Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.4 L+₹690.06 (0.13%)Admitted-Fee/PreQual/Technical/Finance | ₹5.4 L+₹690.06 (0.13%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Ramakrishnan E L1 | A.AKBAR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Waiting shed building at Dhargas at Hanumanthapuram panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .1/2026-27 scheme of Unauthorised funds | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc | 3.5 | Cum | 263 ₹920.5 Lowest | 350 ₹1,225 |
| 3.00 | Filling with Msand including cost and Conveyance of all charges etc. | 7.14 | Cum | 1,746 ₹12,466.44 Lowest | 1,800 ₹12,852 |
| 4.00 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 7.66 | Cum | 5,356 ₹41,026.96 Lowest | 5,356 ₹41,026.96 Lowest |
| 5.00 | CC 1:2:4 mix using 20mm ISS HBG Metal including all cost and conveyance etc.complete. | 3.3 | Cum | 6,659 ₹21,974.7 Lowest | 6,659 ₹21,974.7 Lowest |
| 6.00 | RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp | 11.73 | Cum | 9,098 ₹1,06,719.54 Lowest | 9,098 ₹1,06,719.54 Lowest |
| 7.00 | Supplying and centering of sides and sofits includign supports and strutting upto base | 19.17 | Sqm | 547 ₹10,485.99 Lowest | 547 ₹10,485.99 Lowest |
| 8.00 | Supplying and centering of sides and sofits includign supports and strutting Above base | 65.33 | Sqm | 1,095 ₹71,536.35 Lowest | 1,095 ₹71,536.35 Lowest |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of all labour charges ' | 1 | MT | 91,930 ₹91,930 Lowest | 91,930 ₹91,930 Lowest |
| 10.00 | Brick work in cm 1:5 for super structure usign stock brick including all cost and labour charges etc.complete . Complying with standard specification etc. | 2.7 | Cum | 6,106 ₹16,486.2 Lowest | 6,106 ₹16,486.2 Lowest |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
24 Aug 2026, 3:00 pmClosed
Block Developement Officer VP Thiruporur
Block Developement Office Thiruporur
Construction of Waiting Shed building at Dhatgas in Hanumanthapuram Panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026 - 2027 having Package No . 1/2026- 2027
2026_RDTN_691895_1
RCNO 186/2026/A3/ dt 24.7.2026
Open Tender
Civil Works - Buildings
Item Rate
Hanumanthapuram
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7,000
Yes
Block Developement Office Thiruporur
2 Sept 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Waiting shed building at Dhargas at Hanumanthapuram panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .1/2026-27 scheme of Unauthorised funds | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc | 3.5 | Cum | - | - |
| 3 | Filling with Msand including cost and Conveyance of all charges etc. | 7.14 | Cum | - | - |
| 4 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 7.66 | Cum | - | - |
| 5 | CC 1:2:4 mix using 20mm ISS HBG Metal including all cost and conveyance etc.complete. | 3.3 | Cum | - | - |
| 6 | RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp | - | Cum | - | - |
| 7 | Supplying and centering of sides and sofits includign supports and strutting upto base | 19.17 | Sqm | - | - |
| 8 | Supplying and centering of sides and sofits includign supports and strutting Above base | 65.33 | Sqm | - | - |
| 9 | Supplying and fabrication of steel including cost and conveyance of all labour charges ' | 1 | MT | - | - |
| 10 | Brick work in cm 1:5 for super structure usign stock brick including all cost and labour charges etc.complete . Complying with standard specification etc. | - | Cum | - | - |
stage.html
html • 0.02 MB
finance_831931.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Technical.pdf
Tender Documents • 0.82 MB
BOQ_831931.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .