Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-AOC L1 | |
| 2 | L2₹23.0 L+₹16,521.95 (0.72%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L2 | Rejected-Finance L2 | |
| 3 | L3₹23.1 L+₹25,662.83 (1.12%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹46,599
Closing Date
17 Nov 2021, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Supply and delivery of ACSR conductor, electrical accessories with painting including dismantling and redrawing of ACSR conductor with stay arrangement, safety device etc. for LTOH line at Mela Ground and Chemaguri under GS Permanent Works, 2022
2021_PHED_346536_3
WBPHE/EE/SMD/NIeT- 09 of 2021-2022
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Ganga Sagar and Chemaguri
Please refer Tender documents.
6 documents required · 6 mandatory
₹46,599
Yes
10 Feb 2022
11 Oct 2021
23 Nov 2021
11 Oct 2021
17 Nov 2021
11 Oct 2021
Amount
Painting the arm bracket (for S.V lamp fixture) size 3.4mtr long for fitting etc after scraping and two coats of red lead paint as per direction of EIC.
Painting of arm bracket two coats of blue coat oil bound paint after scraping of approved make as per direction of the EIC
Painting the existing “D” type iron clamp and pole clamp etc and iron angle after scraping the surface by two coat of red primer paint as per direction of EIC.
Supply and delivery at site [weasel] ACSR conductor 6/1/2.59 as per direction
Drawing ACSR conductor [in item no.4] to the existing overhead line in vertical configuration for medium pressure line by ACSR conductor including supply binding wire, jumper, insulator etc in different places outside and inside Mela ground complex as per direction of EIC
Supply and delivery at site of the following electrical accessories:-
Pole bracket of MS angle iron 50mm x 50mm x 6mm x 1.25mtr long with arrangement of vertical configuration for 4 wire system of LT overhead line and continuous earth wire
Supply of suitable size D type iron clamp set [galvanized] with necessary nuts, bolts, washer size 3.5” dia 5” long as per direction of EIC
3.5” x 3” porcelain shackle insulator of LTOH as per direction of EIC including loading unloading and carrying complete as per direction of the EIC
Changing of broken insulator by supplying new insulator (item no. 6(c) in different position as per direction of EIC.
Fitting fixing of “D” type iron clamp, pole clamp and shackle insulator size on “D” type iron clamp complete as per direction of EIC (Shackle insulator will be supplied departmentally)
Dismantling the existing damaged “D” type iron clamp, pole clamp from PCC pole in main island and other areas and damaged materials return to the departmental store at Sagar as per direction of EIC
Fitting fixing the above MS iron angle with all fitting fitted on pole clamp including supply of necessary nuts, bolts and washers as required for the above work complete as per direction of EIC.
Replacement of bolts, nuts, washer and insulator etc of the above works as requirements complete the works as per direction of EIC including supply of all materials.
Earth filling to the level of existing PCC poles and packing bricks bates by supplying required quantity by bates after earth cutting of the pole base and the PCC pole in original position complete by providing stay wire and other materials as per direction of EIC
Re-strengthening the existing PCC pole in different places after disconnection of ACSR and stay wire etc at main island and reconnection of the same of dismantling items to complete the work in original as per direction of EIC.
Redrawing the dismantled overhead line in vertical configuration for medium pressure line by ACSR conductor (single run) including supply binding wire for jumper, insulator etc in different places i.e. Road no.5, Pilgrim, Trench Latrine, Sea side etc complete as per direction of EIC (ACSR conductor will be supplied departmentally).
Withdrawing the existing PCC pole in different places at main island after dismantling LTOH accessories from the PCC pole and staging the damaged pole at Sagar Store properly as per direction of the EIC
Re-erection of the new PCC pole at different places at main island by excavation of earth of any kind of soil upto 2M depth below ground level and refitting electrical accessories [which was dismantled at the time of withdrawing in item no.5] complete as per IE rules at main mela ground
Making stay arrangement by necessary materials which will be required i.e. stay wire of required length, stay rod, clamp, chips, sand etc as per IE rules and ISS complete as per direction of EIC
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts, nuts and washer etc including supply and fitting fixing 8 SWG GI wire and restoring the surface duly rammed as per direction and inter connection with earth spike to continue running earth on the top of the PCC pole complete and testing as per satisfaction and direction of EIC.
Dismantling the existing ACSR conductor and earth wire by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, safety device, binding wire from the PCC pole in different places at main island complete as per direction of EIC.
Redrawing the ACSR conductor and earth wire of the same in item no.1 by single run for medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at main island on existing PCC pole and testing complete as per direction of EIC [binding wire will be supplied by the agency]
Supply and fitting fixing of hexagonal type safety device 10SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Supply and drawing of continuous earth wire from pole to pole by supplying 10SWG GI wire with all necessary materials and inter connection to earth electrode as per direction of EIC and IE rules complete after dismantling the damaged earth wire
Cutting the jungle of the different type trees for maintenance all the overhead wire at Ganga Sagar Main Mela Ground in consultation with the local Panchayet as per direction of the EIC. [14KM long road approx.]
Supply, delivery and storage at site of L.T. spacer for 3 phase 4 wire system [Riverrine charges includrd]
Fitting fixing of the departmental and new supplied L.T. spacer on LTOH line by skilled technician including necessary scaffolding arrangement to complete the work as per direction and IE rules.
Dismantling the existing L.T. spacer from LTOH line after completion of mela by necessary tools and tackles as per dirtection including storage the same to the departmental store.
Dismantling the existing ACSR conductor by single run for medium pressure lines at different places i.e. trench, latrine, pilgrim, road no.5, link road, dhabla hut area, sea beach area at main Mela ground and outside the mela ground at G.S. Main island (after Mela) as per direction of EIC.
Arrangement of binding and proper marking the above ACSR conductor i.e. pole no, area etc complete as per direction of EIC.
Carrying charges of ACSR conductor from different places at main mela ground and outside mela ground to Sagar store and proper staging the materials at departmental store as per direction of EIC.
Dismantling the existing ACSR conductor and earth wire by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, insulator, safety device binding wire from the PCC pole in all complete as per direction of EIC.
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Supply and delivery the following electrical materials at site as per direction:
Supply of 3.5” x 3” porcelain shackle insulator of LTOH as per direction of EIC.
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Supply of suitable size D type iron clamp set (galvanized) with necessary nuts bolts
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Pole bracket of MS Iron angle of 50 mm x 50 mm x 6 mm – 1.25 mtr. Long with arrangenet of vertical configuration for 4 wire system of overhead line with continuous earth wire
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Changing of broken insulator by supplying new insulator (item no. 28a) in different position as per direction of EIC.
Fitting fixing of D type iron clamp set (galvanized) with necessary nuts bolts washer etc in different position as per direction.[item 28b}
Fitting fixing the above MS iron angle with all fitting (item No. 28C) fitted on pole clamp including supply of necessary nuts, bolts and washers as required for the above work complete as per direction of EIC.
Redrawing the ACSR conductor and earth wire with same (in item no.27) by single wire run for medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at Chemaguri point on the existing PCC pole and testing complete as per direction of the EIC (Binding wire will be supplied by the agency).
Supply and fitting of hexagonal type safety device 10SWG GI wire for LTOH line as per direction of EIC and IE rules complete.
Supply and drawing of continuous earth wire from pole to pole by supplying 10nos SWG GI wire with all necessary inter connection to earth electrode as per direction of the E.I.C.
Making earthing arrangement by supplying 5/8” earth spike of 2M long with galvanized bolts, nuts and washer etc. including supplying and fitting fixing 8nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection from earth spike to continuous running earth on the top of the PCC pole
Cutting the jungle of the different type trees for maintenance of all the the overhead wire at chemaguri point in consultation with the local Panchayet as per direction of the EIC. [14KM long road approx.]
Carrying the all unserviceable materials from works site to departmental store, Sagar including loading and unloading all complete as per direction
Providing one Electrician and two helper at site for emergency maintenance of LTOH line as per instruction for the period from 06.01. 2022 to 16.01.2022. This includes the cost of tools and plants on hire basis
Considering present pandemic situation actual quantity of work may differ from BOQ which shall be finalized by the EIC / competent authority in due course..
ADD GST @ 12%
ORIENTAL ENGINEERING CO.
H.K.DAS AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .