| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance PRAYAGRAJ | UTTAR PRADESH | 211001 | -25.60% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | -18.86% | ₹1.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.4 CrAdmitted-Finance | -18.37% | ₹1.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.5 CrAdmitted-Finance | -14.30% | ₹1.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.5 CrAdmitted-Finance | -12.85% | ₹1.5 Cr | L5 | Admitted-Finance |
Updated dates
Tender Value
₹1.7 Cr
EMD Value
₹10.6 L
Closing Date
31 Mar 2026, 5:00 pmClosed
Office of Chief Project Manager, Prayagraj Zone U
Office of Chief Project Manager, Prayagraj Zone U.p state Bridge Corporation Ltd. Prayagraj
Providing and Laying Earth, GSB,WMM,Prime Coat,Tack Coat,DBM , BC etc. in Service Road,RE Wall and viaduct Portion for Construction of 02 LANE R.O.B. AT LEVEL X-ING NO. 415A/3E AT RAIL SECTION NAINI-MANKIPUR ON SHANKARGARH-NARI-BARI IN DISTT. PRAY
2026_UPSBC_1124186_1
3272/E-tender-53/25-26 d11/3/26
Open Tender
Civil Works - Bridges
prayagraj
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
As Per Tender Document
₹10.6 L
Office of Chief Project Manager, Prayagraj Zone U
23 Apr 2026
12 Mar 2026
1 Apr 2026
12 Mar 2026
31 Mar 2026
12 Mar 2026
20 Mar 2026
Service Road and Bituminous work on Viaduct portion & R E Wall work complee in all respect with materials,Labours, Machines,Minor T&P as required and as per PWD Specifications/MORTH/IRC
Work on R E Wall
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Providing and applying prime coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Service Road
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per Morth clause 12.1 (304)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per Morth clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying prime coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Work on Viaduct portion
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.57 MB
BOQ_2094972.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid