Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -1.01% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹4,366.19 (2.27%)Admitted-Finance | +1.24% | ₹2.0 L+₹4,366.19 (2.27%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹4,537.19 (2.36%)Admitted-Finance | +1.32% | ₹2.0 L+₹4,537.19 (2.36%) | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
13 Aug 2026, 6:00 pmClosed
Executive Engineer, REW, Jammu
Office of the Executive Engineer, REW Jammu
Construction of P Work nho Ramesh Chander Khokhra Kanah WNo 3 (1.0) Platform of Pang Peer Surgla Kanah WNo. 3 (1.0) Pyt Dhanna Jallara Block Chowki Choura under district capex PRI for the year 2026-27
2026_RDPR_318661_4
e-NIT No. 333 REWJ of 2026-27 dated 30-07-2026
Open Tender
Civil Works
Percentage
Executive Engieer, REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,880
10 Sept 2026
30 Jul 2026
14 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 15.2 | Cum | 479.3 | ₹7,285.36 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 80% | 25.4 | Cum | 5,733.6 | ₹1,45,633.44 |
| 4 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 30.45 | cum | 276.6 | ₹8,422.47 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 74 | sqm | 286.35 | ₹21,189.9 |
| 6 | Carriage of Sand and Bajri for average distance 20 km Km by M.T | 21.42 | Cum | 409.94 | ₹8,780.91 |
| 7 | Add Provission for Citizen information Board including painting writing etc. all complet job | 1 | no | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1051646.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .