Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.7 LAccepted-Finance | ₹27.7 L | 1 | Accepted-Finance lowest bid rate |
| 2 | 2₹28.5 LRejected-Finance A 25 NEW COLONY KALAGARH DIST PAURI GARHWAL | ₹28.5 L | 2 | Rejected-Finance higher bid rate |
| 3 | 3₹29.0 LRejected-Finance 1 28 SHOP NO 116 1 28 U G F TILAK NAGAR TILAK NAGAR WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | ₹29.0 L | 3 | Rejected-Finance higher bid rate |
| Sl No | Description | Qty | Unit | pawan kumar L2 | swastik traders L3 | M/S W M ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Installing new Plummer Block, Gun metal Bush in place of missing one by new Bolts and other allied work including all cost of material , labour and T&P etc. for proper completion of work per at Cross Regulator SSFC 229.6 km, Raebareli.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 4 | Job | 42,310 ₹1,69,240 | 42,980 ₹1,71,920 | 41,207 ₹1,64,828 Lowest |
| 2.00 | Fencing of Walkway by GI Chain Link Mesh and with MS Door for protection of mechanical items and safety of people on the superstructure of dam with providing GI Chain Link Jali, Angle support, welding rod etc and including all cost of material, labour and T&P etc. for proper completion of work at Cross Regulator of SSFC at 229.6 km at Raebareli.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 1 | Job | 6,72,045 ₹6,72,045 | 6,79,045 ₹6,79,045 | 6,51,848 ₹6,51,848 Lowest |
| 3.00 | Replacement of worm wheel, Coupling and Bearing overhauling of Redicon unit with replacing gear oil, damaged packing and seal cover of Redicon unit by new gear oil, packing and seal cover including cost of all material, and other allied work, labour, T&P etc required for proper completion of work at Cross Regulator of SSFC at 229.6 km at Raebareli..The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 2 | Job | 1,09,980 ₹2,19,960 | 1,11,020 ₹2,22,040 | 1,06,631 ₹2,13,262 Lowest |
| 4.00 | Replacement of worm wheel, Coupling and Bearing overhauling of Redicon unit with replacing gear oil, damaged packing and seal cover of Redicon unit by new gear oil, packing and seal cover including cost of all material, and other allied work, labour, T&P etc. required for proper completion of work at Sai Escape SSFC 229.6 km, Raebareli. The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 2 | Job | 1,09,995 ₹2,19,990 | 1,10,910 ₹2,21,820 | 1,06,293 ₹2,12,586 Lowest |
| 5.00 | Fencing of Walkway by GI Chain Link Mesh and with MS Door for protection of mechanical items and safety of people on the superstructure of dam with providing GI Chain Link Jali, Angle support, welding rod etc and including all cost of material, labour and T&P etc. for proper completion of work at Sai Escape,Raibareli.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 1 | Job | 5,53,032 ₹5,53,032 | 5,59,892 ₹5,59,892 | 5,38,038 ₹5,38,038 Lowest |
| 6.00 | Installing new Plummer Block, Gun metal Bush in place of missing one by new Bolts and other allied work including all cost of material , labour and T&P etc. for proper completion of work per job at Sai Escape regulator at SSFC 229.6 km.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 2 | Job | 42,230 ₹84,460 | 42,985 ₹85,970 | 41,120 ₹82,240 Lowest |
| 7.00 | Repairing of M.S. chequered plates by cutting damaged plate, welding after cleaning, scraping, cutting of old welded material from broken joints and providing plain surface for making decking platform including cost of all material, labour, T&P etc. required for proper completion of work at SSFC 229.6 and Sai Escape. The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 100 | SQ.M | 9,315 ₹9,31,500 | 9,560 ₹9,56,000 | 9,113 ₹9,11,300 Lowest |
Tender Value
Refer Docs
EMD Value
₹58,600
Closing Date
3 Jun 2026, 10:00 amClosed
Executive Engineer
Office of Executive Engineer, Barrage Mechanical Maintenance Division, Kanpur, Irrigation Department U.P., 67-A, Cantt, Kanpur-208004
Installing new Plummer Block,Fencing of Walkway,overhauling of Redicon unit,Repairing of M.S. chequered plates on Sai Escape and Cross Regulator 229.6 km, SSFC Raebareli.
2026_UPIDM_1153165_1
26/EE/BMMDK/2026-27 (LOT-1)
Open Tender
Miscellaneous Works
Fixed-rate
120 days
Sai Escape and Cross Regulator SSFC Raebareli.
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹58,600
17 Aug 2026
25 May 2026
3 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installing new Plummer Block, Gun metal Bush in place of missing one by new Bolts and other allied work including all cost of material , labour and T&P etc. for proper completion of work per at Cross Regulator SSFC 229.6 km, Raebareli.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 4 | Job | - | - |
| 2 | Fencing of Walkway by GI Chain Link Mesh and with MS Door for protection of mechanical items and safety of people on the superstructure of dam with providing GI Chain Link Jali, Angle support, welding rod etc and including all cost of material, labour and T&P etc. for proper completion of work at Cross Regulator of SSFC at 229.6 km at Raebareli.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 1 | Job | - | - |
| 3 | Replacement of worm wheel, Coupling and Bearing overhauling of Redicon unit with replacing gear oil, damaged packing and seal cover of Redicon unit by new gear oil, packing and seal cover including cost of all material, and other allied work, labour, T&P etc required for proper completion of work at Cross Regulator of SSFC at 229.6 km at Raebareli..The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 2 | Job | - | - |
| 4 | Replacement of worm wheel, Coupling and Bearing overhauling of Redicon unit with replacing gear oil, damaged packing and seal cover of Redicon unit by new gear oil, packing and seal cover including cost of all material, and other allied work, labour, T&P etc. required for proper completion of work at Sai Escape SSFC 229.6 km, Raebareli. The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 2 | Job | - | - |
| 5 | Fencing of Walkway by GI Chain Link Mesh and with MS Door for protection of mechanical items and safety of people on the superstructure of dam with providing GI Chain Link Jali, Angle support, welding rod etc and including all cost of material, labour and T&P etc. for proper completion of work at Sai Escape,Raibareli.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 1 | Job | - | - |
| 6 | Installing new Plummer Block, Gun metal Bush in place of missing one by new Bolts and other allied work including all cost of material , labour and T&P etc. for proper completion of work per job at Sai Escape regulator at SSFC 229.6 km.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 2 | Job | - | - |
| 7 | Repairing of M.S. chequered plates by cutting damaged plate, welding after cleaning, scraping, cutting of old welded material from broken joints and providing plain surface for making decking platform including cost of all material, labour, T&P etc. required for proper completion of work at SSFC 229.6 and Sai Escape. The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 100 | SQ.M | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
TD26Lot-1.pdf
Tender Documents • 1.19 MB
BOQ_2160283.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].