Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC 3 5 1111 17 TO 22 NARAYANAGUDA RAJMOHALLA HYDERABAD HYDERABAD TELANGANA 500029 | HYDERABAD | TELANGANA | 500029 | ₹3.1 L Quoted ₹2.8 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRINIVASA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for de-watering of clarifier, mixing the mud / fine sludge deposits with water while de-watering in clarifier of size 18 M radius x 6.5 M depth. | 1 | No | 14,798 ₹14,798 |
| 2.00 | Charges for removing sludge and other foreign particles from the clarifier of size 18 M x 6.5 M depth. | 1 | No | 22,188 ₹22,188 |
| 3.00 | Charges for cleaning the algae deposits on the side walls of both inner and outer rings of clarifier and bottom surface with coir/wire brush. Applying and cleaning with bleaching powder on both side walls of inner ring & outer rings and also at bottom surface in clarifier of size 18 M x 6.5M depth | 1 | No | 22,188 ₹22,188 |
| 4.00 | Charges for de-watering of sludge disposal pit, removal of sludge from sludge disposal pit, and also tunnel pipes from clarifier to sludge pit. Cleaning of algae deposits with coir / wire brush, and applying & cleaning with bleaching powder on inside walls of sludge pit, flash mixing chamber. | 1 | No | 9,861 ₹9,861 |
| 5.00 | Charges for removing the rust and old paint from the structure immersed in the water of clarifier and above the water level exposed to atmosphere , inlet and outlet valves exposed to atmosphere of clarifier-II. | 410 | m2 | 35 ₹14,350 |
| 6.00 | Charges for painting with one coat of rust convertor (Impodex / Impodor), one coat of epoxy red oxide primer and one coat of epoxy coal thar black paint one over the other with proper intervals for clarifier structures immersed in the water and above the water level exposed to atmosphere and structure frame inside flash mixing chamber, inlet and out let valves and clarifier inner and outer ring fabricated sun shield roof structures and man hole door frames of Clarifier– II. | 436 | m2 | 222 ₹96,792 |
| 7.00 | Charges for cutting and removal of existing deteriorated bolts of scrappers, removing damaged scrapers, cutting of scrapper rubber to required dimension from old Conveyor Belt, marking and making holes on scrapper rubber and fixing with new G.I Bolts and nuts in the traction drive in Clarifier II. | 2 | Nos | 8,458 ₹16,916 |
| 8.00 | Charges for Petty iron works for renewal of M.S angle in the structure of the Traction/ Flocculater drive including removing the existing corroded / damaged and cutting the M.S. angle size to the required size, leading , lifting, positioning & welding for Strengthening in clarifier II.(Required qty. of M.S. angle will be supplied by TANGEDCO at free of cost) | 230 | kg | 60 ₹13,800 |
| 9.00 | Cost of Rust Convertor for Sl.No.6 | 44 | kg | 175 ₹7,700 |
| 10.00 | Cost of Epoxy red oxide Primer for Sl.No.6 | 48 | liter | 236.25 ₹11,340 |
Tender Value
Refer Docs
EMD Value
₹2,900
Closing Date
15 Oct 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of Clarifier II during COH 2024 25
2024_EB_490019_1
CE / MTPS-I / SE / M-I / CA /OT. 206 / 2024-25
Open Tender
Power/Energy Projects/Products
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,900
Yes
19 May 2026
1 Oct 2024
16 Oct 2024
1 Oct 2024
15 Oct 2024
1 Oct 2024
Amount
Charges for de-watering of clarifier, mixing the mud / fine sludge deposits with water while de-watering in clarifier of size 18 M radius x 6.5 M depth.
Charges for removing sludge and other foreign particles from the clarifier of size 18 M x 6.5 M depth.
Charges for cleaning the algae deposits on the side walls of both inner and outer rings of clarifier and bottom surface with coir/wire brush. Applying and cleaning with bleaching powder on both side walls of inner ring & outer rings and also at bottom surface in clarifier of size 18 M x 6.5M depth
Charges for de-watering of sludge disposal pit, removal of sludge from sludge disposal pit, and also tunnel pipes from clarifier to sludge pit. Cleaning of algae deposits with coir / wire brush, and applying & cleaning with bleaching powder on inside walls of sludge pit, flash mixing chamber.
Charges for removing the rust and old paint from the structure immersed in the water of clarifier and above the water level exposed to atmosphere , inlet and outlet valves exposed to atmosphere of clarifier-II.
Charges for painting with one coat of rust convertor (Impodex / Impodor), one coat of epoxy red oxide primer and one coat of epoxy coal thar black paint one over the other with proper intervals for clarifier structures immersed in the water and above the water level exposed to atmosphere and structure frame inside flash mixing chamber, inlet and out let valves and clarifier inner and outer ring fabricated sun shield roof structures and man hole door frames of Clarifier– II.
Charges for cutting and removal of existing deteriorated bolts of scrappers, removing damaged scrapers, cutting of scrapper rubber to required dimension from old Conveyor Belt, marking and making holes on scrapper rubber and fixing with new G.I Bolts and nuts in the traction drive in Clarifier II.
Charges for Petty iron works for renewal of M.S angle in the structure of the Traction/ Flocculater drive including removing the existing corroded / damaged and cutting the M.S. angle size to the required size, leading , lifting, positioning & welding for Strengthening in clarifier II.(Required qty. of M.S. angle will be supplied by TANGEDCO at free of cost)
Cost of Rust Convertor for Sl.No.6
Cost of Epoxy red oxide Primer for Sl.No.6
Cost of Coal Thar Black Paint for Sl.No.6
Cost Epoxy Thinner for Sl.No.6
Cost of Stable Bleaching Powder for Sl.No.3&4
Cost of M12x70mm full thread bolt with nut and 2washers for Sl.No.7
Cost of cutting Gas for Sl.No.8
Cost of Welding electrode for Sl.No.8
Cost of Consumable and T&P for Sl.No.1to 8
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_582230.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid