Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical As per TD |
| 2 | Accepted-Technical | Accepted-Technical As per TD |
| 3 | Accepted-Technical | Accepted-Technical As per TD |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
9 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PHED Division Malpura
Executive Engineer PHED Division Malpura
ANNUAL RATE CONTRACT FOR LEAKAGES REPAIRING AND REMOVAL OF ILLEGAL CONNECCTION WORK OF PIPELINES AT VARIOUS JANTA JAL YOJNA OF BLOCK PEEPLU UNDER SUB DIVISION PEEPLU
2026_PHCJA_532713_1
EE PHED DIV MALPURA 223/2025-26
Open Tender
Civil Works - Water Works
Percentage
365 days
Executive Engineer PHED Division Malpura
As Per Tender Document
3 documents required · 3 mandatory
₹1,000
Executive Engineer PHED Division Malpura
₹20,000
Yes
18 Feb 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
5% Add on above item no. 1 for B.T. Road
10 % Add on above item no. 1 for C.C. Road
20 % Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil
5% Add on above item no. 2 for B.T. Road
10 % Add on above item no. 2 for C.C. Road
20 % Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) In all type Soil
5% Add on above item no. 3 for B.T. Road
10 % Add on above item no. 3 for C.C. Road
20 % Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil
5% Add on above item no. 4 for B.T. Road
10 % Add on above item no. 4 for C.C. Road
20 % Add on above no. 4 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
5% Add on above item no. 5 for B.T. Road
10 % Add on above item no. 5 for C.C. Road
20 % Add on above no. 5 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
5% Add on above item no. 6 for B.T. Road
10 % Add on above item no. 6 for C.C. Road
20 % Add on above no. 6 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
5% Add on above item no. 7 for B.T. Road
10 % Add on above item no. 7 for C.C. Road
20 % Add on above no. 7 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil
80 mm to 110 mm
125 mm to 165 mm
5% Add on above item no. 11 for B.T. Road
10 % Add on above item no. 11 for C.C. Road
20 % Add on above no. 11 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil
80 mm to 100 mm
125 mm to 150 mm
5% Add on above item no. 12 for B.T. Road
10 % Add on above item no. 12 for C.C. Road
20 % Add on above no. 12 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Labour charges for removal of complaint of polluted water supply to the consumers
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
5% Add on above item no. 14 for B.T. Road
10 % Add on above item no. 14 for C.C. Road
20 % Add on above no. 14 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
5% Add on above item no. 15 for B.T. Road
10 % Add on above item no. 15 for C.C. Road
20 % Add on above no. 15 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Nit223.pdf
Tender Documents • 2.43 MB
BOQ_949447.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .