Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 CrAccepted-AOC | ₹43.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹44.7 CrRejected-Finance 0 | ₹44.7 Cr | L2 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 3 | L3₹46.1 CrRejected-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | ₹46.1 Cr | L3 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 4 | L4₹46.7 CrRejected-Finance | ₹46.7 Cr | L4 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 5 | L5₹46.7 CrRejected-Finance S 6 IIND FLOOR FRIENDS TRADE CENTRE NEHRU NAGAR AGRA | AGRA | UTTAR PRADESH | ₹46.7 Cr | L5 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
Tender Value
₹56 Cr
EMD Value
₹56 L
Closing Date
18 Aug 2023, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
WIDENING AND STRENGTHENING OF PRATAP NAGAR MADHOGANJ ROAD ODR CH-0.00 TO 20.400 IN FY 2023-24 UNDER RIDF SCHEME-29 (LENGTH 20.400 KM) IN DIST-HARDOI
2023_CEUCZ_826963_1
4426/M/1MT/E-TENDER/U.C/2023 DT. 15.07.2023
Open Tender
Civil Works - Roads
540 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹56 L
Yes
OFFICE OF SUPERINTENDING ENGINEER
13 Dec 2023
7 Aug 2023
18 Aug 2023
7 Aug 2023
18 Aug 2023
7 Aug 2023
10 Aug 2023
Amount
(Excavation in soil using Hydraulic Excavator and tipper with disposal upto 1000 metres) Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location within all lifts and lead upto 1000 m. (including Labour Cess but excluding GST)
(Construction of Embankment with Material Deposited from Roadway Cutting) Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table No 300-2 (Compaction only) (including Labour Cess but excluding GST)
(Construction of Embankment with Material obtained from pits) Construction of embankment with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table No 300-2 (including Labour Cess but excluding GST)
(Construction of Embankment with Material obtained from borrow pits) Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table No 300-2 (including Labour Cess but excluding GST)
(Construction of Subgrade and Earthen Shoulders) Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2 (including Labour Cess but excluding GST)
(By Mix in Place Method) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401. (in widening portion) (including Labour Cess but excluding GST)
{(Wet Mix Macadam (Plant Mix Method)} Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including Labour Cess but excluding GST)
{(Wet Mix Macadam add (cement @ 1% + Emulsion @ 3.5%)} Providing ,Laying, spreading and compacting stone aggregate to wet mix macadam (with 3.5% emulsion and OPC cement @ 1% by weight of mix) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base coarse on well prepared surface and compacting with vibratory roller to achieve the desired density. (including Labour Cess but excluding GST)
(Dense Graded Bituminous Macadam Grading-II) Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects. (including Labour Cess but excluding GST)
(Tack Coat on Bituminous surfaces) Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with mechanical broom. (including Labour Cess but excluding GST)
(Bituminous Concrete Grading-II) Providing and laying bituminious concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. (including Labour Cess but excluding GST)
Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (including Labour Cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (including Labour Cess but excluding GST)
Brick masonry work in 1:3 in substructure complete excluding pointing and plastering as per drawing and Technical Speficiations. (including Labour Cess but excluding GST)
Plain/reinforced cement concrete in Open foundation complete as per drawing and technical specifications using batching plant, transit mixer and concrete pump. Grade M20 (including Labour Cess but excluding GST)
Plain/reinforced cement concrete in Open foundation complete as per drawing and technical specifications using batching plant, transit mixer and concrete pump. Grade M25 (including Labour Cess but excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical Specifications. (including Labour Cess but excluding GST)
Supplying, Fitting and Placing un-coated Mild steel reinforcement in Foundation complete as per Drawing and Technical Specifications. (including Labour Cess but excluding GST)
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications. (including Labour Cess but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (including Labour Cess but excluding GST)
Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Brick Masonry work in 1:3 in substructure complete excluding pointing and plastering, as per Drawing and Technical Specifications. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Plain/reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant, transit mixer & manual placing (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Supplying, fitting and placing un-coated Mild steel reinforcement in Foundation complete as per Drawing and Technical Specifications. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Providing weep holes in Brick masonry/plain/ Reinforceed concrete abutment, wing wall/return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1(V):20(H) towards drawing face. Complete as per drawing and Technical Specifications. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Back Filling behind abutment, wing wall and retuirn wall complete as per drawing and Technical Specification. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical Specification. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (for 2x6, 4x6m span minor bridge) (including Labour Cess but excluding GST)
Maintenance of constructed road for next five years after the actual date of completion. The contractor shall be paid total maintenance cost as for five years in the form of installment as given below. (Rates are including labour cess but excluding GST) 1st year & 2nd year after the actual date of completion @ 10% of total maintenance cost (including Labour Cess but excluding GST)
3rd year @ 20% of total maintenance cost (including Labour Cess but excluding GST)
4th year @ 30% of total maintenance cost (including Labour Cess but excluding GST)
5th year @ 40% of total maintenance cost (including Labour Cess but excluding GST)
M/S RAJ CONSTRUCTION
M/s R And C Infraengineers Private Limited
M/S SOBTI INFRATECH LIMITED
SRS EXPRESS PRIVATE LIMITED
SHIVANSH CONSTRCUTION
M/s PBC Infrastructure India Private Limited
Srsc Infra Private Limited
SURAJ BUILDER INDIA PVT. LTD.
M/s Nirbhay Constructions
SHIV CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf