Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹37.8 L+₹46,572.50 (1.25%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹39.9 L+₹2.6 L (6.95%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹40.5 L+₹3.2 L (8.58%)Rejected-Finance | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹42.8 L+₹5.5 L (14.9%)Rejected-Finance | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | GANGA CONSTRUCTION L2 | M/S MAMTA CONSTRUCTIONS L3 | krishna Associate L6 | M/s K Prashad and Sons L4 | BHARDWAJ CONSTRUCTIONS L5 | VASUNDHARA AND COMPANY L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facings,dressed stone work and precast concrete articles complete all as specified. | 285 | Cum | 200 ₹57,000 | 80 ₹22,800 Lowest | 200 ₹57,000 | 100 ₹28,500 | 200 ₹57,000 | 100 ₹28,500 |
| 2.00 | M&L Brick work with sub class 'B' old size bricks straight or curved on plan exceeding 6 m mean radius built in cement mortar 1:6 complete all as specified. | 331 | Cum | 2,700 ₹8,93,700 Lowest | 3,500 ₹11,58,500 | 3,800 ₹12,57,800 | 3,500 ₹11,58,500 | 3,900 ₹12,90,900 | 4,800 ₹15,88,800 |
| 3.00 | All as above Item No 02 but except bricks complete all as specified. | 5 | Cum | 1,200 ₹6,000 Lowest | 1,240 ₹6,200 | 2,000 ₹10,000 | 3,500 ₹17,500 | 2,200 ₹11,000 | 5,000 ₹25,000 |
| 4.00 | Excavation in trenches, not exceeding 1.50 meter wide and not exceeding 1.50 meter in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 square meter on plan and not exceeding 1.50 meter in depth and getting out in soft/ loose soil complete all as specified. | 50 | Cum | 90 ₹4,500 Lowest | 150 ₹7,500 | 150 ₹7,500 | 200 ₹10,000 | 140 ₹7,000 | 210 ₹10,500 |
| 5.00 | Material and labour for Cement concrete in foundations, filling and mass concrete type D2 1:4:8 using 40 mm graded stone aggregate complete all as specified. | 9 | Cum. | 2,700 ₹24,300 | 1,800 ₹16,200 Lowest | 3,000 ₹27,000 | 2,500 ₹22,500 | 3,000 ₹27,000 | 4,000 ₹36,000 |
| 6.00 | Taking down cement plaster of any description including racking out joints,hacking for key, scrubbing down with water complete all as specified. | 1,260 | Sqm | 10 ₹12,600 | 10 ₹12,600 | 10 ₹12,600 | 15 ₹18,900 | 25 ₹31,500 | 5 ₹6,300 Lowest |
| 7.00 | M&L for Rendering 15 mm thick in CM (1:4) on stone masonry surfaces or surface other than fair face of brick-work or on one side of lathing complete all as specified. | 1,835 | Sqm | 135 ₹2,47,725 Lowest | 152 ₹2,78,920 | 180 ₹3,30,300 | 170 ₹3,11,950 | 180 ₹3,30,300 | 210 ₹3,85,350 |
| 8.00 | All as above item no 7 but in CM (1:4) on fair faces finished even and smooth without using extra cement complete all as specified. | 1,875 | Sqm | 130 ₹2,43,750 Lowest | 147 ₹2,75,625 | 180 ₹3,37,500 | 170 ₹3,18,750 | 185 ₹3,46,875 | 210 ₹3,93,750 |
| 9.00 | M&L Preparation of new plastered surfaces of walls and applying two coats of cement base paint over a coat of primer with hand roller complete all as specified. | 3,710 | Sqm | 36 ₹1,33,560 | 20 ₹74,200 | 30 ₹1,11,300 | 30 ₹1,11,300 | 32 ₹1,18,720 | 10 ₹37,100 Lowest |
| 10.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified. | 8.55 | Qtl | 300 ₹2,565 | 150 ₹1,282.5 | 100 ₹855 | 200 ₹1,710 | 700 ₹5,985 | 10 ₹85.5 Lowest |
Tender Value
₹49.8 L
EMD Value
₹99,640
Closing Date
18 Oct 2025, 6:00 pmClosed
GE Bharatpur
GE Bharatpur
PROVN OF KOTA STONE FLOORING AND ROOFING SHEET IN BLDG NO P 18 AND SPL REPAIR OF BOUNDRY WALL OF BUILDING NO 32 AT SEWAR FORT UNDER GE BHARATPUR
2025_MES_731914_1
8531/E8
Open Tender
Civil Works
Item Rate
180 days
GE Bharatpur
AS PER NIT
8 documents required · 8 mandatory
₹500
Yes
GE Bharatpur
₹99,640
Yes
18 Nov 2025
20 Sept 2025
20 Oct 2025
20 Sept 2025
18 Oct 2025
4 Oct 2025
22 Sept 2025 - 2 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
tender8531.pdf
Tender Documents • 1.93 MB
BOQ_819522.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .