Executive Engineer (RWS), RZP
Executive Engineer (RWS) RZP
Piped Water Supply Scheme At. WESHVI (Jal Jeevan Mission)
2026_RAIGA_1299185_1
RAIGAD/RWSS/14/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
At. WESHVI
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,900
₹2.0 L
24 Aug 2026
30 Apr 2026
5 May 2026
30 Apr 2026
4 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Veshvi RCC Well (6.0m X 10m) Item No. 1 :- Excavation for foundation / pipe trenches in earth soil of all type sand gravel and soft murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for etc. complete Lift 0.00 M to 1.50 m | 149.03 | Cum | 150 | ₹22,354.5 |
| 2 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for etc. complete Lift 1.50 M to 3.00 m | 100.75 | Cum | 184 | ₹18,538 |
| 3 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for Lift 3.00 M to 4.50 m | 90.15 | Cum | 622 | ₹56,073.3 |
| 4 | Item No.4 :- Excavation for foundation / pipe trenches in hard rock by blasting including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed etc.complete Lift 4.50 M to 6.00 m | 80.14 | Cum | 830 | ₹66,516.2 |
| 5 | Lift 6.00 M to 7.50 m | 70.72 | Cum | 855 | ₹60,465.6 |
| 6 | Lift 7.50 M to 9.00 m | 61.89 | Cum | 880 | ₹54,463.2 |
| 7 | Lift 9.00 M to 10.00 m | 28.26 | Cum | 905 | ₹25,575.3 |
| 8 | Item No.5:- Providing and laying in situ Cement concrete in proporation .... of trap metal for foundation and bedding, including balling out water manually, formwork, compacting and curing etc. complete. P.C.C 1:2:4 | 9.24 | Cum | 6,204 | ₹57,324.96 |
| 9 | Item No. 6:- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade. 1) R.C.C. M-250for Beam | 14.14 | Cum | 9,240 | ₹1,30,653.6 |
| 10 | 2) R.C.C. M-250 for vertical wall | 36.82 | Cum | 9,910 | ₹3,64,886.2 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_2231136.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .