Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹78,349Accepted-AOC VILL R AMRAI 126102 | JIND | JIND | HARYANA | 126102 | 1 | Accepted-AOC ok |
Tender Value
Refer Docs
Closing Date
4 May 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer, Jind Water Services Division, Jind
Repair of patch of JD No. 6A at RD 35600 and Construction of culvert at RD 300 and 1500 of Sangat pura Minor
2022_HRY_218029_5
3990
Open Tender
Civil Works
Works
60 days
Jind
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
31 Mar 2025
25 Apr 2022
5 May 2022
25 Apr 2022
4 May 2022
25 Apr 2022
Amount
Excavating, supplying and filling of local earth (including royalty) cum by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete HSR 4.33
Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting outand disposal of excavated earth lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-charge All kinds of soil HSR 4.12.1
Providing and laying 75 mm in position M-15 cement concerete 240 Kg/Cum in slope including rendering cement sand slurry HSR item No. 14.10.1.2.1
Providing and laying 75 mm in position 1:2:4 cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level HSR 6.1.2
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand) HSR No.7.21.1
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete HSR 6.30.1
Providing and 1 : 1.5: 3 ( 1 cement : 1.5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size)laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level HSR 6.14.1
Cold twisted bars Steel reinforcement for R.C.C. work HSR 6.33.3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .