Tender Value
₹22.5 Cr
EMD Value
₹45.1 L
Closing Date
12 May 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Deposit Work
Above/Below/Par
WORKS
13 conditions · 2 needing a document upload
Financial Criteria: - As per GCC 10(b):- The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; Where: V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VI B, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
Technical Eligibility Criteria: - As mentioned in GCC 2022 clause 10(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. The work is executed for similar nature of work as under: Execution of any 25 kV AC OHE work The work must have been carried out in any of the following organizations: a) Central Government departments or State Government departments. b) Central government PSUs or State Government PSUs.
11 conditions · 9 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All other documents in terms of Para 10 of the TENDER FORM (Second Sheet) at Page Nos.12-16 of GCC April 2022.
Design, supply of materials, modification, erection, removal of infringements ,testing, & commissioning of 25KV AC OHE in connection with construction of 5th - 6th Line Kurla - CSMT in Mumbai Division of Central Railway"
LCF-DR-OHE-505-2025-24
LCF-DR-OHE-505-2025-24
Open
Works - General
18 Months
Mumbai, Maharashtra
₹0
₹45.1 L
12 May 2026
15 Apr 2026
28 Apr 2026
262 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 22,54,73,068 | ||
| — | 50.00 | — | — | ||
| Preparation of design & drawings for overhead quipment and verification of Purchaser's pegging plans | — | — | — | 9,77,200 | |
| — | 400.00 | — | — | ||
| M-20 Concrete of foundation and plinth in hard soil. | — | — | — | 37,06,400 | |
| — | 400.00 | — | — | ||
| M-20 Concrete of foundation and plinth in rocky soil. | — | — | — | 39,48,800 | |
| — | 1600.00 | — | — | ||
| M-20 Concrete of foundation and plinth in other than hard & rocky soil | — | — | — | 1,39,85,600 | |
| — | 1600.00 | — | — | ||
| Reinforcedconcrete foundations in all types of soil as per approved design . | — | — | — | 1,70,19,200 | |
| — | 250.00 | — | — | ||
| Supply only fabricated and galvanished steel. Fabrication, galvanised and supply only of K- series, B-series, T-series, G-series, S-series mast/portals- Uprights. | — | — | — | 2,88,39,750 | |
| — | 200.00 | — | — | ||
| Supply only fabricated and galvanished steel. Fabrication, galvanisation and supply only of portal booms/portal uprights made up of angle steel members. | — | — | — | 2,34,33,800 | |
| — | 200.00 | — | — | ||
| Supply only fabricated and galvanished small part steel. | — | — | — | 2,23,39,800 | |
| — | 250.00 | — | — | ||
| Erection of K/B/G/T Series cantilever mast, mast of head span/uprights of D/G type Portals | — | — | — | 38,51,500 | |
| — | 200.00 | — | — | ||
| Erection of portal booms/ Angle fabricated portal boom upright by purchaser's rail crane. | — | — | — | 30,33,800 | |
| — | 200.00 | — | — | ||
| Erection of small part steel work. | — | — | — | 32,27,800 | |
| — | 100.00 | — | — | ||
| Supply of guy rod assembly. | — | — | — | 9,69,600 | |
| — | 100.00 | — | — | ||
| Erection of guy rod assembly. | — | — | — | 2,61,800 | |
| — | 6.00 | — | — | ||
| Supply of OHE (including wiring) | — | — | — | 9,46,680 | |
| — | 12.00 | — | — | ||
| Erection of OHE (including wiring) | — | — | — | 33,51,708 | |
| — | 100.00 | — | — | ||
| Supply of 25 KV insulation with modified bracket assembly for two wire OHE with 125/129/242 sq.mm catenary & 193 sq.mm contact wire on structures. (Open route).The insulators shall be of Porcelain type only. | — | — | — | 30,00,600 | |
| — | 130.00 | — | — | ||
| Erection of 25 KV insulation with modified bracket assembly for two wire OHE with 125/129/242 sq.mm catenary & 193 sq.mm contact wire on structures. (Open route). The insulators shall be of Porcelain type only. | — | — | — | 4,65,270 | |
| — | 60.00 | — | — | ||
| Supply of suspension arrangement with 9 tonne insulator for 125/129/150/242 sq.mm 2 single catenary /feeder/jumper/ wire. (Cable Hanger) The insulators shall be of Porcelain type only | — | — | — | 5,64,000 | |
| — | 60.00 | — | — | ||
| Erection of suspension arrangement with 9 tonne insulator for 125/129/150/242 sq.mm 2 single catenary /feeder/jumper/ wire. (Cable Hanger) The insulators shall be of Porcelain type only | — | — | — | 84,420 | |
| — | 100.00 | — | — | ||
| Supply of Single Bracket Cantilever assembly with High (Long) Creepage Distance suitable for polluted zone type ST & BT insulators. The insulators shall be of Porcelain type only | — | — | — | 25,34,900 | |
| — | 170.00 | — | — | ||
| Erection of Single Bracket Cantilever assembly with High (Long) Creepage Distance suitable for polluted zone type ST & BT insulators. The insulators shall be of Porcelain type only | — | — | — | 5,38,730 | |
| — | 130.00 | — | — | ||
| Supply of materials for termination of OHE for 129/242/107/193 sq mm main contact/catenary/feeder wire with compensanting plate & one 9 ton insulator. The insulators shall be of Porcelain type only | — | — | — | 20,53,350 | |
| — | 130.00 | — | — | ||
| Erection of materials for termination of OHE for 129/242/107/193 sq mm main contact/catenary/feeder wire with compensanting plate & one 9 ton insulator. The insulators shall be of Porcelain type only | — | — | — | 3,37,740 | |
| — | 128.00 | — | — | ||
| Supply of 9 tonne cut in insulator for 193 sq mm contact wire. The insulators shall be of Porcelain type only. | — | — | — | 11,67,360 | |
| — | 128.00 | — | — | ||
| Erection of 9 tonne cut in insulator for 193 sq mm contact wire. The insulators shall be of Porcelain type only. | — | — | — | 1,79,328 | |
| — | 128.00 | — | — | ||
| Supply of 9 tonne cut in insulator for 129 /125 sq mm catenary / feeder wire. The insulators shall be of Porcelain type only. | — | — | — | 11,67,360 | |
| — | 128.00 | — | — | ||
| Erection of 9 tonne cut in insulator for 129 /125 sq mm catenary / feeder wire. The insulators shall be of Porcelain type only. | — | — | — | 1,79,328 | |
| — | 100.00 | — | — | ||
| Supply of 25 kV post insulator | — | — | — | 9,99,400 | |
| — | 160.00 | — | — | ||
| Erection of 25 kV post insulator | — | — | — | 83,200 | |
| — | 60.00 | — | — | ||
| Supply of 25 KV section insulator suitable for 193 sq.mm contact wire, For OHE system on turn out, cross-over/loop line. (242/129/125 sq mm catenary and 193 sq mm contact wire) | — | — | — | 48,83,760 | |
| — | 60.00 | — | — | ||
| Erection of 25 KV section insulator suitable for 193 sq.min contact wire, For OHE system on turn out, cross-over/loop line. (242/129/125 sq mm catenary and 193 sq mm contact wire) | — | — | — | 7,21,320 | |
| Each | 200.00 | Span | — | ||
| Supply of dropper & dropper adjustement for AC insulation on newly erected structure (All new droppers/fittings in one span) / For Droppering & reprofiling. | — | — | — | 27,25,600 | |
| Each | 200.00 | Span | — | ||
| Erection of dropper & dropper adjustement for AC insulation on newly erected structure (All new droppers/fittings in one span) / For Droppering & reprofiling | — | — | — | 8,12,400 | |
| — | 20.00 | — | — | ||
| Supply for 105 sq mm in-span jumper for 2 wire system | — | — | — | 1,26,020 | |
| — | 20.00 | — | — | ||
| Erection for 105 sq mm in-span jumper for 2 wire system | — | — | — | 7,160 | |
| — | 20.00 | — | — | ||
| Supply for 160 sq mm G Jumper. | — | — | — | 4,43,040 | |
| — | 20.00 | — | — | ||
| Erection for 160 sq mm G Jumper. | — | — | — | 84,400 | |
| — | 500.00 | — | — | ||
| Supply of 160 sq mm jumper wire | — | — | — | 9,20,000 | |
| — | 500.00 | — | — | ||
| Erection of 160 sq mm jumper wire | — | — | — | 23,500 | |
| — | 500.00 | — | — | ||
| Supply /catenary/contact Wire | — | — | — | 9,03,000 | |
| — | — | — | Sq.mm | ||
| — | 500.00 | — | — | ||
| Erection of PG/ Connector for 160/105/323/242/193/129/125 Sq.mm Jumper /catenary/contact Wire | — | — | — | 55,000 | |
| — | 24.00 | — | — | ||
| Supply for Formation of new IOL/UIOL at SP/SSP/TSS/Neutral section | — | — | — | 10,24,248 | |
| — | 40.00 | — | — | ||
| Erection for Formation of new IOL/UIOL at SP/SSP/TSS/Neutral section | — | — | — | 5,76,000 | |
| — | 50.00 | — | — | ||
| Supply of material for Turn outs/cross overs | — | — | — | 14,45,300 | |
| — | 50.00 | — | — | ||
| Erection of material for Turnouts/cross overs | — | — | — | 4,21,600 | |
| — | 20.00 | — | — | ||
| Supply of ATD without counter weight assembly as per Techincal specification andexplanatory notes. ( 5 pulley ATD) | — | — | — | 12,62,440 | |
| — | 20.00 | — | — | ||
| Erection of Regulating Equipment 5pully block type with counter weight as per Rly approved drawing | — | — | — | 1,40,000 | |
| — | 40.00 | — | — | ||
| Supply of material for Anti Creep arrangement | — | — | — | 7,64,680 | |
| — | 40.00 | — | — | ||
| Erection of material for Anti Creep arrangement | — | — | — | 1,12,400 | |
| — | 100.00 | — | — | ||
| Supply of a structure bond with 50 x 6mm G.I. flat. | — | — | — | 82,700 | |
| — | 100.00 | — | — | ||
| Erection of a structure bond with 50 x 6mm G.I. flat. | — | — | — | 55,900 | |
| — | 100.00 | — | — | ||
| Supply of a longitudinal bond with 50 x 6mm G.I. flat. | — | — | — | 52,200 | |
| — | 100.00 | — | — | ||
| Erection of a longitudinal bond with 50 x 6mm G.I. flat. | — | — | — | 54,100 | |
| — | 100.00 | — | — | ||
| Supply of transverse & special bond with 50 x 6mm G.I. flat. | — | — | — | 82,800 | |
| — | 100.00 | — | — | ||
| Erection of transverse & special bond with 50 x 6mm G.I. flat. | — | — | — | 57,200 | |
| — | 40.00 | — | — | ||
| Supply of single earth electrode | — | — | — | 1,53,640 | |
| — | 40.00 | — | — | ||
| Erection of single earth electrode | — | — | — | 1,06,240 | |
| — | 40.00 | — | — | ||
| Supply for Extra for special embedment of earth electrode. | — | — | — | 79,080 | |
| — | 40.00 | — | — | ||
| Erection for Extra for special embedment of earth electrode. | — | — | — | 99,400 | |
| — | 1.00 | — | — | ||
| Supply, testing of 25 KV/240V, 25 KVA auxiliary transformer | — | — | — | 2,94,607 | |
| — | 8.00 | — | — | ||
| Erection, oil filteration, testing & commissioning of 25 KV/240V, 25 KVA auxiliary transformer | — | — | — | 1,17,848 | |
| — | 4.00 | — | — | ||
| Supply, testing of 25 KV/240V, 50 KVA auxiliary transformer | — | — | — | 13,22,896 | |
| — | 4.00 | — | — | ||
| Erection, oil filteration, testing & commissioning of 50 KV/240V, 50 KVA auxiliary transformer | — | — | — | 66,148 | |
| — | 12.00 | — | — | ||
| Supply of 25KV DO Fuse Switch assembly. | — | — | — | 3,22,344 | |
| — | 12.00 | — | — | ||
| Erection, testing & Commissioning of 25KV DO Fuse Switch assembly. | — | — | — | 13,632 | |
| — | 12.00 | — | — | ||
| Supply of anti climbing device etc. for LT supply transformer. | — | — | — | 18,624 | |
| — | 12.00 | — | — | ||
| Erection of anti climbing device etc. for LT supply transformer. | — | — | — | 8,004 | |
| — | 2.00 | — | — | ||
| Supply of 150 A automatic changeover control panel for CLS Supply as per RDSO specification no. TI/SPC/PSI/CLS/0022 or Latest inclusive of termination of cable & required material. | — | — | — | 3,64,802 | |
| — | 2.00 | — | — | ||
| Erection, testing & commissioning of 150 A automatic changeover control panel for CLS Supply as per RDSO specification no. TI/SPC/PSI/CLS/0022 or Latest inclusive of termination of cable & required material. | — | — | — | 18,240 | |
| — | 2.00 | — | — | ||
| Supply of 300 A automatic changeover control panel for CLS Supply as per RDSO specification no. TI/SPC/PSI/CLS/0022 or Latest inclusive of termination of cable & required material. | — | — | — | 5,47,064 | |
| — | 2.00 | — | — | ||
| Erection, testing and commissioning of 300 A automatic changeover control panel for CLS Supply as per RDSO specification no. TI/SPC/PSI/CLS/0022 or Latest inclusive of termination of cable & required material. | — | — | — | 18,240 | |
| — | 12.00 | — | — | ||
| Supply of LV Box Assy (with required fuse) for 25KV/50KVA AT as per RDSO drawing | — | — | — | 78,732 | |
| — | 12.00 | — | — | ||
| Erection of LV Box Assy (with required fuse) for 25KV/50KVA AT as per RDSO drawing | — | — | — | 13,908 | |
| — | 5000.00 | — | — | ||
| Transportation & laying connecting testing of 1.1 grade 2x185sq mm/300 sq mm XLPE insulated PVC sheated cable (Cable supplied by railways from Kalyan/Juinagar). | — | — | — | 6,30,000 | |
| — | 34.00 | — | — | ||
| Supply of cable end termination of 2 core 185sq mm/300 sq aluminium armoured cable with suitable gland and lugs etc. | — | — | — | 1,52,966 | |
| — | 34.00 | — | — | ||
| Erection & commissioning of cable end termination of 2 core 185sq mm/300 sq aluminium armoured cable with suitable gland and lugs etc. | — | — | — | 15,300 | |
| — | 2000.00 | — | — | ||
| Supply of RCC truncking with RCC warning cover of size 500mm X 220mm x 215mm | — | — | — | 4,66,000 | |
| — | 2000.00 | — | — | ||
| Placing of RCC truncking with RCC warning cover of size 500mm X 220mm x 215mm | — | — | — | 18,000 | |
| — | 100.00 | — | — | ||
| Supply of 75 mm dia size B' class GI pipes for protection of cables on wall/poles | — | — | — | 47,400 | |
| — | 100.00 | — | — | ||
| Erection of 75 mm dia size B' class GI pipes for protection of cables on wall/poles | — | — | — | 3,400 | |
| — | 100.00 | — | — | ||
| Supply of HT/LT cable router make | — | — | — | 16,400 | |
| — | 100.00 | — | — | ||
| Erection of HT/LT cable router make | — | — | — | 1,800 | |
| — | 60.00 | — | — | ||
| Supply of 25KV, 1600 amps, single pole Isolators without earth contact assembly. | — | — | — | 58,88,160 | |
| — | 60.00 | — | — | ||
| Erection & commissioning of 25KV, 1600 amps, single pole Isolators without earth contact assembly. | — | — | — | 3,95,880 | |
| — | 60.00 | — | — | ||
| Supply of Extra on item 91-92 for an inter-locking device- mechanical/electrical (Also provision of copper beaded flexible jumper for isolator | — | — | — | 2,53,560 | |
| — | 60.00 | — | — | ||
| Erection of Extra on item 91-92 for an inter-locking device- mechanical/electrical (Also provision of copper beaded flexible jumper for isolator | — | — | — | 30,360 | |
| — | 200.00 | — | — | ||
| Supply of Danger Board for 25 KV. | — | — | — | 3,59,600 | |
| — | 200.00 | — | — | ||
| Erection of Danger Board for 25 KV. | — | — | — | 27,000 | |
| — | 200.00 | — | — | ||
| Supply of Warning Board for 25 KV. | — | — | — | 1,49,800 | |
| — | 200.00 | — | — | ||
| Erection of Warning Board for 25 KV. | — | — | — | 29,000 | |
| — | 200.00 | — | — | ||
| Supply of General caution notice board for Rly station for 25 KV. | — | — | — | 1,23,200 | |
| — | 200.00 | — | — | ||
| Erection of General caution notice board for Rly station for 25 KV. | — | — | — | 33,000 | |
| — | 200.00 | — | — | ||
| Supply of General caution notice board for staff for 25 KV. | — | — | — | 1,23,600 | |
| — | 200.00 | — | — | ||
| Erection of General caution notice board for staff for 25 KV. | — | — | — | 33,000 | |
| — | 200.00 | — | — | ||
| Supply of retro reflective number plate | — | — | — | 2,34,800 | |
| — | 200.00 | — | — | ||
| Erection of retro reflective number plate | — | — | — | 11,200 | |
| — | 160.00 | — | — | ||
| Dismantling/cutting/ loading and transporting to Hazibunder (Scrapped steel) and to JNJ store (new full length steel) of old released CTL/POM/Single mast& Structure at site. | — | — | — | 9,99,360 | |
| — | 8000.00 | — | — | ||
| Dismantling of catenary / feeder conductor from site to Parel Store Depot. | — | — | — | 6,96,000 | |
| — | 20.00 | — | — | ||
| Dismantling Assembely. | — | — | — | 59,300 | |
| — | — | — | Isolator/AT/Guy | ||
| Each | 100.00 | Span | — | ||
| Supply of material for Splicing & extension of OHE with Contractor's supply material - U clamps etc for both contact and catenary. | — | — | — | 11,50,500 | |
| Each | 100.00 | Span | — | ||
| Erection of materials for Splicing & extension of OHE with Contractor's supply material -U clamps etc for both contact and catenary. | — | — | — | 16,30,800 | |
| Each | 200.00 | Span | — | ||
| Slewing of OHE | — | — | — | 8,57,000 | |
| — | 280.00 | — | — | ||
| Transfer of equipment from one mast or support to another mast or support. (242/ 150/ 65/ 193/ 125 sq.mm /earth wire) | — | — | — | 10,76,320 | |
| — | 4.00 | — | — | ||
| Transfer of equipment from one mast or support to another mast or support. (242/ 150/ 65/ 193/ 125 sq.mm /earth wire) | — | — | — | 2,12,624 | |
| — | 500.00 | — | — | ||
| Breaking of foundation upto 200 mm below track formation. | — | — | — | 21,69,500 | |
| — | 100.00 | — | — | ||
| Extra for manual erection of Portal booms by upto 50MT Road Crane dismantle of portal in power block or without power block | — | — | — | 9,44,300 | |
| — | 6.00 | — | — | ||
| Drop out fuse rod (Operating Pole) 25 KV DO Fuse switch as per RDSO spec. No. ETI/PSI/14(1/86) & as per IM CORE approved Drg. No. IM.118/04 | — | — | — | 40,248 | |
| — | 20.00 | — | — | ||
| Loading, Transporting and unloading of railway supply material from JNJ /KYN stores to work site with contractors truck of 5-8 Tonne capacity including all tools & crane required for loading & unloading the material | — | — | — | 4,60,280 | |
| Lumpsum | 1.00 | 2,41,381 | — | ||
| Supply of material for Provision of Anti Theft charging of OHE. | — | — | — | 2,41,381 | |
| Lumpsum | 4.00 | 1,26,999 | — | ||
| Erection of material for Provision of Anti Theft charging of OHE. | — | — | — | 5,07,996 | |
| Lumpsum | 2.00 | — | — | ||
| Extra @ 50% of erection rate for execution of erection work under Power Block | — | — | — | 74,08,568 | |
| — | 50.00 | — | — | ||
| Supply of material, repairing, water proofing & sealing (fiber & chemical based on gel sealing) of platform roof sheets at locations where OHE masts / portals uprights are erected / dismantled. | — | — | — | 2,86,000 | |
| — | 12.00 | — | — | ||
| "Battery Operated LED-Based Torch Light cum Flashing Hand Signal Lamp, Specification No.: RDSO/SPN/195/2019 Version 3.0" | — | — | — | 32,400 | |
| — | 12.00 | — | — | ||
| — | — | — | 48,420 | ||
| Aluminium | :- | LED attached. | — | ||
| — | — | — | as | ||
| — | — | — | per | ||
| — | 1000.00 | — | — | ||
| Transportation,uncoiling, erection,Laying, testingandcommissioning ofof 110/132 KV,S/C 400sqmm.copper leadsheathed XLPEcable as pertechnical spec.including bondingcable of requiredquantity.confirming to BIS7098- Part 3/IEC-60502 - Part 2/IEC60840 or latest. | — | — | — | 7,15,000 | |
| — | 3.00 | — | — | ||
| Supply of outdoor oil TYPE TERMINATION KIT of 110/132KVS/C copper cable of size 400 sqmm as per approved technicalspecification | — | — | — | 11,80,254 | |
| — | 3.00 | — | — | ||
| Erection of oil type outdoortermination kit for 110/132KVXLPE cable. | — | — | — | 1,44,144 | |
| — | 3.00 | — | — | ||
| Supply of straight through joint kit for110/132 KV 400Sqmm S/C XLPEcable as per Rly specification | — | — | — | 9,81,405 | |
| — | 3.00 | — | — | ||
| Erection of straight through joint kitfor 110/132 KV XLPE cable. | — | — | — | 1,26,765 | |
| — | 6.00 | — | — | ||
| Supply of cable route marker/jointmarker for 110/132KV cable | — | — | — | 1,638 | |
| — | 6.00 | — | — | ||
| Fixing of cable route marker/jointmarker for 110/132KV cable | — | — | — | 378 | |
| — | 5.00 | — | — | ||
| Re-Coilling of 129/125/193 sqmm Catenary/CONTACT Wire from damaged Drum to New Drum for manual wiring in Kharkopar-Uran section | — | — | — | 1,29,800 | |
| — | 10.00 | — | — | ||
| Supply of G.I Junction box on LV side of auxiliary transformer for AT | — | — | — | 74,790 | |
| — | 10.00 | — | — | ||
| Erection of G.I Junction box on LV side of auxiliary transformer for AT | — | — | — | 8,730 | |
| — | 50.00 | — | — | ||
| Erection of Special poral(Charges to include material loading , launching by 100MT Crane charges,Total work in Planned Block) | — | — | — | 1,22,87,500 | |
| — | 2000.00 | — | — | ||
| Supply of Porcelain type insulators High (Long) Creepage Distance suitable for polluted zone type ST insulators. | — | — | — | 86,22,000 | |
| — | 2000.00 | — | — | ||
| Supply of Porcelain type insulators High (Long) Creepage Distance suitable for polluted zone type BT insulators. | — | — | — | 82,72,000 | |
| — | 100.00 | — | — | ||
| Supply of Extra material for AC/DC BKT assembly to complete bracket assembly for item no.17 &21 (Excluding ST, BT,RT, Steady arm & insulator) | — | — | — | 3,35,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
01SPECIALINSTRUCTIONTOTENDERER.pdf
ATTACHMENT
03CONDITIONSOFCONTRACT.pdf
ATTACHMENT
04PRICESANDPAYMENTS.pdf
ATTACHMENT
05tenderschedule.pdf
ATTACHMENT
07SPECIFICATIONS.pdf
ATTACHMENT
08DESIGNSANDDRAWINGS.pdf
ATTACHMENT
09ERECTIONTESTINGDRAWINGSSPECIFICATIONS.pdf 09 erection fittings
ATTACHMENT
10GCC2022withcorrectionslip.pdf
ATTACHMENT
02INSTRUCTIONSTOTENDERERS_1.pdf
ATTACHMENT
0650506EXPLANATORYNOTES15.04.2026_1.pdf
ATTACHMENT
09ERECTIONTESTINGDRAWINGSSPECIFICATIONS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .