Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC ERAL | ₹23.3 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹23.4 L+₹12,461.79 (0.54%)Rejected-AOC 81 1 1 MUTHUKRISHNAPURAM 6TH STREET THOOTHUKUDI 628 002 | THOOTHUKUDI | THOOTHUKUDI | TAMIL NADU | 628002 | ₹23.4 L+₹12,461.79 (0.54%) | L2 | Rejected-AOC Qualified |
| 3 | L3₹25.0 L+₹1.7 L (7.45%)Rejected-AOC NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | ₹25.0 L+₹1.7 L (7.45%) | L3 | Rejected-AOC Qualified |
| Sl No | Description | Qty | Unit | SELVAN AND CO L2 | ATHIVEL L1 | Petchimuthu L3 |
|---|---|---|---|---|---|---|
| 1.00Name of Work: Construction of Multi Purpose Community Hall at Aladiyur Village in Umarikadu Panchayat in Srivaikundam Panchayat Union in Thoothukudi District under the scheme of Natural Calamities 2025-26 | ||||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard gravelly soil for foundation etc. complete | 75.3 | cum | 251 ₹18,900.3 | 247.95 ₹18,670.88 Lowest | 266.42 ₹20,061.26 |
| 3.00 | Collecation and supply of M.Sand filling into the foundation and basement including cost and conveyence of sand labour charges | 10.42 | cum | 1,725 ₹17,974.5 Lowest | 1,727.48 ₹18,000.39 | 1,856.13 ₹19,340.85 |
| 4.00 | Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed. | 12.88 | cum | 5,150 ₹66,332 Lowest | 5,174.49 ₹66,647.47 | 5,559.83 ₹71,610.58 |
| 5.00 | Supplying and erecting centeringfor sides and soffits of concrete works including cost and conveyence of materials and labour charges etc complete Below GL | 104.11 | SQM | 520 ₹54,137.2 | 514.65 ₹53,580.21 Lowest | 552.98 ₹57,570.23 |
| 6.00 | Supplying and erecting centeringfor sides and soffits of concrete works including cost and conveyence of materials and labour charges etc complete Above GL | 200.79 | SQM | 1,030 ₹2,06,813.7 | 1,029.3 ₹2,06,673.15 Lowest | 1,105.95 ₹2,22,063.7 |
| 7.00 | Supply and fabrication of steel including costand conveyence of steel and labour charges for cutting bending and placing in postiton etc | 4.65 | MT | 86,100 ₹4,00,365 Lowest | 86,485.58 ₹4,02,157.96 | 92,926 ₹4,32,105.9 |
| 8.00 | RCC 1:1.5:3 using 20mm HBG metal including cost and conveyance of materials and labour charges etc. complete | 41.38 | cum | 8,690 ₹3,59,592.2 Lowest | 8,710.14 ₹3,60,425.73 | 9,358.77 ₹3,87,265.95 |
| 9.00 | Brick Work in C.M 1:5 mix country bricks including cost and conveyence of materials and labour charges etc | 30.99 | cum | 5,710 ₹1,76,952.9 Lowest | 5,734.4 ₹1,77,709.19 | 6,161.43 ₹1,90,942.85 |
| 10.00 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling | 35.75 | cum | 115 ₹4,111.25 | 113.73 ₹4,065.87 Lowest | 122.2 ₹4,368.65 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
13 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(vP)
BLOCK DEVELOPMENT OFFICER (BP) SRIVAIKUNDAM Panchayat Union Office,Srivaikundam Block,Thoothukudi District
Construction of Multi Purpose Community Hall at Aladiyur Village in Umarikadu Panchayat in Srivaikundam Panchayat Union in Thoothukudi District under the scheme of Natural Calamities 2025-26
2026_RDTN_673766_1
Lr.No. m2/412/2026 Dt 09.03.2026
Open Tender
Civil Works
Item Rate
90 days
srivaikundam block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹25,000
6 Aug 2026
12 Mar 2026
13 Mar 2026
12 Mar 2026
13 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Construction of Multi Purpose Community Hall at Aladiyur Village in Umarikadu Panchayat in Srivaikundam Panchayat Union in Thoothukudi District under the scheme of Natural Calamities 2025-26 | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with initial lead and lift in hard gravelly soil for foundation etc. complete | 75.3 | cum | - | - |
| 3 | Collecation and supply of M.Sand filling into the foundation and basement including cost and conveyence of sand labour charges | 10.42 | cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed. | 12.88 | cum | - | - |
| 5 | Supplying and erecting centeringfor sides and soffits of concrete works including cost and conveyence of materials and labour charges etc complete Below GL | 104.11 | SQM | - | - |
| 6 | Supplying and erecting centeringfor sides and soffits of concrete works including cost and conveyence of materials and labour charges etc complete Above GL | 200.79 | SQM | - | - |
| 7 | Supply and fabrication of steel including costand conveyence of steel and labour charges for cutting bending and placing in postiton etc | 4.65 | MT | - | - |
| 8 | RCC 1:1.5:3 using 20mm HBG metal including cost and conveyance of materials and labour charges etc. complete | 41.38 | cum | - | - |
| 9 | Brick Work in C.M 1:5 mix country bricks including cost and conveyence of materials and labour charges etc | 30.99 | cum | - | - |
| 10 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling | 35.75 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_809874.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
TechnicalBid.pdf
Tender Documents • 0.72 MB
BOQ_809874.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .