| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹25.5 L+₹12,977.42 (0.51%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | V Vediyappan L2 | M/s.SK FOUNDATION L1 |
|---|---|---|---|---|---|
| 1.001. Construction of 2m span culvert in Bandikan Eri channel at Muthukurukki H/o Pannapalli Shoolagiri Taluk - Rs.9.67 /- Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 83.13 | Cum | 264.7 ₹22,004.51 | 263.36 ₹21,893.12 Lowest |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.32 | Cum | 5,558.81 ₹46,249.3 | 5,530.56 ₹46,014.26 Lowest |
| 4.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||
| 5.00 | Sides | 188.47 | Sqm | 549.42 ₹1,03,549.19 | 546.62 ₹1,03,021.47 Lowest |
| 6.00 | Deck Bottom | 15 | Sqm | 1,098.83 ₹16,482.45 | 1,093.25 ₹16,398.75 Lowest |
| 7.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 86.32 | Cum | 5,829.75 ₹5,03,224.02 | 5,800.12 ₹5,00,666.36 Lowest |
| 8.00 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 3.54 | Cum | 6,854.38 ₹24,264.51 | 6,819.54 ₹24,141.17 Lowest |
| 9.00 | Cement Concrete 1:1.5:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 4.68 | Cum | 9,293.53 ₹43,493.72 | 9,246.3 ₹43,272.68 Lowest |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.4 | Mt | 92,180 ₹36,872 | 91,711.53 ₹36,684.61 Lowest |
Tender Value
₹25.7 L
EMD Value
₹26,000
Closing Date
30 Dec 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Construction of 2m span culvert and Retaining Wall in Bandikan Eri channel at Muthukurukki in Pannapalli Shoolagiri Taluk Shoolagiri Block Krishnagiri DT_DMFT_TN 04 KRI 277
2025_RDTN_632699_1
RocNo_6360_2025_R4_02_12_2025
Open Tender
Civil Works - Roads
Item Rate
180 days
shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹26,000
DRDA Krishnagiri
21 Feb 2026
16 Dec 2025
30 Dec 2025
16 Dec 2025
30 Dec 2025
16 Dec 2025
22 Dec 2025
Amount
1. Construction of 2m span culvert in Bandikan Eri channel at Muthukurukki H/o Pannapalli Shoolagiri Taluk - Rs.9.67 /- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Sides
Deck Bottom
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Cement Concrete 1:1.5:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Name Board Charges
2. Construction of Retaining wall near Bandikan Eri at Muthukurukki H/o Pannapalli shoolagiri Taluk- Rs.16.00 /- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Supply and Filling of Conveyed Earth with a lead of 5Km for Basement Filling
Providing Weep Holes
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V Vediyappan (BID ID -1543141)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_756922.xls
BOQ • 0.35 MB
TB277.pdf
Tender Documents • 0.47 MB
PB277.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .