| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.0 LAccepted-Finance | ₹6.0 L | L-1 | Accepted-Finance Accept |
| 2 | L-2₹6.6 LRejected-Finance VIDYUT BHAWAN HPSEBL SHIMLA 171004 | SHIMLA | HIMACHAL PRADESH | 171004 | ₹6.6 L | L-2 | Rejected-Finance Reject |
Tender Value
₹6.4 L
EMD Value
₹12,800
Closing Date
24 Feb 2026, 5:00 pmClosed
Executive Engineer
Bharwain Division HPPWD
Restoration of rain damages on link road Karluhi to Mandholi km 000 to 5500 SH Repair of Pot holes in km 0700 to 0800 VShape drain at Various RDs Under PDNA2023
2026_PWD_128632_1
RRD Karluhi to Mandholi Job No 12 pDNA
Open Tender
Civil Works
90 days
Bharwain
As per Tender Documents
2 documents required · 2 mandatory
₹350
₹12,800
12 Mar 2026
16 Feb 2026
25 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm) to wet mix macadam (WMM)specification including premixing the material with water at OMC in for all leads and lifts, laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller of 8 (eight) to 10 (ten) tonne capacity to achievethe desired density, complete as per specifications and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toil tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and applying tack coat using bitumen emulsion @ 0.40 kg/sqm ( at the rate of zero point forty kilogram per Sequare metre ) conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom and as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Repair to pot holes and removal of loose mateial, trimming of sides, cleaning of surface by providing tack coat with bitumen VG-10 @ 3 kg per ten square metre , 20mm thick premix carpet with 0.27 cubic metre of stone aggregate mixed with bitumen VG-10 @ 14.6 kg (fourteen point six kilogram) per ten square metre and seal coat type B with 0.06 cubic metre fine aggregate mixed with bitumen VG-10 @ 6.8 kg (six point eight kilogram) per ten square metre of road surface as per specification Clause 1904.2 including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Excavation in earth work in foundation and trenches etcetera in all kind and classification of soil such as pick work, jumper work, pick jumper work, blasting work and hard blasting work and saturated soil any other mixed verity of soil in dry or saturated condition upto any depth and lift upto any height including chiseling/wedging out rocks where blasting prohibited dewatering pumping or bailing out water where required and/ removal of slush seprately as directed which may arise during the execution including stacking the serviceable and unserviceable material and then returning stacked soil in any thickness of layers when required into plinth side of foundation etcetera consolidating each deposited layers by ramming and watering then disposing of all surplus unserviceable excavated earth as specified dumping place as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt.
Providing and laying in position cement concrete 1:3:6 (one cement : three sand: six graded/crushed stone aggregate 20 mm (twenty millimeter) nominal size mechanically mixed and curing complete including cost of centring and shuttering in Retaining wall / Breast wall as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
Tendernotice_2.pdf
PDF • 0.35 MB
BOQ_190092.xls
BOQ • 0.28 MB
KarluhitoMandholiJobno12.pdf
Tender Documents • 2.96 MB
Download all tender documents and submit your bid