| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | ₹17.0 L | L1 | Accepted-AOC Bid Accepted as the Bidder Quoted Lowest Value (L1 Bidder), |
| 2 | L2₹17.3 LRejected-AOC NO 4ARUN AVENUE SIVANATHA NAGAR K PUDHUR MADURAI 625 007 | MADURAI | TAMIL NADU | 625007 | ₹17.3 L | L2 | Rejected-AOC Bid Rejected as the Bidder Quoted Highest Value (L2 Bidder) |
| 3 | L3₹17.5 LRejected-AOC | ₹17.5 L | L3 | Rejected-AOC Bid Rejected as the Bidder Quoted Highest Value (L3 Bidder) |
| Sl No | Description | Qty | Unit | Duraisamy L3 | MIRUTHI CONSTRUCTION L1 | Karuppasamy L2 |
|---|---|---|---|---|---|---|
| 1.00 | Formation of the BT road from Uppilipalayam AD Colony road to Burial ground road (via) Amma Park Km 0/0 - 0/53 R-137 | 1 | nos | - | - | - |
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete. | 162 | sqm | 7 ₹1,134 | 6 ₹972 | 6 ₹972 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m including all labour charges etc complete | 666.25 | sqm | 25 ₹16,656.25 | 23 ₹15,323.75 | 23 ₹15,323.75 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 18 | cum | 430 ₹7,740 | 420 ₹7,560 | 423 ₹7,614 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 249.84 | cum | 2,550 ₹6.4 L | 2,500 ₹6.2 L | 2,535.5 ₹6.3 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,998.76 | sqm | 90 ₹1.8 L | 87 ₹1.7 L | 87 ₹1.7 L |
| 7.00 | Applying TACK COAT over WMM surface at 2.5Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,998.76 | sqm | 22 ₹43,972.72 | 20 ₹39,975.20 | 20 ₹39,975.20 |
| 8.00 | BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 49.97 | cum | 11,900 ₹5.9 L | 11,500 ₹5.7 L | 11,894 ₹5.9 L |
| 9.00 | Nameboard | 1 | nos | 5,000 ₹5,000 | 4,000 ₹4,000 | 4,000 ₹4,000 |
| 10.00 | Photocharges | 1 | nos | 1,000 ₹1,000 | 500 ₹500 | 500 ₹500 |
Tender Value
₹17.5 L
EMD Value
₹17,530
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Develpoment officer(VP)
Panchayat Union office,Palladam
Formation of the BT road from Uppilipalayam AD Colony road to Burial ground road (via) Amma Park Km 0/0 - 0/53 R-137
2026_RDTN_661039_1
3162/2024/A2
Open Tender
Civil Works
Panchayat Union office, Palladam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,530
Panchayat Union office,Palladam
26 Feb 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
21 Feb 2026
Formation of the BT road from Uppilipalayam AD Colony road to Burial ground road (via) Amma Park Km 0/0 - 0/53 R-137
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m including all labour charges etc complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Applying TACK COAT over WMM surface at 2.5Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Nameboard
Photocharges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.30 MB
TBpkg5.pdf
Tender Documents • 1.13 MB
BOQ_793294.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid