Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹14.1 L+₹33,829.36 (2.46%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹14.9 L+₹1.2 L (8.54%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹15.2 L+₹1.5 L (10.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹16.2 L+₹2.5 L (18.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.9 L
EMD Value
₹47,800
Closing Date
23 Apr 2026, 4:00 pmClosed
Ex. Engineer RnB division pahalgam
Ex. Engineer RnB division pahalgam
Reconstruction of Damaged foot Bridge for Gujjar Basti near Rafting point at Pahalgam
2026_PWDJK_307737_1
ENIT NO 03 OF 2026-27
Open Tender
Civil Works
Percentage
30 days
Pahalgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Convener, purchase committee, Directorate of ISM
₹47,800
2 May 2026
11 Apr 2026
24 Apr 2026
11 Apr 2026
23 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by EIC. All Kinds of soil | - | CUM | - | - |
| - | P/L of Soling / RBM Filling tightly hand packed i/c carriage charges and headload charges complete job. | - | CUM | - | - |
| - | Providing and laying in position cement concrete of specified grade Of 1:4:8 mix ( 1 cement : 4 coarse sand : 8 graded stone agg.40 mm nominal size excluding cost of centering and Shuttering all work up to plinth . | - | CUM | - | - |
| - | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | - | CUM | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | - | SQM | - | - |
| - | Engagement of Labour for dismantling old wooden work and its disposal all job complete | - | NO | - | - |
| - | Providing beams including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with : Second class deodar wood | - | CUM | - | - |
| - | Providing beams/Planks/Railing including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with :Second class deodar wood all job complete incl. all labour charges for fixing | - | CUM | - | - |
| - | Providing jafri posts/Vertical posts/Runner including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete with :Second class deodar wood all job complete incl. all labour charges for fixing | - | CUM | - | - |
| - | Dismantling old protection work including cutting of crates and stacking of stones | - | CUM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_998133.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .