Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -22.71% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -16.00% | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -15.00% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-not bhoond block |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
17 Feb 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. of lane from main road to raja mandlik
2026_RDPR_302833_11
e-NIT No.348/REW/K of 2025-26 Dated 11/02/2026 2nd call
Open Tender
Civil Works
30 days
Bhoond
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,920
23 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA
Name of Work;- Constt . Of lane from main road to raja mandlik , pyt sandhar , Block Bhoond District Kathua under Development Scheme (CDS) for the year 2025-26 ESTT AMOUNT 1.96 LACS
Contract NO:- MLACDF 2025-26
Name of the Bidder/ Bidding Firm / Company :
S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
all kinds of soil 80 % cum 1000 Excess(+) Full Conversion INR
Hard Rock 5 % cum 1000 Excess(+) Full Conversion INR
ordinary rock 15 % cum 1000 Excess(+) Full Conversion INR
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil 6.345 cum 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) cum 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) cum 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cum 1000 Excess(+) Full Conversion INR
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade ISI Marked,IS-15658 made by block making machine with strong vibratory compaction and of approved size and design / shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. sqm 1000 Excess(+) Full Conversion INR
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns sqm 1000 Excess(+) Full Conversion INR
walls sqm 1000 Excess(+) Full Conversion INR
Providing and Laying of River Bed Material (R.B.M)/ Nallah bed Material (N.B.M) including spreading, consolidation complete in all respect including Loading, unloading and carriage complete ( to be quoted by Contractor ) 3.6 cum 1000 Excess(+) Full Conversion INR
Carriage of Sand for 90 Km by MT cum 1000 Excess(+) Full Conversion INR
Carriage of Agg. Below 40 mm for 90 Km by MT cum 1000 Excess(+) Full Conversion INR
Carriage of Agg. Above 40mm for 90 Km by MT cum 1000 Excess(+) Full Conversion INR
inauguration plate size 2*2 No. 2000 1000 Excess(+) Full Conversion INR
Total in Figures Excess(+) Full Conversion INR
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.00 MB
BOQ_982947.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid