| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.3 L+₹51,310.66 (6.62%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.5 L+₹80,172.91 (10.4%)Admitted-Finance GOVT CONTRACTOR VPO DHASOLI TEHSIL JAWALI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | L3 | Admitted-Finance | ||
| 4 | L4₹9.2 L+₹1.5 L (19.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | - | Not Admitted-Fee/PreQual/Technical Others-name/sno not written on CDR |
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer, REW, Jammu
Office of the Executive Engineer, REW Jammu
Constt of Community Hall near Raja Mandlik Dev Sthan at Padoon, PYT Ghar, Block Chowki Choura under APDP Scheme for the year 2025-26
2026_RDPR_324375_1
e-NIT No. 572 REWJ of 2026-27 dated 11-09-2026
Open Tender
Civil Works
Percentage
Executive Engieer, REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹19,400
29 Sept 2026
12 Sept 2026
26 Sept 2026
12 Sept 2026
25 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundation, drains, pipes cables etc. (not exceeding 1.5m in width) and for shafts wells , cesspits and the likenot exceeding10sqm on plan,including dressing of sides and ramming of bottom lift upto 1.5m , including getting out excavated earth and disposal of surplus excavated earth as directed with in lead 50mtrs neatly dressed in | 14.53 | cum | 256.85 | ₹3,732.03 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 6.2 | Cum | 4,826.5 | ₹29,924.3 |
| 3 | P/L in position Cement conc. 1:1.5:3 mix for RCC Work using 20 mm N/Size Agg. For Column/Beams/Slab excluding the cost of centring & shuttering all work upto plinth level. | 9.5 | Cum | 7,788.4 | ₹73,989.8 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 20.58 | Cum | 9,395.7 | ₹1,93,363.51 |
| 5 | Steel reinforcement for RCC work including straightening,cutting, bending and placeing in all position with complete binding. | 3,220 | Kg | 123.2 | ₹3,96,704 |
| 6 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. | 9.62 | cum | 5,733.6 | ₹55,157.23 |
| 7 | Foundtion & Plinth | 67.66 | sqm | 286.35 | ₹19,374.44 |
| 8 | Columns, pillars, piers, abutments, posts and struts. | 27.88 | sqm | 742.55 | ₹20,702.29 |
| 9 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 33.46 | sqm | 577.55 | ₹19,324.82 |
| 10 | SLAB | 89.78 | sqm | 718.2 | ₹64,480 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1094120.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .