Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.6 LAccepted-AOC H 12 SECTOR DELTA II GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | G B NAGAR | UP | ₹82.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹87.5 LRejected-Finance | ₹87.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹88.1 LRejected-Finance | ₹88.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹89.5 LRejected-Finance | ₹89.5 L | L4 | Rejected-Finance L4 |
Tender Value
₹92.8 L
EMD Value
₹1.9 L
Closing Date
5 Feb 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Resurfacing of internal roads in LIG, MIG housing area in sector-22D, YEIDA WC-02
2026_YEIDA_1108453_20
YEA/GM(PROJECT)/2026/457 DT-19/01/2026
Open Tender
Civil Works
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,110
₹1.9 L
12 Mar 2026
27 Jan 2026
6 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
Providing and applying tack coat With bitumen VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.MORTH/503(UPPWD/SOR-2020)
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.50 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects
2.50% Maintenance for 5 years of road work
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
20.pdf
Tender Documents • 1.25 MB
BOQ_2049432.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid