of gasket etc.
Charges for checking the sleeve bearing and preparation of bearing surface and blue matching the housing. (Bearings supplied by TANGEDCO)
Charges for lifting and erection of the motor back on its bed after cleaning and checking healthiness of pedestal insulation.
Charges for assembling of sleeve bearings, checking the interference between the bearings and housing, checking the clearance between shaft and bearing.
Charges for assembling the end covers, checking air gap and magnetic axis.
Charges for lifting the cooler assembly, fixing with motor and connecting the water pipes etc.
Charges for termination of power cable, coupling the pump with motor and checking alignment of the motor shaft with pump shaft.
Charges for tightening of bed bolts, foundation bolts, checking the IR value, DC resistance and trial run the motor in decouple/ couple condition running the motor satisfactorily.
Charges for painting the motor complete surface and fan blade with 2 coats of standard Grey enamel paint . Area of 1 No. BFP HT Motor- 38 M2
Smoke Grey enamel paint
Dr.Beck Varnish
Thinner
Cost of consumables cotton waste Glue, Dungry cloth, blue match, Namadha packing, shim, etc.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .