Pre-bid Tie up of HEAVY WATER VAPOUR RECOVERY PLANT for 4X700 MWe ASHVINI MAHI BANSWARA UNIT 1-4 (NIMEP) project as per tender documents
2026_BHEL_65965_1
77/26/6168/AMI
Open Tender
Miscellaneous Goods
Lump-sum
975 days
Banswara
As per tender documents
4 documents required · 4 mandatory
₹0
₹40 L
Yes
9 Oct 2026
9 Oct 2026
19 Oct 2026
9 Oct 2026
19 Oct 2026
9 Oct 2026
Total lump sum firm price for Supply part, Services part, Mandatory spares and Engineering charges for Heavy Water Vapour Recovery Plant comprising of design (i.e. Preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site, supervision for erection & commissioning, trial run at site and carrying out Performance guarantee / Functional / Demonstration tests at site (as applicable), training of customer/client O&M staff at site and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order.
MAJOR BREAK-UP OF PRICES GIVEN IN 1.0 ABOVE.
Total lump sum firm price for Supply part for Heavy Water Vapour Recovery Plant comprising of manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order. (Break-up as per Annexure-I)
Total lumpsum firm prices for Services part for Heavy Water Vapour Recovery Plant comprising of Supervision of assembly, Erection & Commissioning, trial run at site and carrying out Performance guarantee/ Functional / Demonstration tests at site (as applicable), training of customer/client O&M staff at site and handover in flawless condition of the package to the end customer complete with all accessories, for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order. (Break-up as per Annexure-II)
Total lumpsum firm price for Mandatory Spares for Heavy Water Vapour Recovery Plant comprising of manufacture, fabrication, assembly, inspection / testing (as applicable) at vendor's & sub-vendor’s works, painting, forwarding, proper packing, shipment, delivery at site & guarantee as per tender technical specification above, amendment & agreements till placement of order. (Price break up of mandatory spares is to be furnished as per Annexure- III)
Total lumpsum firm price for Engineering Charges for Heavy Water Vapour Recovery Plant comprising of design (i.e Preparation & submission of drawings/documents including " AS-BUILT" drawings and O&M Manuals and engineering as per tender technical specification above, amendments & agreements till placement of order for MBRAPP- 1 & 2.
Total lumpsum firm price for Engineering Charges for Heavy Water Vapour Recovery Plant comprising of design (i.e Preparation & submission of drawings/documents including " AS-BUILT" drawings and O&M Manuals and engineering as per tender technical specification above, amendments & agreements till placement of order for MBRAPP- 3 & 4.
Name & Tag Nos.
Equipment Type Location
Equipment Type Location
Equipment Type Location
Equipment Type Location
Dryer Plant (7312-DR-1)
7312-HR-1A, 1B, 2A, 2B
VALVES
VALVES (Applicable for dryers of all 4 units,MBRAPP-1 , MBRAPP-2, MBRAPP-3, MBRAPP-4)
VALVES (Applicable for dryers of all 4 units,MBRAPP-1 , MBRAPP-2, MBRAPP-3, MBRAPP-4)
VALVES (Applicable for dryers of all 4 units,MBRAPP-1 , MBRAPP-2, MBRAPP-3, MBRAPP-4)
VALVES (Applicable for dryers of all 4 units,MBRAPP-1 , MBRAPP-2, MBRAPP-3, MBRAPP-4)
Dampers with counter flanges , nut bolts gaskets,painting etc.
7312-DM(AO-I)-43 7312-DM(AO-I)-44 7312-DM(AO-I)-48 7312-DM(AO-I)-49
7312-DM(AO-I)-42 7312-DM(AO-I)-45 7312-DM(AO-I)-47 7312-DM(AO-I)-50
7312-DM(AO-I)-46
7312-DM(AO-I)-51 7312-DM(AO-I)-52
Ducting (Refer Note 4)
Supports
Molecular Seive
Alumina Balls
Piping (Refer Note 4)
Hot Thermal Insulation
Cold Thermal Insulation
All other items , not mentioned above and in specifictaion but required to complete the dryer plant (Such as fittings for mounting Instrumentation etc., but not limited to this)
Dryer Plant (7312-DR-2)
7312-HR-3A, 3B, 4A, 4B
Dampers with counter flanges , nut bolts gaskets,Painting etc.
7312-DM(AO-I)-73 7312-DM(AO-I)-74 7312-DM(AO-I)-77 7312-DM(AO-I)-78
7312-DM(AO-I)-72 7312-DM(AO-I)-75 7312-DM(AO-I)-76 7312-DM(AO-I)-79
7312-DM(AO-I)-71
7312-DM(AO-I)-80 7312-DM(AO-I)-81
Ducting (Refer Note 4)
Supports
Molecular Seive
Alumina Balls
Piping (Refer Note 4)
Hot Thermal Insulation
Cold Thermal Insulation
All other items , not mentioned above and in specifictaion but required to complete the dryer plant (Such as fittings for mounting Instrumentation etc., but not limited to this)
Dryer Plant (7312-DR-3)
7312-HR-5A, 5B, 6A, 6B
Dampers with counter flanges , nut bolts gaskets,painting etc.
7312-DM(AO-I)-103 7312-DM(AO-I)-104 7312-DM(AO-I)-107 7312-DM(AO-I)-108
7312-DM(AO-I)-102 7312-DM(AO-I)-105 7312-DM(AO-I)-106 7312-DM(AO-I)-109
7312-DM(AO-I)-101
7312-DM(AO-I)-110 7312-DM(AO-I)-111
Ducting (Refer Note 4)
Supports
Molecular Seive
Alumina Balls
Piping (Refer Note 4)
Hot Thermal Insulation
Cold Thermal Insulation
All other items , not mentioned above and in specifictaion but required to complete the dryer plant (Such as fittings for mounting Instrumentation etc., but not limited to this)
Dryer Plant (7312-DR-4)
Dampers with counter flanges , nut bolts gaskets, painting etc.
7312-DM(M-I)-159 7312-DM(M-I)-160
7312-DM(AO-I)-162 7312-DM(AO-I)-163 7312-DM(AO-I)-164 7312-DM(AO-I)-165 7312-DM(AO-I)-166 7312-DM(AO-I)-167 7312-DM(AO-I)-168 7312-DM(AO-I)-169
7312-DM(AO-I)-170 7312-DM(AO-I)-171
7312-DM(AO-I)-178 7312-DM(AO-I)-179
Ducting (Refer Note 4)
Supports
Molecular Seive
Alumina Balls
Piping (Refer Note 4)
Hot Thermal Insulation
Cold Thermal Insulation
All other items , not mentioned above and in specifictaion but required to complete the dryer plant (Such as fittings for mounting Instrumentation etc., but not limited to this)
Dryer Plant (7314-DR-1)
Moisture separator including supports as per data sheet
Dampers with counter flanges , nut bolts gaskets,painting etc.
7314-DM(AO-I)-205 7314-DM(AO-I)-206 7314-DM(AO-I)-207 7314-DM(AO-I)-208 7314-DM(AO-I)-209 7314-DM(AO-I)-210 7314-DM(AO-I)-211 7314-DM(AO-I)-212
7314-DM(AO-I)-220 7314-DM(AO-I)-221
7314-DM(AO-I)-213 7314-DM(AO-I)-214
Ducting (Refer Note 4)
Supports
Molecular Seive
Alumina Balls
Piping (Refer Note 4)
Hot Thermal Insulation
Cold Thermal Insulation
All other items , not mentioned above and in specifictaion but required to complete the dryer plant (Such as fittings for mounting Instrumentation etc., but not limited to this)
Dryer Plant (7314-DR-2)
Moisture separator including supports as per data sheet
Dampers with counter flanges , nut bolts gaskets,painting etc.
7314-DM(AO-I)-233 7314-DM(AO-I)-235 7314-DM(AO-I)-239 7314-DM(AO-I)-241
7314-DM(AO-I)-232 7314-DM(AO-I)-238
7314-DM(AO-I)-234 7314-DM(AO-I)-240
7314-DM(AO-I)-242 7314-DM(AO-I)-243
7314-DM(AO-I)-6001
Ducting (Refer Note 4)
Supports
Molecular Seive
Alumina Balls
Piping (Refer Note 4)
Hot Thermal Insulation
Cold Thermal Insulation
All other items , not mentioned above and in specifictaion but required to complete the dryer plant (Such as fittings for mounting Instrumentation etc., but not limited to this)
INR - Indian Rupees.
It is mandatory to quote in all the fields/price components. Wherever a particular field/price component is not applicable, it should be quoted as ZERO (0) in Numeric. However, the bidder is required to supply/perform the item/activity at free of cost if all the fields/price components are quoted as ZERO (0) against any Sl. No
The price of the equipment / items shall also include the price of Special Tools and Tackles. The requirement of Special Tools and Tackles is to meet the erection, commissioning and subsequent maintenance of all equipment in the scope of the tender. Accordingly, it is required to include the price of Special Tools and Tackles in the corresponding equipment / items price and supply the same.
Vendor to consider the cost of all accessories as mentioned above while quoting.
The Bill of Quantity as per Purchaser’s detailed engineering, issued along with the Tender is only tentative and the Contractor may proceed with procurement of 75% of such tendered BOQ. Any subsequent procurement would be done by the Contractor only after getting approval of the BOQ prepared by the Contractor based on the drawings issued for construction by the Purchaser. However, the Contractor shall bear the responsibility of correctness of the BOQ arrived at by him based on detailed engineering drawings issued by the Purchaser.
Unless otherwise separately identified in the price schedule of respective module/sub-module, charges of all Special Type Tests, Seismic Qualification/ Testing as per the technical specification / Data Sheets/Drawings for individual items shall also be included in the quoted price of the items. Testing/qualification charges shall be paid extra only if the same is separately identified in the price schedule.
Drawings such as P&IDs and General arrangement drawings, support schedhule and support draings etc has be referred to estimate the approxiemate quantity under the LOT.
P&ID referred above will be given to the successful bidder. P&ID of GHAVP project (having same document number as of MBRAPP-1&2 but starting with GHAVP) are attached for bidding purpose.
4X700 MWe ASHVINI MAHI BANSIWARA NUCLEAR ISLAND MEGA EPC
HEAVY WATER VAPOUR RECOVERY PLANT
PE-TS-551-580-002-A001
DESCRIPTION
Total lump sum prices for visits (should include travel expenses to/ fro site, visa/ insurance (if applicable), intermediary stay) for Supervision of assembly, erection and commissioning for the total scope defined as per BHEL NIT & tender technical specification, amendment & agreements till placement of order.
Total lump sum prices for Supervision of assembly, erection and commissioning ( in days) for the total scope defined as per BHEL NIT & tender technical specification, amendment & agreements till placement of order.
Total Lump sump price including site visit charges, all transportation charges, boarding, lodging & other related expenses for trial run at site and carrying out Performance guarantee/ Functional / Demonstration tests at site (as applicable) and handover in flawless condition of the package to the end customer complete with all accessories, for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order.
Total Lump sump price including site visit charges, all transportation charges, boarding, lodging & other related expenses for training of customer/client O&M staff at site for the total scope defined as per BHEL NIT & tender technical specification, amendment & agreements till placement of order.
TOTAL OF SERVICE PORTION (1.1. to 1.4)
DESCRIPTION
Fan and motor Bearing, sets
Impeller Assembly
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets
Vibration isolation pad, sets
Fan and motor Bearings, sets
Impeller Assembly
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets
Vibration isolation pad, sets
Fan and motor Bearings, sets
Impeller Assembly
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets
Vibration isolation pad, sets
Fan and motor Bearing, sets
Impeller
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets
Vibration isolation pad, sets
Fan and motor Bearings, sets
Impeller Assembly
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets ,sets
Vibration isolation pad, sets
Fan and motor Bearings, sets
Impeller Assembly
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets
Vibration isolation pad, sets
Fan and motor Bearing, sets
Impeller
Mechanical Seal Assembly for Shaft
Fan Shaft
Couplings,sets
Drive motor
Gasket and Elastomers,sets
Vibration isolation pad, sets
Molecular Seive for Dual fixed bed dryers
Alumina Balls Dual fixed bed dryers
Moisture Separator
Moisture Separator
Moisture Separator
Thermocouple
MANUAL, FORGED CARBON STEEL GATE VALVES
INR - Indian Rupees.
It is mandatory to quote in all the fields/price components. Wherever a particular field/price component is not applicable, it should be quoted as ZERO (0) in Numeric. However, the bidder is required to supply/perform the item/activity at free of cost if all the fields/price components are quoted as ZERO (0) against any Sl. No
The price of the equipment / items shall also include the price of Special Tools and Tackles. The requirement of Special Tools and Tackles is to meet the erection, commissioning and subsequent maintenance of all equipment in the scope of the tender. Accordingly, it is required to include the price of Special Tools and Tackles in the corresponding equipment / items price and supply the same.
Wherever set is mentioned, one set of the spares of that item shall be for complete replacement of that particular item for one equipment.
Any fraction of a item shall mean the next higher integer.
Wherever quantity has been specified as percentage (%), the quantity of mandatory spares to be provided by contractor shall be the specified percentage (%) of the total population of the plant. In case the quantity so calculated happens to be fraction, the same shall be rounded off to next higher whole number.
Wherever the quantities have been indicated for each type, size, thickness, material, radius, range etc., these shall cover all the items supplied and installed and the breakup for these shall be furnished in the bid.
In case spares indicated in the list are not applicable to the particular design offered by the bidder, the bidder should offer spares applicable to offered design with quantities generally in line with the approach followed in the above list.
4X700 MWe ASHVINI MAHI BANSWARA UNIT 1-4 (NIMEP)
DAMPERS FOR NUCLEAR VENTILATION SYSTEM
HEAVY WATER VAPOUR RECOVERY PLANT
77/26/6168/AMI dated 09.10.2026
Volume/Section
TECHNICAL DEVIATION
COMMERCIAL DEVIATION
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.73 MB
Tendernotice_2.pdf
PDF • 2.92 MB
Tendernotice_3.pdf
PDF • 0.49 MB
Tendernotice_4.pdf
PDF • 6.05 MB
PriceFormat.xls
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .