Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Pressure parts Unit I Boiler Statutory inspection 2022 Water washing of boiler Ist and IInd pass area Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
2022_EB_233046_1
CE / MTPS-I / SE / M-I / BM / OT. 91 / 2022-23
Open Tender
Power/Energy Projects/Products
Works
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the tender Specification
4 documents required · 4 mandatory
₹0
₹13,700
Yes
27 May 2022
19 May 2022
26 May 2022
19 May 2022
25 May 2022
19 May 2022
Amount
Water washing of boiler inter-pass area (area inclusive of re-heater coils, water wall Screen tubes, S.H Screen tubes etc.)
Water washing of boiler I pass water walls inclusive of gooseneck bends area through peepholes.
Water washing of boiler II pass
Removal of heavy lump soot deposited on boiler first pass tubes such as water walls and platen super heater coil by using wire brush/ scrapping with assistance of sky climber
Charges for leading, lifting of platform material arranging scaffolding and platform wherever required in the boiler area for rectification works, dismantling after completion of work and normalizing site.
Charges for renewal of defective boiler tubes of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test.
Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test.
ARC FILLING: Grinding of Boiler tubes for Arc filling of size 150 x 25 MM area for 3 Layers
ARC FILLING: Charges IBR Welder for Arc filling of area 150 x 25 MM by 3 layer
Charges for fin welding by cleaning, surface preparation and welding.
Charges for removal and refixing the insulation and skin casing sheets to carry out Boiler tubes & fin welding rectification works and reposition the dislodged /damaged insulation and skin casing sheet in Ist & IInd pass Wall tube of Boiler including the charges for transportation of insulation and skin casing sheets, consumables, T&P’s and for necessary scaffolding arrangements.
Charges for attending on defective / passing valves dismantling, inspection, lapping of valve seat and disc, renewal of sealing rings, gland packing etc., inspection of drive bush, bearings, etc. and renewing if necessary and assembling the valve & actuators.Main steam stop valve and 300/250 valve
Valve of sizes 150/250, 100/250 and 65/250
Charges for dismantling of drum & SH safety valves removal of disc providing plug and re assembling with disc after hydro test etc.without disturbing its initial settings
Charges for fixing readymade shrouding at erosion prone Boiler tubes & bends by welding clamps including the cost of welding electrodes.
Charges for leading, lifting of refractory at store and site, stacking at Boiler elevation, chipping removal of cracked/ defective refractory, cleaning, surface preparation, refractory preparation and application on damages by patch work at various elevation of Boiler, removal of loose refractory, lowering, disposing to waste disposal area
Charges for chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application and curing the patch worked refractory in Boiler at various elevation
Charges for transportation of sky climbers ( to & fro )
Charges for erection of sky climbers and dismantling after completion of works
Charges for operation of sky climbers as per the requirements to assist various overhauling works such as Boiler cleaning, burner overhaul, tube thickness survey, tube rectification works etc., during the entire overhaul period.
Cutting gas Oxygen & Acetylene
Argon gas for Tig welding
Welding electrode Supratherm special 2.5mm
Welding electrode cromotherme -1 .2.5mm
T & Ps and consumables
THIAGARAJAN ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .