| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC NEW ABADI KISHANPURA SURATGARH 335804 DISTT SRIGANGANGAR RAJ | GANGANAGAR | RAJASTHAN | 335804 | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹40.0 L+₹3.2 L (8.63%)Rejected-AOC | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹40.6 L+₹3.8 L (10.3%)Rejected-AOC C O SHRI AMRENDER KUMAR YADAV IACHHIPUR SANTOSH NAGAR GORAKHNATH GORAKHPUR UTTAR PRADESH PIN 273015 | GORAKHPUR | UTTAR PRADESH | 273015 | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹40.7 L+₹3.9 L (10.5%)Rejected-AOC PLOT NO 46 WARD NO 08 OPPOSITE RADIO TOWER SAGAR ROAD TILAK NAGAR BIKANER 334003 RAJ | BIKANER | BIKANER | RAJASTHAN | 334003 | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹41.0 L+₹4.2 L (11.3%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/S BUDHRAM BISHNOI L4 | M/s JUGAL KISHORE MISHRA AND SONS L1 | M/S GODARA CONSTRUCTION CO. L6 | AK CONSTRUCTION L9 | K M TILES L8 | M/S VISHNU ENTERPRISES L7 | PACHAR BROTHERS L5 | BISHNOI BUILDERS L2 | SHIVA BUILDERS L3 | JK ENGINEERS L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .10Notes:- (i) 100 percent nonperishable items of the work shall be deposited by the L1 bidder within 30 days after placing of work order. (ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE. (iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge. (iv) Material obtained from demolition/dismantled and the serviceable material (other than reused in the work) shall be the property of the Govt and shall be removed and deposited in the MES Store Yard without any extra cost to Govt. (v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern OEM / authorised dealers and submitted to Accepting Officer, the L1 bidder may be incorporated Group-I category makes as approved by HQ CE SWC Jaipur / HQ CE BTZ in the works after prior approval of Accepting Officer. (vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR’s and Final Bill. (vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work. (viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. | |||||||||||||
| 1.00 | Dismantling posts or struts (wood, steel or RCC), any section, including taking out embedded portion and making good disturbed ground, posts embedded in concrete, brick work, masonry, etc complete all as specified and as directed. | 500 | RM | 29 ₹14,500 | 20 ₹10,000 Lowest | 20 ₹10,000 Lowest | 85 ₹42,500 | 50 ₹25,000 | 200 ₹1,00,000 | 20 ₹10,000 Lowest | 25 ₹12,500 | 50 ₹25,000 | 100 ₹50,000 |
| 2.00 | Dismantling structural steel work including door gates but excluding framed trusses etc complete all as specified as directed by Engr- in- charge. | 15 | Qtl | 529 ₹7,935 | 200 ₹3,000 | 200 ₹3,000 | 67 ₹1,005 | 70 ₹1,050 | 500 ₹7,500 | 100 ₹1,500 | 45 ₹675 Lowest | 55 ₹825 | 100 ₹1,500 |
| 3.00 | Excavation in post holes (or similar holes) in loose/ soft soil each not exceeding 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exeeding 25cm, watering and removing surplus soil to a distance not exceeding 50m and making good surface complete all as specified and as directed | 200 | Each | 79 ₹15,800 | 60 ₹12,000 | 250 ₹50,000 | 210 ₹42,000 | 150 ₹30,000 | 97 ₹19,400 | 50 ₹10,000 Lowest | 65 ₹13,000 | 145 ₹29,000 | 200 ₹40,000 |
| 4.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth in soft & loose soil complete all as specified. | 5 | Cum | 179 ₹895 | 100 ₹500 | 85 ₹425 Lowest | 175 ₹875 | 150 ₹750 | 85 ₹425 Lowest | 300 ₹1,500 | 200 ₹1,000 | 145 ₹725 | 170 ₹850 |
| 5.00 | Excavating in trenches, exc 1.5 m wide and exc 1.5m but n exc 6.0 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth in soft & loose soil complete all as specified. | 6 | Cum | 189 ₹1,134 | 400 ₹2,400 | 55 ₹330 Lowest | 82 ₹492 | 60 ₹360 | 70 ₹420 | 400 ₹2,400 | 200 ₹1,200 | 57 ₹342 | 65 ₹390 |
| 6.00 | Returning, filling in including spreading levelling watering ell ramming in layers not exc 25 cm each layer in soft/loose soil complete all as specified as directed. | 8 | Cum | 49 ₹392 | 100 ₹800 | 45 ₹360 | 49 ₹392 | 50 ₹400 | 45 ₹360 | 100 ₹800 | 90 ₹720 | 45 ₹360 | 43 ₹344 Lowest |
| 7.00 | Removing excavated material n exc 50m and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and as directed. | 3 | Cum | 49 ₹147 Lowest | 100 ₹300 | 60 ₹180 | 100 ₹300 | 90 ₹270 | 75 ₹225 | 200 ₹600 | 200 ₹600 | 77 ₹231 | 75 ₹225 |
| 8.00 | M&L Brick work with fly ash bricks (old size) straight or curved on plan exc 6m mean radius built in CM 1:6 including demolition of existing brickwork or stone boulder masonary , built in cement mortar or cement lime mortar including all quonins , arches, pillarsetc, but excluding ashlar facing dressed stonework and precast concrete articles complete all as specified | 50 | Cum | 4,599 ₹2,29,950 | 4,700 ₹2,35,000 | 4,800 ₹2,40,000 | 4,900 ₹2,45,000 | 4,800 ₹2,40,000 | 4,300 ₹2,15,000 | 4,000 ₹2,00,000 | 4,800 ₹2,40,000 | 4,700 ₹2,35,000 | 3,900 ₹1,95,000 Lowest |
| 9.00 | M&L for brick work with Fly Ash bricks straight or curved on plan exc 6 mtr mean radius built in CM 1:4 in half brick thick wall including demolition of existing brickwork or stone boulder masonary , built in cement mortar or cement lime mortar including all quonins , arches, pillarsetc, but excluding ashlar facing dressed stonework and precast concrete articles complete all as specified | 100 | Sqm | 499 ₹49,900 Lowest | 600 ₹60,000 | 850 ₹85,000 | 982 ₹98,200 | 1,100 ₹1,10,000 | 700 ₹70,000 | 500 ₹50,000 | 900 ₹90,000 | 1,100 ₹1,10,000 | 1,133 ₹1,13,300 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
18 Aug 2025, 6:00 pmClosed
GE (A) Suratgarh
GE Army Suratgarh
REPAIR TO FENCING, BOUNDARY WALL,HARD STANDING DRAINS AND CERTAIN MISC WORK UNDER AGE B/R-II AT SURATGARH MIL STN
2025_MES_721768_1
GE (A) SOG Token No 26/25-26
Open Tender
Civil Works
Item Rate
120 days
Suratgarh
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (A) Suratgarh
₹80,000
Yes
18 Oct 2025
21 Jul 2025
20 Aug 2025
21 Jul 2025
18 Aug 2025
11 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .