EXECUTIVE ENGINEER, RCD, ROAD DIVISION, LATEHAR
EXECUTIVE ENGINEER, ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, LATEHAR
Construction of R.C.C. Drain of 400 m in Km.-31st, 120 m in Km.-38th, 160m in Km.-39th and 50 m in Km.-5th of Kutmu - Garu - Mahuadar (SH-09) road for the Year of 2026-27
2026_CECOM_116934_1
RCD /LATEHAR/640/2026-27 (1st Call)
Open Tender
Civil Works
Percentage
60 days
Kutmu garu mahuadanr road in km 5, 31, 38, 39
As per document supporting technical qualification as per F2 Document
2 documents required · 2 mandatory
₹10,000
₹1.2 L
11 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ordinary soil Mechanical Means Depth upto 3 m | 1 | Cum. | 57.4 | ₹57.34 |
| 2 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | - | Cum. | 4,944.03 | - |
| 3 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M20 using batching plant, transit mixer & concrete pump Height upto 5m | 1 | Cum. | 5,734.04 | ₹5,728.31 |
| 4 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M30 using batching plant, transit mixer & concrete pump Height upto 5m | 0.8 | Cum. | 6,248.69 | ₹4,998.95 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications | 1 | MT | 88,272.63 | ₹88,184.36 |
| 6 | Construction of Subgrade and Earthen
Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | - | Cum. | 131.3 | - |
| 7 | Add 18% GST | - | Nos | - | - |
| 8 | Add 1% Labour Cess | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
640document.pdf
Tender Documents • 9.23 MB
BOQ_158069.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].