Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L1 | Accepted-AOC Admit |
| 2 | L2₹3.1 Cr+₹11.0 L (3.67%)Rejected-Finance NO 37 MAIN ROAD EDA KEELAIYUR NEEDAMANGALAM TALUK THIRUVARUR DISTRICT 614013 | EDA KEELAIYUR | THIRUVARUR | TAMIL NADU | 614013 | ₹3.1 Cr+₹11.0 L (3.67%) | L2 | Rejected-Finance L2 bid rank |
Tender Value
Refer Docs
EMD Value
₹5.9 L
Closing Date
19 Jul 2024, 3:00 pmClosed
Additional Collector(Dev)/Project Director
1st floor, DRDA, Collectorate campus,Tiruvarur
MRL46-Pullavarayankudikadu - Moovarkottai seenikudikadu road km 4.775
2024_RDTN_134200_1
TN21390
Open Tender
Civil Works - Roads
Item Rate
270 days
Needamangalam Block
As per Tender Document
8 documents required · 8 mandatory
₹0
₹5.9 L
1st floor, DRDA, Collectorate campus,Tiruvarur
1 Oct 2024
16 May 2024
19 Jul 2024
16 May 2024
19 Jul 2024
16 May 2024
29 May 2024
Amount
Strengthening of road from MRL - 46 Pullavarayankudikadu to Moovarkottai - Seenikudikadu Road Km. 0/0 - 4/775
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification (Carted Earth borrow bits)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using fly ash obtained from industries with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using Stone Dust to improve CBR 7 to 9))
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Grading III
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Mix Seal Surfacing 25mm thick (Using Waste Plastic) Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground levels as per drawings and Technical Specification Clause 801
logo board
sign board
Circular board
Octagonal board
Citizen board
Name board
Maintanance board
Guard Stone
Provision for kilometre stones
Provision for Hectametre stones
Construction of Pipe culvert @ Ch.0/650
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Pipe culvert @ Ch.1/440, 1/925
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Pipe culvert @ Ch.2/850
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Pipe culvert @ Ch.3/340, 3/680
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Pipe culvert @ Ch.4/770
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Protective work @ Km. 0/015 - 0/045 RHS,Km. 0/285 - 0/305 RHS,Km. 0/655 - 0/670 RHS,Km. 1/050 - 1/065 RHS,Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS,Km. 3/080 - 3/090 RHS.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Km. 0/015 - 0/045 RHS, Km. 0/285 - 0/305 RHS, Km. 0/655 - 0/670 RHS
Km. 1/050 - 1/065 RHS
Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS
Km. 3/080 - 3/090 RHS
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Km. 0/015 - 0/045 RHS, Km. 0/285 - 0/305 RHS, Km. 0/655 - 0/670 RHS
Km. 1/050 - 1/065 RHS
Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS
Km. 3/080 - 3/090 RHS
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Km. 0/015 - 0/045 RHS, Km. 0/285 - 0/305 RHS, Km. 0/655 - 0/670 RHS
Km. 1/050 - 1/065 RHS
Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS
Km. 3/080 - 3/090 RHS
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Km. 0/015 - 0/045 RHS, Km. 0/285 - 0/305 RHS, Km. 0/655 - 0/670 RHS
Km. 1/050 - 1/065 RHS
Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS
Km. 3/080 - 3/090 RHS
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Km. 0/015 - 0/045 RHS, Km. 0/285 - 0/305 RHS, Km. 0/655 - 0/670 RHS
Km. 1/050 - 1/065 RHS
Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS
Km. 3/080 - 3/090 RHS
Providing weepholes in brick masonry / stone masonry , plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(v) : 20 (H) towards drawing face complete as per drawing and technical specification clauses 614, 709,1024.3.7
Km. 0/015 - 0/045 RHS, Km. 0/285 - 0/305 RHS, Km. 0/655 - 0/670 RHS
Km. 1/050 - 1/065 RHS
Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS
Km. 3/080 - 3/090 RHS
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Km. 0/015 - 0/045 RHS,Km. 0/285 - 0/305 RHS,Km. 0/655 - 0/670 RHS,Km. 1/050 - 1/065 RHS,Km. 2/140 - 2/155 RHS, Km. 2/320 - 2/335 RHS, Km. 2/700 - 2/715 RHS, Km. 2/940 - 2/955 RHS,Km. 3/080 - 3/090 RHS.
Dismantling Existing CD works @ Km. , , 3/680, 4/770 , 0/650, 1/440, 1/925, 2/850, 3/340
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S SENTHAMILSELVAN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .