Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹31.6 L+₹6,195.03 (0.20%)Rejected-Finance WARD NO 25 DARJEELING 734101 WEST BENGAL | DARJEELING | WEST BENGAL | 734101 | L2 | Rejected-Finance High Rate | |
| 3 | L3₹31.7 L+₹13,938.82 (0.44%)Rejected-Finance | L3 | Rejected-Finance High Rate |
Tender Value
₹31.0 L
EMD Value
₹61,950
Closing Date
6 Feb 2026, 5:30 pmClosed
EXECUTIVE ENGINEER, PWD, DARJEELING DIVISION
OFFICE OF THE EXECUTIVE ENGINEER, PUBLIC WORKS DIRECTORATE, DARJEELING DIVISION, 8, Hooker Road, Post Box No. 59, Darjeeling 7 34 101.
Construction of 1st Story of RUSA building of Southfield college, Darjeeling.
2026_WBPWD_990604_1
WBPWD/EE/DJ/eNIT 19 /2025-2026
Open Tender
CIVIL WORKS
Percentage
150 days
DARJEELING
Please Refer Tender Document
4 documents required · 4 mandatory
₹61,950
11 Feb 2026
22 Jan 2026
9 Feb 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required completeEarth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | 18.06 | Cum | 119.27 | ₹2,154.02 |
| 2.01 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | 18.06 | Cum | 606.7 | ₹10,957 |
| 3.01 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River Bazree | 4.7 | Cum | 6,370.8 | ₹29,942.76 |
| 4.01 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade Pakur Variety | 12.34 | Cum | 8,764.91 | ₹1,08,158.99 |
| 5.01 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel SAIL/TATA/RINL | 1.36 | MT | 73,061.88 | ₹99,364.16 |
| 6.01 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (1:3:6) proportion | 25.25 | Cum | 3,964.8 | ₹1,00,111.2 |
| 7.01 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | - | Sqm | 400.8 | - |
| 8.01 | Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor | 1 | Cum | 8,132.4 | ₹8,124.27 |
| 9.01 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 1 | Sqm | 1,052.4 | ₹1,051.35 |
| 10.01 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (d) Sal : Local. | - | Cum | 87,784.8 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
2911ii.pdf
Tender Documents • 0.50 MB
5784_notification.pdf
Additional Documents • 0.61 MB
BOQ_2421755.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .