| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 CrAccepted-AOC | ₹35.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹40.4 CrRejected-Finance | ₹40.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹41.1 CrRejected-Finance | ₹41.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹41.4 CrRejected-Finance | ₹41.4 Cr | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
23 Mar 2023, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
Widening and Strengthening of Paliya Lucknow road (NH) Km-159, Raddhepur Sakatpur Babnapur to Km-18 of Sandi Shahabad road (MDR) in F.Y. 2022-23 in Distt. Hardoi.
2023_CEUCZ_785277_1
955/M/1MT/E-TENDER/UC/22-23 DATE 17.02.2023
Open Tender
Civil Works
545 days
HARDOI
Widening and Strengthening of Paliya Lucknow road (NH) Km-159, Raddhepur Sakatpur Babnapur to Km-18 of Sandi Shahabad road (MDR) in F.Y. 2022-23 in Distt. Hardoi.
2 documents required · 2 mandatory
₹2,714
₹50 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
2 Dec 2023
16 Mar 2023
24 Mar 2023
16 Mar 2023
23 Mar 2023
16 Mar 2023
18 Mar 2023
Amount
Construction of embankment and earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 (including labour cess and excluding GST)
Construction of embankment and earthen Shoulders with approved material obtained from borrow pits (for carted earth) with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 (including labour cess and excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (including labour cess and excluding GST)
Construction of embankment and earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 (Compaction only) (including labour cess and excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.in 2 Layers (including labour cess and excluding GST)
Providing, laying, and spreading graded stone aggregate to Stablized wet mix macadam specification (OPC cement 1% & 3.5% SS bitumen emulsion by weight of mix) including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(including cost of emulsion & Cement) (including labour cess and excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom. (Including cost of Bitumen VG-10) (including labour cess and excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of Bitumen VG-30) (including labour cess and excluding GST)
Providing and laying bituminious concrete using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.(Including cost of Bitumen VG-30) (including labour cess and excluding GST)
Construction of earthen Shoulders (Patri) with approved material obtained from borrow pits with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 (including labour cess and excluding GST)
Construction of earthen Shoulders (Patri) with approved material obtained from borrow pits (Carted earth) with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 (including labour cess and excluding GST)
Widening of H.P. Clvert - Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (including labour cess and excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (including labour cess and excluding GST)
Laying reinforced cement concrement pipe of 1000 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets. (including labour cess and excluding GST)
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . (including labour cess and excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (including labour cess and excluding GST)
Construction of 600mm wide(inner section 450mm) RCC U-type Drain- Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (including labour cess and excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (including labour cess and excluding GST)
R.C.C. work with cement, approved coarse sand and 2 cm. (3/4") guage approved stone grit in the proportion of (1:1.5:3)(1cement :1.5coarse sand( FM2.20-3.60) :3 stone aggregate20mm) in drain excluding supply of reinforcement and its bending but including its fixing in position and binding with 24 B W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. (including labour cess and excluding GST)
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in anover all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (including labour cess and excluding GST)
Construction of RCC Culvert - Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (including labour cess and excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (including labour cess and excluding GST)
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations. (including labour cess and excluding GST)
Providing and filling of sand as per drawing and technical specification as directed by the Engineer in charge. (including labour cess and excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (including labour cess and excluding GST)
R.C.C. work with cement, approved coarse sand and 2 cm. (3/4") guage approved stone grit in the proportion of (1:1.5:3)(1cement :1.5coarse sand( FM2.20-3.60) :3 stone aggregate20mm) in drain excluding supply of reinforcement and its bending but including its fixing in position and binding with 24 B W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. (including labour cess and excluding GST)
Brick masonry work in cement mortar in substructure / superstructure complete excluding pointing and plastering, as per drawing and technical specification . (including labour cess and excluding GST)
Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in anover all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (including labour cess and excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (including labour cess and excluding GST)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and as per directed by engineer in charge. (including labour cess and excluding GST)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (including labour cess and excluding GST)
Dismantling of existing structures,like culverts, bridges, retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. As per SI no 692.(including labour cess and excluding GST)
Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 (including labour cess and excluding GST)
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes 1000 mm dia including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete (including labour cess and excluding GST)
Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412 (including labour cess and excluding GST)
M/S M V D INFRA DEVELOPERS PRIVATE LIMITED
M/S ANMOL ASSOCIATES
M/s MAA AADI SHAKTI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf