Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78,640Admitted-Finance | ₹78,640 | L1 | Admitted-Finance |
| 2 | L2₹83,810+₹5,170 (6.57%)Admitted-Finance | ₹83,810+₹5,170 (6.57%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UMAR ELECTRICALS L2 | Smart Power L1 |
|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 11 Mtr Long (410-SP-56) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 1 | No. | 38,000 ₹38,000 | 36,800 ₹36,800 Lowest |
| 2.00 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 50 mm2 ACSR Conductor (Rabbit) , including joints by PG clamps wherever required as per REC standard. | 0.4 | kms | 85,000 ₹34,000 | 75,000 ₹30,000 Lowest |
| 3.00 | Cement bottoming of S T Ploes 11Mtrs long in 1:2:4 mix , 0.66 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 1 | No | 3,200 ₹3,200 | 1,800 ₹1,800 Lowest |
| 4.00 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix , 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 1 | No | 2,900 ₹1,160 | 1,500 ₹600 Lowest |
| 5.00 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 1 | No | 850 ₹850 Lowest | 910 ₹910 |
| 6.00 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 4 | No | 2,250 ₹2,250 Lowest | 2,250 ₹2,250 Lowest |
| 7.00 | Supply & fixing of GI nuts and bolts of sizes | 4 | kgs | 150 ₹150 Lowest | 180 ₹180 |
| 8.00 | Supply , installation ,testing & commissioning of GI “V’ cross-arm (75x40x40x6)mm with Pole Top Bracket including back clamps of 50X8 mm for fixing V-Cross arm and pole top bracket as per REC standard. | 20 | Kgs | 150 ₹600 Lowest | 175 ₹700 |
| 9.00 | Supply & fixing ,testing, commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm as per REC specification. | 3 | No | 850 ₹2,550 Lowest | 1,250 ₹3,750 |
| 10.00 | Supply , installation ,testing , commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mmas per REC specifications. | 3 | No | 350 ₹1,050 Lowest | 550 ₹1,650 |
Tender Value
₹79,500
EMD Value
₹1,600
Closing Date
21 May 2026, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Diversion of 11KV line near Bakihakher Bridge under juridiction of ED Handwara
2026_PDD_308234_2
e-nit 06 of 2026-27
Open Tender
Electrical Works
Turn-key
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹200
Office of Executive Engineer ED Handwara
₹1,600
5 Jun 2026
15 May 2026
22 May 2026
15 May 2026
21 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 11 Mtr Long (410-SP-56) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 1 | No. | - | - |
| 2 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 50 mm2 ACSR Conductor (Rabbit) , including joints by PG clamps wherever required as per REC standard. | 0.4 | kms | - | - |
| 3 | Cement bottoming of S T Ploes 11Mtrs long in 1:2:4 mix , 0.66 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 1 | No | - | - |
| 4 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix , 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 1 | No | - | - |
| 5 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 1 | No | - | - |
| 6 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 4 | No | - | - |
| 7 | Supply & fixing of GI nuts and bolts of sizes | 4 | kgs | - | - |
| 8 | Supply , installation ,testing & commissioning of GI “V’ cross-arm (75x40x40x6)mm with Pole Top Bracket including back clamps of 50X8 mm for fixing V-Cross arm and pole top bracket as per REC standard. | 20 | Kgs | - | - |
| 9 | Supply & fixing ,testing, commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm as per REC specification. | 3 | No | - | - |
| 10 | Supply , installation ,testing , commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mmas per REC specifications. | 3 | No | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.08 MB
BOQ_1003196.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .