Tender Value
₹39.8 L
EMD Value
₹40,000
Closing Date
25 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Ilayangudi Block in Sivagangai District - Package No. 96
2022_RDTN_247616_1
96_Pack_AGAMT II 21-22/ILY
Open Tender
Civil Works
Item Rate
30 days
SIVAGANGAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,000
5 Sept 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
Amount
CONSTRUCTION OF STEP AT ARANMANAIKARAI VILLAGE KALIAMMAN KOIL OORANI IN ARANMANAIKARAI PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
DESILTING OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT AVUDAIYAR OORANI IN ARANMANAIKARAI VILLAGE AND PANCHAYAT
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
DESILTING OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT PILLAIYAR KOIL OORANI IN KATTIDAM VILLAGE IN SATHANOOR PANCHAYAT
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
DESILTING OF OORANI (MAIN POND, RETAINING WALL, AND STEPS) AT MAYANA OORANI IN BIRAMANAKURUCHI VILLAGE AND PANCHAYAT
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
DESILTING OF OORANI RETAINING WALL, AND STEPS AT Ayyanar Kovil OORANI IN BIRAMANAKURUCHI VILLAGE AND PANCHAYAT
Construction of Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Construction of Step
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
DESILTING OF PUTHU KANMOI AND RECONSTRUCTION OF SLUICE AT KATCHATHANALLUR PANCHAYAT
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Re - Construction of Sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Dismantling Without damaging the near by strectures if any, clearing away and carefully stacking materials useful for reuse for any thickness of wall in Brick or stone masonry in cement mortar walls under 3m high etc., complete complying with standard spe
Dismantling Without damaging the near by strectures if any,clearing away and carefully stacking materials useful for reuse for any thickness of Plain cement concrete complete complying with standard specification and as directed by the Engineer in char
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departm
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including breaking clods watering and compaction using Power Roller to atleast 95% of Proctor Density at OMC in each layer and
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TAMILARASAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .