Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Not submitted the requisite documents |
| 4 | Rejected-Technical CAMP AT SHADIPUR SRI VIJAYA PURAM | Rejected-Technical Not submitted the requisite documents |
| 5 | Rejected-Technical | Rejected-Technical Not submitted the requisite documents |
Tender Value
₹3.6 L
Closing Date
28 Apr 2022, 11:00 amClosed
Deputy Conservator of Forests
Mill Division Chatham
Construction of CC drain across shed no VI Mill Division Chatham
2022_DCFMD_5710_1
56-I/Genl/MD/2022-23/P-II/14
Open Tender
Civil Works - Others
Works
30 days
Office of the Deputy Conservator of Forests
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
6 May 2022
22 Apr 2022
29 Apr 2022
22 Apr 2022
28 Apr 2022
22 Apr 2022
Amount
Earth work in excavation in foundation trenches of drains ( not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, inccluding getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. Oridanry rock
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8(1 Cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size)
1:3:6 (1 Cement : 3 fine sand : 6 graded stone aggregate 40 mm nominal size).
Centring and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement : 4 fine sand)
M/S HABIB CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .