Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹40.0 L+₹6,398.56 (0.16%)Rejected-Finance UTTAR PRADESH UP | BASTI | UTTAR PRADESH | 272148 | L2 | Rejected-Finance L2 |
Tender Value
₹40.0 L
EMD Value
₹4.0 L
Closing Date
14 May 2026, 10:00 amClosed
EO
Nagar panchayat kiraoli, agra, UP 283122
beautification work
2026_DOLBU_1133355_2
02/NPK/2026-27
Open Tender
Civil Works
Percentage
60 days
Nagar panchayat kiraoli
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Officer
₹4.0 L
8 Jun 2026
7 May 2026
14 May 2026
7 May 2026
14 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. DSR 2.8 | 124.2 | m3 | 204.48 | ₹25,396.42 |
| 2 | Cement Concrete 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 | 32.76 | m3 | 5,349.46 | ₹1,75,248.31 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) : DSR 6.1.1 | 57.39 | m3 | 5,600.96 | ₹3,21,439.09 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) : DSR 5.2.2 | 33.69 | m3 | 8,522.82 | ₹2,87,133.81 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (TMT Bars) Fe-500 DSR 5.22.6 | 33.06 | qtl | 8,469.46 | ₹2,80,000.35 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns : DSR 4.3.1 | 54.72 | sqm | 307.96 | ₹16,851.57 |
| 7 | Centering and shuttering including strutting, propping etc. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.DSR 4.3.2 | 104.7 | sqm | 661.62 | ₹69,271.61 |
| 8 | Centering and shuttering including strutting, propping etc. Columns, piers, abutments, pillars, posts and struts.DSR 4.3.3 | 125.86 | sqm | 754.91 | ₹95,012.97 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of super structure class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) DSR 6.4.1 | 87.98 | m3 | 7,337.84 | ₹6,45,583.16 |
| 10 | 12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and DSR 13.4.1 | 200 | sqm | 280.35 | ₹56,070 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_2143474.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .