| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 L+₹9,596.52 (1.92%)Rejected-AOC | ₹5.1 L+₹9,596.52 (1.92%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.1 L+₹11,745.74 (2.35%)Rejected-AOC | ₹5.1 L+₹11,745.74 (2.35%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical technically dis-qualified |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
9 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEER.(E),Z-III
Office of the E.E. (E) LIGHTING department Kolkata Municipal Corporation 28A, K. N. Sen Road Kolkata-700042 West Bengal
INSTALLATION OF STREET LIGHTING SYSTEM AT PRIYANATH MALLICK ROAD IN WARD NO. 72 UNDER KMC.
2026_KMC_1018153_1
KMC/LTG/Z-III/2025-2026/915
Open Tender
MISC ELECTRICAL WORKS
Percentage
30 days
WARD NO-72
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
21 Jul 2026
6 Mar 2026
9 Mar 2026
6 Mar 2026
9 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1)h) 410 SP - 24 ; 8.5 Mtr., 158.00 Kg. | - | EA | 13,717 | - |
| 2 | SCHEDULE OF RATES FOR OH LINE INSTALLATION (LT DISTRIBUTION).Erection of Poles.Erection of Single Steel tubular pole of length as given below with/without sole plate & Cap etc. in CC foundation (Proportion and dimension indicated below), having 600x600x150 mm thick CC (4:2:1) base block below sole plate/pole with hard jhama metal including CC (6:3:1) muffing 0.30 mts. dia and 0.30 mts. above ground level including 3 mm thick neat cemented finish and GI earth bolt after making drilled holes etc. on pole & carriage of pole upto 1.6 Km from Store to work(site including filling up the excavated earth pit with shifted soil and ramming properlyUpto 9.0 mtr. Size 0.6x0.6x1.70 mts | - | SET | 2,835 | - |
| 3 | SCHEDULE OF RATES FOR EARTHING INSTALLATIONS.Earthing Installation ... with Pipe Electrode.Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (HOT Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:(a)By ISI Medium GI pipe. | - | SET | 1,369 | - |
| 4 | S/F of special head type M S loop box (3 mm thick) with connecting bar and other accessories fixed on the top the pole as required and as per direction of Engineer-In-Charge. For 3 phase connection. | - | EA | 518 | - |
| 5 | Extra on items 1& 2 above, FOR providing CC (6:3:1) base block around the pole) dimension 0.45x0.45x0.60 mt. above ground level, neatly cemented finish (3) mm thick), at the base pole (in lieu of CC muffing) incl. drilled hole in pole suitable FOR alkathene/polythene pipe entry, FOR street light wiring, without Loop Box | - | ITM | 498 | - |
| 6 | S/F arm bracket of 50 mm bore tubular Pipe (M.S.) of 1. 5 m (5') length for fixing on 75/100 mm pole top including S/F 4 mm thick M.S. plate welded with bolts, nuts & clamps, etc. as required with fabrication work | - | EA | 1,058 | - |
| 7 | S/F double arm projected lamp bracket (Single pip bending) of 50mm (2") dia G.I. pipe (ISI medium) of 2.5 mtr long each having 105 degree curvature with reducing socket to be fitted at the top of the pole with bolts, nuts clamps etc. as required | - | EA | 2,491 | - |
| 8 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.(i)1st coat of aluminium paint over 1 coat of RO priming | - | PPL | 226 | - |
| 9 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.ii2nd coat of aluminium paint over 1st coat | - | PPL | 103 | - |
| 10 | Erection of Galv. (HOT Dip) Cross arms/ `D... Iron Clamp7).Supplying & Erection of Galv. `D... iron complete with suitable pole clamp 75mmx88mm porcelain shackle insulator & 15 mm dia Galv. bolts & nuts. incl. painting | - | EA | 123 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
TFORM.pdf
Tender Documents • 0.45 MB
BOQ_2502029.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .