Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.0 LRejected-Finance | ₹13.0 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technicallydisqualified |
| Sl No | Description | Qty | Unit | GREEN VALLEY CONSTRUCTION L2 | SWMPRANNA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete- Depth of excavation not exceed 1500 mm | 0.28 | %Cum | 3,728.92 ₹4,400.13 | 3,669.43 ₹4,329.93 Lowest |
| 2.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)-With earth obtained from excavation of foundation | 0.05 | %Cum | 460.94 ₹543.91 | 453.6 ₹535.25 Lowest |
| 3.00 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor-With N.B. Variety stone metal.-1:3:6 proportion | 3.86 | Cum | 20,375.91 ₹24,043.57 | 20,052.5 ₹23,661.95 Lowest |
| 4.00 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.-For works in foundation and up to roof of ground floor/up to 4 m-Tor steel/Mild Steel-Other than SAIL/ TATA/ RINL | 1.26 | MT | 80,246.54 ₹94,690.92 | 78,963.72 ₹93,177.19 Lowest |
| 5.00 | Hire and labour charges for shuttering with centering and necessary staging up to 4.0m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works(up to roof of ground floor), 25mm to 30mm thick wooden shuttering as per decision and direction of the Engineer - in - charge. | 214.01 | Sqm | 78,541.67 ₹92,679.17 | 77,433.53 ₹91,371.57 Lowest |
| 6.00 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.-River Bazree | 26.3 | Cum | 1,69,714.38 ₹2,00,262.97 | 1,67,016.1 ₹1,97,079 Lowest |
| 7.00 | Brick work with 1st class bricks in cement mortar (1:4)-In foundation and plinth | 3.3 | Cum | 23,971.2 ₹28,286.02 | 23,590.7 ₹27,837.03 Lowest |
| 8.00 | Brick work with 1st class bricks in cement mortar (1:4)-In superstructure, ground floor | 37.42 | Cum | 2,81,024.2 ₹3,31,608.56 | 2,76,544.02 ₹3,26,321.94 Lowest |
| 9.00 | 25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface). [Note: -Waterproofing as per item 9, polymer based paint as per item 8 (a) of subhead C of Section (C). | 5.52 | Sqm | 1,341.36 ₹1,582.8 | 1,321.54 ₹1,559.42 Lowest |
| 10.00 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating nosing and drip course, scaffolding/staging where necessary (ground floor). (Excluding cost of chipping over concrete surface) - with 1:4 cement mortar - 10 mm thick plaster | 70.86 | Sqm | 10,487.28 ₹12,374.99 | 10,362.99 ₹12,228.33 Lowest |
Tender Value
₹11.9 L
EMD Value
₹24,000
Closing Date
12 Nov 2024, 5:00 pmClosed
GM (PNC), TLD-IV PS, Kalijhora
Teesta Low Dam-IV Power Station, P.O.- Kalijhora Bazar, Distt - Darjeeling, West Bengal-734008
Fencing, Water Supply and Toilet for Lanku Health Centre in Lanku Village
2024_NHPC_831985_1
NH/TLDIV PS/PNC/W920/2024/1907
Open Tender
Civil Works
Works
90 days
TLD-IV PS, Kalijhora, NHPC Ltd
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
NHPC Limited
₹24,000
Yes
20 Aug 2026
22 Oct 2024
20 Nov 2024
22 Oct 2024
12 Nov 2024
22 Oct 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].