| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 8 | TUTICORIN | TAMIL NADU | 626202 | ₹1.8 Cr Quoted ₹1.9 Cr | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | KUMAAR ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Supply of Mild Steel Angles including sorting out of members transport charges etc complete.The raw material standard should be as per I.S 2062 as directed by the Departmental Engineer. | 52 | MT | 1,32,500 ₹68.9 L |
| 2.00 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) | 3.3 | MT | 1,45,000 ₹4.8 L |
| 3.00 | Supply of hard ware’s as per IS conforming to latest issue. Single Suspension fittings for ACSR Panther | 15 | set | 1,900 ₹28,500 |
| 4.00 | Supply of hard ware’s as per IS conforming to latest issue. Single Tension fittings for ACSR Panther | 90 | set | 2,100 ₹1.9 L |
| 5.00 | Supply of conductor accessories as per relevant IS of latest issue. Mid span comp.joint for ACSR Panther | 5 | set | 650 ₹3,250 |
| 6.00 | Supply of conductor accessories as per relevant IS of latest issue. Repair sleeve for ACSR Panther | 5 | set | 400 ₹2,000 |
| 7.00 | Supply of conductor accessories as per relevant IS of latest issue. Vibration Damper for Panther | 90 | set | 900 ₹81,000 |
| 8.00 | Supply of Earth wire fittings as per relevant IS of latest issue. Tension Clamp for Earth wire 7/3.55mm | 14 | set | 900 ₹12,600 |
| 9.00 | Supply of Earth wire fittings as per relevant IS of latest issue. Mid span comp.joint for GS Earth wire 7/3.55mm 0.3 No. per 1 KM RL | 2 | set | 210 ₹420 |
| 10.00 | Supply of Aluminium earth bond as per relevant IS of latest issue. | 14 | No | 900 ₹12,600 |
Tender Value
₹1.7 Cr
EMD Value
₹1.5 L
Closing Date
8 Jul 2025, 2:00 pmClosed
CE TP1 CHN
Guindy 230kV GIS SS campus, Chennai - 32
Erection of 110 KV DC line on DC towers with Panther conductor making LILO in existing 110KV Veerapuram KITS park to proposed Perumattunallur SS
2025_EB_574546_1
TP1-33/2025-26 of CE/TP1/CHN
Open Tender
Civil Works - Others
180 days
Perumattunallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.5 L
22 Jan 2026
27 Jun 2025
9 Jul 2025
27 Jun 2025
8 Jul 2025
27 Jun 2025
Amount
Supply of Mild Steel Angles including sorting out of members transport charges etc complete.The raw material standard should be as per I.S 2062 as directed by the Departmental Engineer.
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply of hard ware’s as per IS conforming to latest issue. Single Suspension fittings for ACSR Panther
Supply of hard ware’s as per IS conforming to latest issue. Single Tension fittings for ACSR Panther
Supply of conductor accessories as per relevant IS of latest issue. Mid span comp.joint for ACSR Panther
Supply of conductor accessories as per relevant IS of latest issue. Repair sleeve for ACSR Panther
Supply of conductor accessories as per relevant IS of latest issue. Vibration Damper for Panther
Supply of Earth wire fittings as per relevant IS of latest issue. Tension Clamp for Earth wire 7/3.55mm
Supply of Earth wire fittings as per relevant IS of latest issue. Mid span comp.joint for GS Earth wire 7/3.55mm 0.3 No. per 1 KM RL
Supply of Aluminium earth bond as per relevant IS of latest issue.
Supply and fixing of Number plate
Supply and fixing of Danger Board
Supply and fixing of Phase plate (Set of three)
Supply and fixing of Circuit plate
Clearing juliflora jungle with uprooting including cost of all labour, lead, lift, etc., complete and as directed by the Dept. Engineer at site.
Conducting Geophysical survey to assess the availability of ground water and to locate the place of bore well
Preparation of route alignment with remote sensing and field work with GPS, preparation of route alignment iwth remote sensing and field verification in GTS map using 1:50000 scale, submission of route map in colour printout of topo sheet in 1:50000 scale using GPS & Remote sensing, conducting preliminary survey and detailed survey with GPS, Total station & DGPS, Plotting profile and tower sporting and submission of report, tower schedule, justification of angle points (25 copies) and profile in duplicate, collection and submission of land available including procurement, processing GTS map, GEO referencing, route alignment to integrate the route in the layout with identification of reserved forest, developed area etc., including cost of all materials, labour, lead, lift etc., complete as directed by Engineer at site.
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Transport, installation of stub & cleats in position & alignment including cost of template assembly, prop setting arrangements transportation charges etc, complete. - KCO type tower
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape
Supply and filling in foundation basement with filling sand in layers not more than 15cm thick well rammed and watered consolidated including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete
Transporting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete
Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
Providing PCC 1:2:4 using 12-20 mm HBG metal including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete - without form box
Providing PCC 1:2:4 using 12-20 mm HBG metal including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete - with form box
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Providing plastering C:M 1 : 5, 12mm thick including cost of all materials labour lead, lift, etc., complete in all respect
Levelling the site and removing scrub jungle and earth by engaging JCB with lead and lift etc., complete
Providing Shoring and Strutting using necessary Country Wood Planks 40mm thick and 8cm to 10cm dia. Casurina vertical posts at every 300mm c/c of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the caasurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public, transporting them to work spot, lead, lift besides the cost of materials etc., complete. (Any other improved method of shoring and strutting is also accelptable to TANTRANSCO but at no extra cost to TANTRANSCO).
Providing and fixing of 40mm dia GI Pipe for road crossing including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Providing earthing arrangements to tower including cost of 3.0m length , 40mm dia B Class GI pipe and GI earth strips connected to legs with all lead, lift, etc. complete
Dewatering charges during excavation and concreting wherever required with 3/5 HP Diesel motor with Pump including hire charges, labour, fuel, oil, transport and operator charges etc., complete.
Transport & erection of various type of towers, tower extension (complete), supply of zinc rich primer, enamel paint and application of one coat of zinc rich primer and two coats of zinc rich enamel paint over the welded portion as per technical specification and as directed by the Engineer
Transporting & Paying out of 6 Nos. Panther conductor with fittings including cost of loading and unloading, transporting, sorting out of drums at stores and at site according to drum schedule , providing trusstles, and loading and unloading, at site providing trussels and clipping cost of T&P lead and lift etc., complete. For Continuos span
Labour charges for Rough sagging, Tensioning of 6 Nos. Panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading, at site providing trussels and rough sagging tensiioning, clipping cost of T&P lead and lift etc., complete. For single span
Labour charges for Transporting through head load and hoisting of 8 units 120 KN Antifog Tension insulators with tension fittings including all materials, labours, lead, and lift, etc., complete.
Labour charges for Transporting through head load and hoisting of 7 units 90 KN Antifog suspension insulators with suspension fittings including all materials, labours, lead, and lift, etc., complete.
Stringing of one No 7/3.55 mm HTGS earth wire paying out rough sagging tensioning to correct sag and fixing to towers as per specification and as directed by the board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tension location as directed by the board, and other charges, all T&Ps required for the entire safe operation for stringing work labour lead, lifts, etc., complete.But excluding cost of line materials any defects noticed during final checking handing over to the board and commissioning of the line must be attended by the contractor without any extra cost of the Board. ( for boating arrangements) - For Single Span
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete
Providing Temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Arranging and attending shutdowns work on HT/LT, EHT lines, dismantling and restringing of HT/LT/EHT lines after completion of line stringing work including charges for T&Ps, transport all labour leads and lifts etc, complete ( one set means all the conductor and earth wire in the corresponding one no HT/LT/EHT line)
Providing Temporary trussels for major road crossing including cost of all materials lead, lift etc complete
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Name Board
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Phase plate (set of Three)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Danger Board 300x300mm
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Name plate (set of Two)
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid