Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.3 L+₹1.3 L (13.1%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.7 L+₹1.8 L (17.8%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹11.3 L
EMD Value
₹23,000
Closing Date
5 Jan 2022, 11:00 amClosed
E.E. M.G.C.C.D-5, Bijnor
M.G.C.C.D-5, Bijnor
Construction of V.R.B. at km. 3.050 of Dakiya Dy. under Madhya Ganga Canal stage-II.
2021_UPIDC_659891_9
20/EE/2021-22
Open Tender
Civil Works - Bridges
Item Wise
60 days
Dakiya
Please refer Tender documents.
3 documents required · 3 mandatory
₹766
₹23,000
Yes
28 Mar 2022
31 Dec 2021
5 Jan 2022
31 Dec 2021
5 Jan 2022
31 Dec 2021
Amount
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M. as per directed by Engineer-in-Charge.
Cement concrete in footing 1:3:6 including all cost of material,labour,T&P etc .
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work .
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work.
for R.C.C. work
for C.C. work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work.
Cement concrete with stone ballast in R.C.C. 1:1:2 (M-25) including all cost of material, labour , T&P etc. for completion of work .
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
Supply and laying Tarfelt sheet in two layers on Bed Block including all cost of material, labour and T&P etc. complete.
Supply and laying thermocoal sheet in expansion joint including all cost of material, labour and T&P etc. complete.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Earth work in filling in ramp and diversion including ramming and dressing the surface to be required level and slope including carriage 600 M up to work site with all lead and lift.
Supply and Laying of Rever Bed Material I/C Cost of material Labour T&P etc. required for proper completion of work.
Dry brick on edge soling laid dry filling joint including all cost of material, labour and T&P etc. all complite
Filling of expansion joint with bitumen and saw dust including all cost of material, labour and T&P etc.
Removal of diversion including 1.50 m lift and up to 200.00 lead
Supply and Fixing sign board size 1.50x1.00M, Including cost of all materials, labour, T&P etc. required for proper completion of work/ No.
KHURSID AHMAD
M/S MOHD FAROOQ
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .