Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance | ₹6.1 L | L2 | Admitted-Finance |
| 3 | L3₹10.0 LAdmitted-Finance RZ 151 BLOCK Y NEW ROSHANPURA PAPRAWAT ROAD NAJAFGARH SOUTH WEST DELHI DELHI 110043 | WEST DELHI | DELHI | 110043 | ₹10.0 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical technically not qualified |
| Sl No | Description | Qty | Unit | MODERN CONCEPT CONSTRUCTIONS L3 | K.D GUPTA L1 | MOHD CHAND L2 |
|---|---|---|---|---|---|---|
| 1.001) Finishing walls with textured exterior paint of required shade: | ||||||
| 2.00 | 1.1) New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm | 100 | sqm. | 210 ₹21,000 | 110 ₹11,000 | 110 ₹11,000 |
| 3.00 | 2)Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 100 | sqm. | 75 ₹7,500 | 50 ₹5,000 | 80 ₹8,000 |
| 4.00 | 3) Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 100 | sqm. | 10 ₹1,000 | 10 ₹1,000 | 5 ₹500 |
| 5.004) Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : | ||||||
| 6.00 | 4.1) One or more coats on old work | 824 | sqm. | 80 ₹65,920 | 50 ₹41,200 | 40 ₹32,960 |
| 7.005) Finishing walls with textured exterior paint of required shade: | ||||||
| 8.00 | 5.1) Old work (Two or more coats on existing cement paint surface applied @ 3.28 Itr/10 sqm. | 5,200 | sqm. | 150 ₹7.8 L | 60 ₹3.1 L | 90 ₹4.7 L |
| 9.006) Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. | ||||||
| 10.00 | 6.1) 6.1) With cement mortar 1:4 (1cement: 4 coarse sand) | 100 | sqm. | 450 ₹45,000 | 300 ₹30,000 | 250 ₹25,000 |
Updated dates
Tender Value
₹12.0 L
EMD Value
₹23,913
Closing Date
19 Feb 2026, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer (CD-I), Room No. AD- 117A, Academic Building, IIT Delhi, Hauz Khas, New Delhi-110016
A.R. and M.O. to Buildings in Boys Hostel Maintenance area at IIT Delhi during the year 2025-26
2026_IIT_897256_1
IITD/WORKS (SP-5244)/2026
Open Tender
Civil Works
30 days
IIT Delhi Hauz Khas
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹23,913
26 Feb 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
1) Finishing walls with textured exterior paint of required shade:
1.1) New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm
2)Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
3) Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete
4) Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
4.1) One or more coats on old work
5) Finishing walls with textured exterior paint of required shade:
5.1) Old work (Two or more coats on existing cement paint surface applied @ 3.28 Itr/10 sqm.
6) Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
6.1) 6.1) With cement mortar 1:4 (1cement: 4 coarse sand)
7) Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_943122.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid