Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹5.6 L+₹58,127.50 (11.5%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹7.0 L+₹2.0 L (39.3%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹5.1 L
EMD Value
₹6,000
Closing Date
26 May 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
CONSTRUCTION OF 132KV, 33KV BAYS, INSTALLATION OF 132/33KV 40MVA T/F AND PROCUREMENT OF CLAMP and CONNECTORS AT 132KV S/S JALALPUR UNDER ETD, AYODHYA.
2023_UPTCL_799723_2
T.No. 08/ETCS/2023-24
Open Tender
Electrical Works
Item Wise
60 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹708
SE ETC Sultanpur
₹6,000
27 May 2023
20 May 2023
27 May 2023
20 May 2023
26 May 2023
20 May 2023
Amount
Erection of following equipments including shifting of material from store to site:
145KV SF6 Circuit Breaker
36KV VCB
145KV Current Transformer
145KV C.T. Junction Box
36KV Current Transformer
36KV C.T. Junction Box
145KV Motorised Bus Isolator without E/S for SAS
145KV Motorised Tandem Isolator without E/S for SAS
36KV Bus Isolator without E/S for SAS (with Post Insulator)
145KV Post Insulators
120KV Surge Arrester
30KV Surge Arrester
Simplex type Control & Relay Panel as per technical specification for SAS based for 40MVA T/F
Laying of following 1.1KV unarmoured copper control cable:
Termintion of following 1.1KV unarmoured copper control cable:
132KV Bay Control Cable and Optical Fiber Cable termination including cost of cable glands, lugs & ferrules complete and both end as per site and panel requirement.
Erection of Lattice type main and auxiliary structures
Earthing of structures and equipments:
Providing&laying alongwith Earthing of 75mmx10mm MS flat for structures and equipments including cutting,bending,welding,digging pit,painting,filling of land soil into the pit and removal of garbage after completion of work as per UPPTCL norms.
Providing&laying alongwith Earthing of 50mmx6mm MS flat for structures and equipments including cutting,bending,welding,digging pit,painting,filling of land soil into the pit and removal of garbage after completion of work as per UPPTCL norms.
0.2 class accuracy ABT energy meters (Main + Check) including cable laying of CT &PT alongwith termination of cables at both end in a proper way.
Stringing of following Bus with specified ACSR conductors, tension fittings, suspension fittings & PG clamps to complete the work satisfactory as per technical specification (including cost of hoisting insulators, cutting of conductors and shifting of materials from store to site):
132KV Main Bus
132KV Transfer Bus
132KV Jack Bus for 40MVA Transformer
Bay wise interconnection (jumpering) of equipments with specified conductors:
40MVA Transformer bay including 132KV side (Panther Conductor) & 33KV side (Twin Moose)
Bus coupler Bay including opening of jumpers
Shifting of Main Tank of 40MVA Transformer to plinth from place of storage upto 20mtr. Distance including turning of tank if required.
Additional shifting of transformer tank upto 70 mtr distance (1 Job for every 5 mtr.)
Erection of 40MVA Transformer RTCC Panel including shifting from storage place to control room.
Complete erection of 40MVA Transformer including Radiators, Conservator tank, Bushing, Connecting pipe lines, Cooling fans and pumps, Marshalling box, OTI, WTI, Capillary pipes etc.
Topping of fresh transformer oil from transformer oil drums in suitable capacity oil tank and then centrifuging of transformer oil by ultra high vacuum oil filtration plant after connecting the centrifuging pipes with oil tanker to oil filtration plant including taking the BDV value of oil periodically till the required value is achieved and creating the vacuum inside 40MVA transformer before filling the transformer oil including vacuum stand test with all cost of centrifuging machine CFM operator, lubricant etc.
Centrifuging/ Dehydration of the complete transformer oil of 40MVA transformer by ultra high vacuum oil filtration plant after connecting the centrifuging pipes with transformer tank to oil filtration plant including taking the BDV values of oil and megger value of the transformer periodically till the required value is achieved. Including filling and topping up of the transformer oil under vacuum in main tank, radiators, conservator tank etc. and attending the oil leakage if any, will all cost of centrifuging machine, CFM operator, lubricant etc.
Complete earthing of 40MVA transformer with 50x6mm/ 75x10mm size MS Flat as per standard practice at two points.
Providing and Earthing of main tank with 75mmX10mm MS Flat, marshalling box and drive mechanism of cooling fans etc. with 50mmX6mm MS Flat and its onnection of with earthmat as per standard practice.
Providing and Earthing of HV & LV Neutrals with separate 75x10mm size MS Flat as of 40MVA transformer with the help of 75x10mm size MS Flat to be provided contractor, its jointing with earthmat/ delta including making of 2 new delta earthing for 132KV and 33KV Neutral bushing by 3 Mtr. long 36mm/40mm dia MS round bar after digging pits of size 1x1x1 CuM and necessory modification in existing support for earthing of neutral bushing support for its earthing work and then painting of earthing strips as per technical specification/ standard practice.
Termination of Control and Power cable as per cable schedule of 40MVA Transformer RTCC Panel, Control and Relay Panel, Cooling fan, Marshaling box etc. including cost of cable glands, lugs & ferruls complete and both end as per site and panel requirement.
Opening and Termination of Control and Power cable as per cable schedule of 132KV Buscoupler Bay , Control and Relay Panel etc. including cost of cable glands, lugs & ferruls complete and both end as per site and panel requirement.
Procurement of Clamps & Connectors for 132/33KV 40MVA Transformer at 132K.V. Sub Station Jalalpur:
Bolted type single Tension fitting for Moose Conductor suitable for Porcelain Disc Insulator with hardware set as per technical specification.
Bolted type single Tension fitting for Panther Conductor suitable for Porcelain Disc Insulator with hardware set as per technical specification.
Bolted type single Suspension fitting for Moose Conductor Suitable for Disc with hardware set as per technical specification.
Bolted type single Suspension fitting for Panther Conductor Suitable for Disc with hardware set as per technical specification.
4 Bolted Type PG Clamp suitable for Moose to Moose Conductor Complete with HDG nut bolt & washer as per technical specification.
4 Bolted Type PG Clamp suitable for Moose to Panther Conductor Complete with HDG nut bolt & washer as per technical specification.
4 Bolted Type PG Clamp suitable for Panther to Panther Conductor Complete with HDG nut bolt & washer as per technical specification.
Bus Post Clamp suitable for Twin Panther conductor complete with hot dip galvanized nut, bolts & washer as per technical specification.
TAJ ENTERPRISES
SHIVAM ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .