Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 CrAdmitted-Finance 43 TRIDEEP BUNGLOW MIDDLE CLASS HSG SOC NEXT TO ARYAN SCHOOL GROUND PALGHAR MAHARASHTRA | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | L1 | Admitted-Finance | |
| 2 | L2₹18.2 Cr+₹3.4 Cr (22.6%)Admitted-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L2 | Admitted-Finance | |
| 3 | L3₹19.5 Cr+₹4.6 Cr (30.9%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical 201 202 A WING RAMESHRAMJIV BLDG BHAUSAHEB PALGHAR DANDEKAR MARG DIST PALGHAR 401 404 | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | - | Rejected-Technical not meeting NIT criteria |
| Sl No | Description | Qty | Unit | QUICK BUILDERS L3 | Shubham EPC Private Limited L2 | DIPAK S PIMPLE ENGINEERS AND CONTRACTORS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Section A - Excavation and Earth Work
Earth work excavation by mechanical means (Hydraulic excavator) /manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass ,etc. complete and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from average ground level | 9,945 | cum | 300 ₹29,83,500 | 145 ₹14,42,025 | 77 ₹7,65,765 Lowest |
| 2.00 | Extra over Item 1 initial depth for every additional Depth of 1.50 m or part thereof | 4,000 | cum | 60 ₹2,40,000 | 50 ₹2,00,000 | 41 ₹1,64,000 Lowest |
| 3.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from average ground level | 13,000 | cum | 600 ₹78,00,000 | 175 ₹22,75,000 Lowest | 242 ₹31,46,000 |
| 4.00 | Extra over Item 3 initial depth for every additional Depth of 1.50 m or part thereof | 22,833 | cum | 100 ₹22,83,300 | 75 ₹17,12,475 | 36 ₹8,21,988 Lowest |
| 5.00 | Earth work excavation in foundation in Hard Rock by Chiselling and/or by mechanical means (Hydraulic excavator) /Manual means including dewatering if necessary, dressing the sides, ramming the bottom, and stacking and / or disposing within a distance of 200 m and, each layer well rammed and consolidated etc. complete all as per specifications and as directed by the Engineer-in-Charge.
From 0.00 to 1.50 m depth from average ground level | 7,780 | cum | 950 ₹73,91,000 | 450 ₹35,01,000 | 423 ₹32,90,940 Lowest |
| 6.00 | Extra over Item 5 initial depth for every additional Depth of 1.50 m or part thereof | 21,170 | cum | 140 ₹29,63,800 | 100 ₹21,17,000 | 47 ₹9,94,990 Lowest |
| 7.00 | Lead charges for 2-3 Km by mechanical transport including loading unloading, stacking / levelling etc.
For Soil | 9,945 | cum | 175 ₹17,40,375 | 95 ₹9,44,775 | 70 ₹6,96,150 Lowest |
| 8.00 | Lead charges for 2-3 Km by mechanical transport including loading unloading, stacking / levelling etc
For Soft Rock & Hard Rock | 20,780 | cum | 200 ₹41,56,000 | 115 ₹23,89,700 | 101 ₹20,98,780 Lowest |
| 9.00 | Supplying and injecting with approved quality chemical emulsion at the rates and concentrations as per IS 6313-2001 Part II for preconstructional antitermite treatment and creating a chemical barrier under and around the masonry pits, masonry foundations, wall trenches, plinth filling, junctions of wall and floor, expansion joints, surfaces of RCC works for a depth of min. 500 mm from the finished ground level, surrounding of pipes, conduits etc., walls retaining soil above floor level, apron and drain along the perimeter of the building including all byeworks complete as per specification / IS 6313:2001 or latest revision and direction of Engineer In charge (only ground floor plinth area of the building will be measured for the payment in the following three stages. i) 20% after completion of the foundations ii) 50% after completion of the ground floor flooring iii) 30% after completion of all treatment works including ground floor doors & windows. Work to be executed by approved agency and specified guarantee for 10 (ten) years shall be furnished by the contractor. | 2,450 | sqm | 175 ₹4,28,750 | 125 ₹3,06,250 | 88 ₹2,15,600 Lowest |
| 10.00 | Labour charges for murum filling under floors of specified thick in layers of not exceeding 150 mm thickness including consolidation etc. complete (using murrum available at site) as per Technical Specifications | 31,211 | cum | 250 ₹78,02,750 | 250 ₹78,02,750 | 139 ₹43,38,329 Lowest |
Tender Value
₹22 Cr
EMD Value
₹32 L
Closing Date
28 May 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive, NRB
NRB, BARC Trombay
Construction of FFF Admin Building at INRPC, NRB, BARC, Tarapur
2024_NRB_804543_1
BARC/NRB/INRPC/PTC110/2024/779
Open Tender
Civil Works
Item Rate
610 days
BARC, NRB, Tarapur
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹32 L
Project Director Office, INRPC, NRB, BARC TARAPUR
7 Oct 2024
23 Apr 2024
30 May 2024
23 Apr 2024
28 May 2024
21 May 2024
23 Apr 2024 - 7 May 2024
9 May 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Section A - Excavation and Earth Work
Earth work excavation by mechanical means (Hydraulic excavator) /manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass ,etc. complete and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from average ground level | 9,945 | cum | - | - |
| 2 | Extra over Item 1 initial depth for every additional Depth of 1.50 m or part thereof | 4,000 | cum | - | - |
| 3 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from average ground level | 13,000 | cum | - | - |
| 4 | Extra over Item 3 initial depth for every additional Depth of 1.50 m or part thereof | 22,833 | cum | - | - |
| 5 | Earth work excavation in foundation in Hard Rock by Chiselling and/or by mechanical means (Hydraulic excavator) /Manual means including dewatering if necessary, dressing the sides, ramming the bottom, and stacking and / or disposing within a distance of 200 m and, each layer well rammed and consolidated etc. complete all as per specifications and as directed by the Engineer-in-Charge.
From 0.00 to 1.50 m depth from average ground level | 7,780 | cum | - | - |
| 6 | Extra over Item 5 initial depth for every additional Depth of 1.50 m or part thereof | 21,170 | cum | - | - |
| 7 | Lead charges for 2-3 Km by mechanical transport including loading unloading, stacking / levelling etc.
For Soil | 9,945 | cum | - | - |
| 8 | Lead charges for 2-3 Km by mechanical transport including loading unloading, stacking / levelling etc
For Soft Rock & Hard Rock | 20,780 | cum | - | - |
| 9 | Supplying and injecting with approved quality chemical emulsion at the rates and concentrations as per IS 6313-2001 Part II for preconstructional antitermite treatment and creating a chemical barrier under and around the masonry pits, masonry foundations, wall trenches, plinth filling, junctions of wall and floor, expansion joints, surfaces of RCC works for a depth of min. 500 mm from the finished ground level, surrounding of pipes, conduits etc., walls retaining soil above floor level, apron and drain along the perimeter of the building including all byeworks complete as per specification / IS 6313:2001 or latest revision and direction of Engineer In charge (only ground floor plinth area of the building will be measured for the payment in the following three stages. i) 20% after completion of the foundations ii) 50% after completion of the ground floor flooring iii) 30% after completion of all treatment works including ground floor doors & windows. Work to be executed by approved agency and specified guarantee for 10 (ten) years shall be furnished by the contractor. | 2,450 | sqm | - | - |
| 10 | Labour charges for murum filling under floors of specified thick in layers of not exceeding 150 mm thickness including consolidation etc. complete (using murrum available at site) as per Technical Specifications | 31,211 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.53 MB
TenderBookPTC110.pdf
Tender Documents • 17.78 MB
TechnicalBidPTC110.xls
Tender Documents • 0.06 MB
BOQ_845659.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .