Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 CrAccepted-AOC | ₹25.1 Cr | L1 | Accepted-AOC Being lowest and reasonable |
| 2 | L2₹26.8 CrRejected-AOC | ₹26.8 Cr | L2 | Rejected-AOC Being L2 |
| 3 | L3₹31.6 CrRejected-AOC CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹31.6 Cr | L3 | Rejected-AOC Being L3 |
| 4 | L4₹31.9 CrRejected-AOC LINK FIRST NEW AIRPORT ROAD NEAR TATA ENGINEERING GARAGE PO HUMAMA SRINAGAR 190014 J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190014 | ₹31.9 Cr | L4 | Rejected-AOC Being L4 |
| 5 | L5₹43.6 CrRejected-AOC PROP ZISHAN ALI ADARSH NAGAR NEW BUS STAND RAMGARH CANTT RAMGARH | ₹43.6 Cr | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | M/S SHAH CONSTRUCTION L4 | M M SHAWL Engineers and contractors pvt ltd L3 | M/S ABDUL SALAM MIR CONSTR CO PVT. LTD L1 | Jk Engineering Construction Co. L2 | SHAH AND SONS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes given in tender documents. (ii) The Schedule 'A' Part-XII is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col. 5 signifies this fact only. | ||||||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | ||||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 25,49,64,706.15 ₹25.5 Cr | 25,49,00,000 ₹25.5 Cr | 18,52,39,664 ₹18.5 Cr | 21,69,00,000 ₹21.7 Cr | 36,21,55,000 ₹36.2 Cr |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 26,63,280 ₹26.6 L | 25,00,000 ₹25 L | 22,44,968.18 ₹22.4 L | 22,62,000 ₹22.6 L | 31,55,000 ₹31.6 L |
| 2.03 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 64,71,360 ₹64.7 L | 55,00,000 ₹55 L | 52,58,330 ₹52.6 L | 49,13,000 ₹49.1 L | 69,50,000 ₹69.5 L |
| 2.04 | Lump sum price worked out by the contractor for PCC ROAD WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 48,59,820 ₹48.6 L | 40,00,000 ₹40 L | 38,79,704.37 ₹38.8 L | 39,00,000 ₹39 L | 59,65,000 ₹59.6 L |
| 2.05 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 84,47,164 ₹84.5 L | 85,00,000 ₹85 L | 75,12,696.52 ₹75.1 L | 76,33,000 ₹76.3 L | 1,15,45,000 ₹1.2 Cr |
| 2.06 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 74,750 ₹74,750 | 65,000 ₹65,000 | 59,623.44 ₹59,623.44 | 78,000 ₹78,000 | 75,000 ₹75,000 |
| 2.07 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 13,82,700 ₹13.8 L | 12,00,000 ₹12 L | 11,43,882.3 ₹11.4 L | 15,82,000 ₹15.8 L | 15,75,000 ₹15.8 L |
| 2.08 | Lump sum price worked out by the contractor for LIGHTENING PROTECTION WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 8,66,880 ₹8.7 L | 7,00,000 ₹7 L | 7,04,851.42 ₹7.0 L | 8,67,000 ₹8.7 L | 9,65,000 ₹9.7 L |
Tender Value
₹29.1 Cr
EMD Value
₹15 L
Closing Date
4 Aug 2025, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
CONSTRUCTION OF CERTAIN TECH ACCN AND OTHER ALLIED INFRASTRUCTURE AT KHUNDRU UNDER GE 861 EWS
2025_MES_711688_1
800161
Open Tender
Civil Works
700 days
GE 861 EWS
As per tender documents
12 documents required · 12 mandatory
₹3,000
GE 861 EWS
₹15 L
Yes
30 Aug 2025
31 May 2025
6 Aug 2025
31 May 2025
4 Aug 2025
21 Jul 2025
31 May 2025 - 15 Jun 2025
Amount
Note: (i) Please refer Schedule 'A' Notes given in tender documents. (ii) The Schedule 'A' Part-XII is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col. 5 signifies this fact only.
LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS
Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I.
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II.
Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-III.
Lump sum price worked out by the contractor for PCC ROAD WORKS carried forward from Pre-Priced Schedule 'A' Part-IV.
Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-V.
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-VI.
Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-VII.
Lump sum price worked out by the contractor for LIGHTENING PROTECTION WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII.
Lump sum price worked out by the contractor for PROTECTIVE WORKS carried forward from Pre-Priced Schedule 'A' Part-IX.
Lump sum price worked out by the contractor for FIRE BRAKE AREA WORKS carried forward from Pre-Priced Schedule 'A' Part-X.
Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-XI.
MISCELLANEOUS ITEMS OF WORKS (SCHEDULE 'A' PART-XII) (A) INTERNAL ELECTRIFICATION WORKS
Supply and fixing flame proof sheet metal enclosure MCB distributiion box single pole & neutral 240 Volts 8 way suitable for hazardous area laden with gases/vapour of Group II (A) and ii(B) as per IS 2148/1984 encl as per IP-55 degree of protection and as per IS 2147/1962 made out of cast of aluminium alloy LM-06 having earthing neutral terminal and in and including following complete all as specified and directed.:- (i) MCB SPN 240 Volt, 10 kA 'C' Curve 32 Amp-01 No (Incoming) (ii) MCB SP 6 Amp 10 kA 'C' Curve 32 Amp-05 Nos (Outgoing) (iii) MCB SP 16 Amp 10 kA 'C' Curve 32 Amp-01 No (Outgoing) complete all as specified and directed.
(B) LIGHTENING PROTECTION WORKS
(C) EXTERNAL ELECTRIFICATION WORKS
Material and Labour for boring of road by trenchless technology for passing of cable with pipe suitable for passing upto 100 mm bore of pipe complete all as specified and directed. Note:- Pipe shall be measured and paid for separetely.
Supply and fixing of cable jointing kit for 1.1 KV grade cable for outdoor termination heat shrink type joint complete with jointing material and accessories suitable for 4 core XLPE armoured conductor cable of size 25 to 70 Sqmm complete all as specified and directed.
Supply and fixing of cable route indicator made out of 50x50x6mm angle iron, 60mm long embedded in PCC block of suitable size with moulded letter 'LT CABLE' suitable inscribed including PCC 1:3:6 type C-2 (using 40mm graded stone aggregate) block of 150x150x150mm size complete all as specified and directed.
Supply, installing, testing and commissioning, & testing LT distribution panel board, double door, pedastal mounted, size of panel is suitable for accomodate to all MCCBs/MCB and accessories, CPRI approved, IP-54, made out of 3.15 thick CRCA sheet duly powder coated, mounted on angle (65x65x6mm) iron frame of height 450mm from PCC bedding, factory assembled acompartmentalised construction, free standing type including 3 Phases & neutral 400 Amps current carring capacity aluminium bush bar having 100 Amp rating with epoxy insulated coating with colour code and insulated support, cable galleries inter connecting bus bar connection/linkage complete and conforming to IS-8623 of protection as per IS-2147 complete including making connection of cables of incoming and outgoing with thimble/lugs including the accessories, complete and mounting the panel on ground/ floor with PCC1:3:6 bedding upto a height of 30cm above ground level, complete all as specified and directed and comprising as under :-
Supply, installing, testing and commissioning & testing LT distribution panel board, outdoor type, double door, pedastal mountd, size of panel is suitable for accommodate to all MCCBs/MCB and accessories, CPRI approved, IP-54, made out of 3.15mm thick CRCA sheet duly powder coated, mounted on angle (65mmx65mmx6mm) iron frame of height 450mm from PCC bedding, factory assembled compartmentalised construction, free standing type including 3 Phase & neutral 400 Amps current carrying capacity aluminium bush bar 100 amp with epoxy insulated coated with colour code and insulated support, cable galleries inter connecting bus bar connection/linkage complete and conforming to IS-8623 of protection as per IS-2417 complete including making connection of cables of incoming and outgoing with thimble/lugs including the accessories, complete and mounting the panel on ground/ floor with PCC 1:3:6 beddng upto a height of 30cm above ground level, coplete all as specifed and directed and comprising as under :-
(C) DUNNAGE BLOCK WORKS
Supply only FRGP hollow dunnage blocks of size 300mm x 300mm x 200mm and 10mm wall thickness made of fibre reinforced glass plastic with minimum 25% glass content in reinforced members, UV resistant , fire resistant, high load bearing and capable of taking load upto 5 ton complete all as specified and directed.
Jk Engineering Construction Co. (BID ID -3372061)
M M SHAWL Engineers and contractors pvt ltd (BID ID -3373939)
M/S SHAH CONSTRUCTION (BID ID -3373895)
SHAH AND SONS (BID ID -3373560)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid