Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC VILL HARDASPUR MADHE KOTWALI DEHAT DISTT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | ₹23.3 L Quoted ₹19.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.8 LRejected-Finance GOVINDHAM HOTEL SARSOKHI ORAI ORAI JALAUN UTTAR PRADESH 285001 | JALAUN | UTTAR PRADESH | 285001 | ₹19.8 L | L2 | Rejected-Finance L2 |
Tender Value
₹23.3 L
EMD Value
₹48,000
Closing Date
13 Apr 2026, 12:00 pmClosed
EEREDBIJNOR
EEREDBIJNOR
4-Construction work of C.C. road from the graveyard to Khalil s house (near the tower) in village Tukhmapur.
2026_REDUP_1128971_4
50/EE/RED/DATE-05-03-2026
Open Tender
Civil Works - Roads
120 days
EEREDBIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹48,000
Yes
EEREDBIJNOR
7 May 2026
23 Mar 2026
13 Apr 2026
23 Mar 2026
13 Apr 2026
23 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Concretrd with 40 mm. Stone ballast, Coarse sand of 2.25 fm. And cement in proportion of 1:6:12 in foumdation and under floor i/c supply of all materials, labour and T&P etc. SI no 273 aNew | |||||
| 2M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth i/c supply of all materials, labour Taxes and T&P etc. S.I.N. - 305 | |||||
| 3Cement concrete with 20mm gauge approved stone grit approved coarse sand and cement in preportion of 4:2:1 i/c supply of all material, labour Taxes, and T&P etc. Reguired for proper completion of work S.I.No. 279(A). | |||||
| 412 MM thick Plaster with one part of cement and four part of approved corse sand mortar 2.25 fm over brick work i/c supply of all marerial labour taxes T&P etc. Required for proper completion | |||||
| 5Cement concrete with 20mm gauge approved stone grit approved coarse sand and cement in preportion of 3:1.5:1 i/c supply of all material, labour Taxes, and T&P etc. Reguired for proper completion of work S.I.No. New Item 03.Chepter 20 | |||||
| 6R.C.C in 1:1:5:3 Cement ,Coarse sand and 20mm stone grit for slab i\c all As per SI NO 284(A) | |||||
| 7M.S. Iron work in reinforcememt in plain work such as R.C.C /R.B i/c bending binding etc complete i/c supply of all material labour and T&P etc complete. As S.I.n0 504 | |||||
| 87 S/F sign board i/c all comp. at site. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2105902.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid