Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical 0 BAROO BAROO KARGIL KARGIL LADAKH 194103 | KARGIL | LADAKH | 194103 | Accepted-Technical Qualified |
| 3 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
19 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Construction Division Leh
Executive Engineer Construction Division Leh
Upgradation/ macadamization of the road within EJM college Leh
2026_PWD_19494_1
CDL 71 of Leh of 2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,540
Executive Engineer Construction Division Leh
₹3.1 L
25 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
19 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation and consolidation of subgrade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road roller including making goodtheundulations etc.andre-rollingthesubgradeanddisposalofsurplusearthwithleadupto50 metres. | 5,800 | Sqm | 155.37 | ₹9,01,146 |
| - | Construction of granular sub-base by providing close graded Material conforming
to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed
material by tippers to work site, for all leads & lifts, spreading in uniform layers of
specified thickness with motor grader on prepared surface and compacting with
vibratory power roller to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge. With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having
CBR Value-26 | 744 | Cum | 1,539.81 | ₹11,45,618.64 |
| - | Providing, laying, spreading and compacting graded stone aggregate (size range
53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including
premixing the material with water at OMC in for all leads & lifts, laying in uniform
layers with mechanical paverfinisher in sub- base / base course on well prepared
surface and compacting with vibratory roller of 8 to 10 tonne capacity to
achievethe desired density, complete as per specifications and directions of
Engineer-in-Charge. | 534.75 | Cum | 1,825.12 | ₹9,75,982.92 |
| - | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.50% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 356.5 | Cum | 8,808.65 | ₹31,40,283.73 |
| - | 2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of
13.2 mm and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot
bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively,
including a tack coat with hot straight run bitumen, including consolidation with
road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for
separately).
With paving Asphalt grade VG- 10 heated and then mixed with solvent at the
rate of 70 grams per kg of asphalt | 7,440 | Sqm | 281.58 | ₹20,94,955.2 |
| - | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and
retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG
10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100
sqm of road surface, including rolling and finishing with road roller all complete. | 7,440 | Sqm | 104.69 | ₹7,78,893.6 |
| - | Providing and applying tack coat using bitumen emulsion conforming to IS:8887,
using emulsion pressure distributer including preparing the surface & cleaning
with mechanical broom. With rapid setting bitumen emulsion On bituminous surface @ 0.25kg/sqm | 7,130 | Sqm | 33.87 | ₹2,41,493.1 |
| - | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods,
watering, rolling each layer with ½tonne roller, or wooden or steel rammers, and
rolling every 3rd and top-most layerwith power roller of minimum 8tonnesand
dressingup, inembankmentsforroads, floodbanks,marginalbanks,andguide
banks etc., lead upto 50 m and lift upto 1.5 m :All kinds of soil | 513 | Cum | 453.81 | ₹2,32,804.53 |
| - | Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12(1cement :6coarsesand:12graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 360 | Cum | 5,730.39 | ₹20,62,940.4 |
| - | Dry stone pitching (any thickness) including cost of stones. On Horizontal | 42 | Cum | 1,258.05 | ₹52,838.1 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_46169.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .