| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.1 LAccepted-Finance | L-1 | Accepted-Finance L-1 Bidder | |
| 2 | L-2₹16.8 L+₹2.6 L (18.7%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹16.9 L+₹2.7 L (19.1%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder | |
| 4 | L-4₹17.3 L+₹3.1 L (22.1%)Rejected-Finance | L-4 | Rejected-Finance L-4 Bidder |
Tender Value
₹18.1 L
EMD Value
₹20,000
Closing Date
11 May 2020, 12:00 pmClosed
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
EXECUTION OF THE WORK OF CUTTING OF GRASS AND JUNGLE CLEARANCE ALONG WITH UPROOTING OF SMALL WILD TREES / PLANTS INCLUDING SPRAYING OF HERBICIDE
2020_UPTCL_447256_2
E-Tender no. 194/2019-20/ETC/VNS
Open Tender
Composite Works
Item Wise
365 days
400 KV Substation Sarnath
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹2,360
SE, ETC, Varanasi
₹20,000
21 Jul 2020
15 Apr 2020
12 May 2020
15 Apr 2020
11 May 2020
27 Apr 2020
Amount
Clearance of dense Jungle and cutting of Grass & Kusha including uprooting of the rank vegetation, grass, bushes, shrubs etc. by scrapping of grass, bush wood & plants etc. above 2 - 3 cm over the ground level; weeding out the wild growth roots, seeds etc. & collection of the foreign materials like Kankar, Ballast, Pebbles, waste papers etc. in 400KV, 220KV, 132KV & 33KV Switchyard area of the 400KV Sub Station Sarnath, Varanasi including the area between Gate No. 2 & 3, around 33KV Switchyard, around ALDS / Microwave Office, around Store Sheds and Gate No. 1 & 2 at the Sub Station, between Security Wall and Pale / Chain Link fencing in 400KV, 220KV, 132KV & 33KV Switchyard, then removal of all the rubbish & garbage etc. by throwing it outside the periphery of the Sub Station premises, with all cost of men, misc. consumables and T&P etc. required for the Job, as per details below :
1st Cutting between 1st July 2020 to 31st July 2020
2nd Cutting between 1st October 2020 to 31st October 2020
3rd Cutting between 1st January 2021 to 31st January 2021
4th Cutting between 1st April 2021 to 30th April 2021
Uprooting of small Trees in 400KV, 220KV, 132KV & 33KV Switchyard area of the 400KV Sub Station Sarnath, Varanasi including the area between Gate No. 2 & 3, around 33KV Switchyard, around ALDS / Microwave Office, around Store Sheds and Gate No. 1 & 2 at the Sub Station, between Security Wall and Pale / Chain Link fencing in 400KV, 220KV, 132KV & 33KV Switchyard and other adjoining areas by digging and taking out the complete Root, then removal of all the Rubbish & Garbage etc. by throwing it outside the periphery of the Sub Station premises and finally, Leveling the ground, with all cost of men, misc. consumables and T&P etc. required for the Job, as per details below :
1st Uprooting between 1st July 2020 to 31st July 2020
2nd Uprooting between 1st October 2020 to 31st October 2020
3rd Uprooting between 1st January 2021 to 31st January 2021
4th Uprooting between 1st April 2021 to 30th April 2021
Spraying of ‘Round Up’ / ‘Glycel’ Herbicide liquid and Ammonium Sulphate Crystal mixture after diluting it with Water in the Ratio of 1:60 with the help of Manual Operated Spraying Machine on the Grass / Wild growth / Plants in 400KV, 220KV, 132KV & 33KV Switchyard area of the 400KV Sub Station Sarnath, Varanasi including the area between Gate No. 2 & 3, around 33KV Switchyard, around ALDS / Microwave Office, around Store Sheds and Gate No. 1 & 2 at the Sub Station, between Security Wall and Pale / Chain Link fencing in 400KV, 220KV, 132KV & 33KV Switchyard and other adjoining areas in the Month of December 2020, about 15 Days before the 3rd Cutting due in the Month of January 2021, with all cost of Men, Materials, Misc. Consumables, T&Ps etc. required for satisfactory completion of the Work as per Technical Specifications & direction of the Supervising Engineer.
Disposal of Uprooted trees Vegetations, Grass, Bush, Wood, Trees and other sapling of Kusha etc. from 400/220/132 KV Switchyard including between Security Wall & Chain Link Fencing area, Control Room area and from area b/w Gate No. 1 to 3 to outside the campus of Sub Station.
Cutting down / Lopping of unwanted branches of Trees / Trees, Removing the Garbage and Cleaning the site in between Security Wall / Boundary Wall & Pale / Chain Link Fencing of 400KV, 220KV and 132KV Switchyard of 400KV Sub Station Sarnath, Varanasi.
Cleaning of Bushes & Hedge laid on Pale fencing height approx 2.4 Meter from Toe Wall, so that rust may not damage Pale Fencing Strip Angle, Stay etc. with all cost of men, misc. consumables and T&P etc. required for the Job.
1st Cleaning between July 2020 to August 2020
2nd Cleaning between January 2021 to February 2021
Cleaning of Jungle laid on Security Wall “Y” Shape angle having 8 No. Barbed Wire running throughout Security Wall so that rust may not damage Angle & Barbed Wire with all cost of men, misc. consumables and T&P etc. required for the Job.
1st Cleaning between July 2020 to August 2020
2nd Cleaning between January 2021 to February 2021
Disposal of Garbage, Tree Cutting Wood, Bushes, Grass etc. from stacked piles in between Pale / Chain Link Fencing & Security Wall / Boundary Wall to outside the Sub Station with the help of Tractor Trolley / Labour after each cutting and throwing it outside the periphery of Sub Station premises with all cost of men, misc. consumables and T&P etc. required for the Job.
M/S S P ASSOCIATE
M/s PANDEY ASSOCIATES
M/S PRABHATT ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .