Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC 6 NO BIJOY NAGAR SAI TOWER NAIHATI NAIHATI GARIFA WEST BENGAL 743165 UDYAM WB 14 0004481 | 24 PARAGANAS NORTH | WEST BENGAL | 743165 | ₹17.0 L Quoted ₹14.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹33.4 LRejected-Finance | ₹33.4 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | P.K.DUTTA AND CO. L1 | Aarvee Engineering Consultants Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Preliminary survey for Identification of 3 alternative routes using satelite imageries (1:25,000 PAN +LISS merged) for NRSA.Google images and Survey of India maps and finalization of most economical, Optimum route showing the topographical and other features upto 8Kms on either side and indicating final selected route alignment and digital modelling final selected route alignment and digital modelling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications. | 5 | KM | 11,000 ₹55,000 Lowest | 25,000 ₹1,25,000 |
| 2.00 | Detailed survey along the approved route alignment approval after conducting the preliminary survey by using Modern survey equipment like GPS/DGPS, Total stations including profiling tower spotting and optimization of locations by using computer aided technique like ALTM as well as other activities as detailed in the scope of work using PLS-CADD software and submission of draft report for approval.
a. Drawing the route profile including Geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc.
b. KMZ/KML file of approval route.
c. Levelling of the profile with reference to Survey of India bench marks(MSL) d. Tower Schedule.
e. Line Schedule.
f. Burgle details by using Modern Survey techniques and providing GPS, Co-ordinates at each anchor points for identification of anchor locations indluding permanents marks like poles, telephones lines, buildings etc. | 5 | KM | 22,000 ₹1,10,000 Lowest | 80,000 ₹4,00,000 |
| 3.00 | Providing and fixing RCC pillar (M-20) of size 150 X 150 X 1000 mm, with approved marks including painting above the ground level and yellow lettering and marking the direction of incoming and outgoing lines are to be marked clearly on the top with red colour.IF the distance between such anchors points is more than 1KM one more directional stone is to be fixed. So alos, for the road crossings, railway crossing and nala crossings on both the sides. | 5 | Nos (Each Stone) | 3,200 ₹16,000 Lowest | 25,000 ₹1,25,000 |
| 4.00 | Conducting Soil resistivity test along the selected route and submitting the test results in the form of draft report as detailed in the technical specifications. | 2 | Nos. (Per Test) | 6,500 ₹13,000 Lowest | 1,25,000 ₹2,50,000 |
| 5.00Preparation of Schedule and Documents | |||||
| 5.01 | PTCC Proposal containing PTCC questionnaires, topo sheet extracts with marking of the proposed line, SR report, tower sketch, station single line diagram etc. (10 copies/set) | 1 | Per Set | 20,000 ₹20,000 Lowest | 2,00,000 ₹2,00,000 |
| 5.02 | Tree schedule containing the details like name of tree girth size, distance from central line of the alignment, approx height of tree etc., complete and submission of draft report for approval .The details shall bed survey no.wise along the corridor. (As Per Technical Specification) | 5 | KM | 2,500 ₹12,500 Lowest | 35,000 ₹1,75,000 |
| 5.03Omitted | |||||
| 6.00 | Submission of Detailed consolidated report on the surveying work done appending all approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos taken at site and submitting soft copies of all documents and report in 6 sets. The detailed report shall contain following approved draft reports.
Preliminary Report
Detailed Survey Report
Soil Resistivity Report
Soil classification report with location wise
Tree Schedule
Line Schedule
Burgie details
Digitized contours
Digitized village map geo reference and superimposed on the line corridor | 1 | Job | 1,00,000 ₹1,00,000 Lowest | 2,50,000 ₹2,50,000 |
| 7.00Detailed Soil Investigation Work as per Specification ( The location are selected by field official of AEGCL | |||||
Tender Value
₹30.2 L
EMD Value
₹61,000
Closing Date
6 Apr 2026, 12:00 pmClosed
CGM OnM UAR
1st Floor, Bijulee Bhawan, Guwahati-01
Route Survey and Soil Investigation for Construction of 132kV Transmission Line for Power Import to OIL, Madhuban from 132kV Bordubi GSS and preparation of Master Plan for Construction of 1(One) No. of 132/33KV Grid Substation at OIL
2026_AEGCL_52022_1
AEGCL /MD/ CGM(UAR)/ OIL MADHUBAN/ 132KV /2026/ BID
Open Tender
Survey
Works
120 days
Bordubi
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹61,000
8 Jul 2026
14 Mar 2026
7 Apr 2026
14 Mar 2026
6 Apr 2026
24 Mar 2026
14 Mar 2026 - 23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preliminary survey for Identification of 3 alternative routes using satelite imageries (1:25,000 PAN +LISS merged) for NRSA.Google images and Survey of India maps and finalization of most economical, Optimum route showing the topographical and other features upto 8Kms on either side and indicating final selected route alignment and digital modelling final selected route alignment and digital modelling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specifications. | 5 | KM | - | - |
| 2 | Detailed survey along the approved route alignment approval after conducting the preliminary survey by using Modern survey equipment like GPS/DGPS, Total stations including profiling tower spotting and optimization of locations by using computer aided technique like ALTM as well as other activities as detailed in the scope of work using PLS-CADD software and submission of draft report for approval.
a. Drawing the route profile including Geographical features like Nalas, Rivers, Gardens, P&T Lines, Railways crossing etc.
b. KMZ/KML file of approval route.
c. Levelling of the profile with reference to Survey of India bench marks(MSL) d. Tower Schedule.
e. Line Schedule.
f. Burgle details by using Modern Survey techniques and providing GPS, Co-ordinates at each anchor points for identification of anchor locations indluding permanents marks like poles, telephones lines, buildings etc. | 5 | KM | - | - |
| 3 | Providing and fixing RCC pillar (M-20) of size 150 X 150 X 1000 mm, with approved marks including painting above the ground level and yellow lettering and marking the direction of incoming and outgoing lines are to be marked clearly on the top with red colour.IF the distance between such anchors points is more than 1KM one more directional stone is to be fixed. So alos, for the road crossings, railway crossing and nala crossings on both the sides. | 5 | Nos (Each Stone) | - | - |
| 4 | Conducting Soil resistivity test along the selected route and submitting the test results in the form of draft report as detailed in the technical specifications. | 2 | Nos. (Per Test) | - | - |
| 5Preparation of Schedule and Documents | |||||
| 5.01 | PTCC Proposal containing PTCC questionnaires, topo sheet extracts with marking of the proposed line, SR report, tower sketch, station single line diagram etc. (10 copies/set) | 1 | Per Set | - | - |
| 5.02 | Tree schedule containing the details like name of tree girth size, distance from central line of the alignment, approx height of tree etc., complete and submission of draft report for approval .The details shall bed survey no.wise along the corridor. (As Per Technical Specification) | 5 | KM | - | - |
| 5.03 | Forest proposal inclusives of all works like fixing of stones of size 0.15 X0.15X1.00m buried in the ground at every 20 mts in the centre line and both ends of the corridor , painting of each tree , taking girth size of all the tree coming in the corridor at 1 Mtr height from GL, approximate height of the treetree and forest clearance proposals etc. complete including submission of report /proposal in 6 sets (both Soft &Hard copies). The work shall be carried out as per requirement and as per instruction of Engineer -in- charge & as per latest circular of Forest Department. | 1 | Per KM | - | - |
| 6 | Submission of Detailed consolidated report on the surveying work done appending all approved draft reports including all relevant information collected during survey, calibration certificates of the instruments used for the work, photos taken at site and submitting soft copies of all documents and report in 6 sets. The detailed report shall contain following approved draft reports.
Preliminary Report
Detailed Survey Report
Soil Resistivity Report
Soil classification report with location wise
Tree Schedule
Line Schedule
Burgie details
Digitized contours
Digitized village map geo reference and superimposed on the line corridor | 1 | Job | - | - |
| 7Detailed Soil Investigation Work as per Specification ( The location are selected by field official of AEGCL | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Bid_Document_132KV.pdf
Tender Documents • 3.11 MB
ifb.pdf
Tender Documents • 0.39 MB
BOQ_82383.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].