Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
16 Sept 2026, 6:00 pm4d left
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_324258_3
2nd Call e-NIT No. 176 REW UDHAMPUR of 2026-27 Dated 10-09-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹2,900
11 Sept 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
16 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 29.2 | cum | 592.9 | ₹17,312.68 |
| 2 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 17.9 | cum | 5,402.9 | ₹96,711.91 |
| 3 | 15mm Cement plaster in 1 : 6 mix. ( 1 cement : 6 coarse sand) | 55.77 | sqm | 306.85 | ₹17,113.02 |
| 4 | Carriage of sand 1.50 Km by AT from river Ujh | 7.76 | cum | 1,467.68 | ₹11,389.2 |
| 5 | Add cost of CIB | 1 | No. | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1093492.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .