Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹4,682.24 (0.02%)Admitted-Finance | ₹1.9 Cr+₹4,682.24 (0.02%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 Cr+₹57.1 L (29.7%)Admitted-Finance | ₹2.5 Cr+₹57.1 L (29.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 Cr+₹61.2 L (31.8%)Admitted-Finance 94 2ND MAIN BANGALORE NO 94 2ND CROSS MLA LAYOUT RT NAGAR BANGALORE MLA LAYOUT BANGALORE CITY KARNATAKA 560032 | BENGALURU URBAN | KARNATAKA | 560032 | ₹2.5 Cr+₹61.2 L (31.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.7 Cr+₹77.8 L (40.5%)Admitted-Finance | ₹2.7 Cr+₹77.8 L (40.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TDFM FACILITIES PVT LTD L6 | ONIX ENCLAVES PVT LTD L2 | M/s. Infraline Engineers L1 | Rhino Services L3 | TECHSOL ENGINEERS L4 | NOPS INFRASTRUCTURE PVT. LTD. L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (ie, unions, reducers, elbows, Tees , front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations. | |||||||||
| 1.10 | 1”OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A) | 1,500 | RM | 50 ₹88,500 Lowest | 100 ₹1,77,000 | 100 ₹1,77,000 | 225 ₹3,98,250 | 380 ₹6,72,600 | 500 ₹8,85,000 |
| 1.20 | ¾”OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A) | 7,550 | RM | 500 ₹44,54,500 | 334 ₹29,75,606 | 334 ₹29,75,606 | 324 ₹28,86,516 Lowest | 350 ₹31,18,150 | 500 ₹44,54,500 |
| 1.30 | ½”OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A) | 241 | RM | 300 ₹85,314 | 200 ₹56,876 Lowest | 200 ₹56,876 Lowest | 252 ₹71,663.76 | 320 ₹91,001.6 | 500 ₹1,42,190 |
| 1.40Erection rates of following items (Refer TS Section III - A) | |||||||||
| 1.50 | Ball Valves ¾” Size | 77 | Nos. | 12,000 ₹10,90,320 | 300 ₹27,258 | 300 ₹27,258 | 630 ₹57,241.8 | 10 ₹908.6 Lowest | 200 ₹18,172 |
| 1.60 | Ball Valves ½” Size(2 way/3 way) | 115 | Nos. | 500 ₹67,850 | 300 ₹40,710 | 300 ₹40,710 | 630 ₹85,491 | 10 ₹1,357 Lowest | 200 ₹27,140 |
| 1.70 | Ferrule Fittings 1” (if to be changed) | 2 | Nos. | 500 ₹1,180 | 10 ₹23.6 | 1 ₹2.36 Lowest | 225 ₹531 | 10 ₹23.6 | 200 ₹472 |
| 1.80 | Ferrule Fittings ¾” (if to be changed) | 20 | Nos. | 500 ₹11,800 | 10 ₹236 | 1 ₹23.6 Lowest | 225 ₹5,310 | 10 ₹236 | 200 ₹4,720 |
| 1.90 | Ferrule Fittings ½” (if to be changed) | 20 | Nos. | 500 ₹11,800 | 10 ₹236 | 1 ₹23.6 Lowest | 225 ₹5,310 | 10 ₹236 | 200 ₹4,720 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
8 Apr 2023, 3:00 pmClosed
Cheif Manager (C and P)
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Tender for Annual Rate Contract for carrying out Mechanical Works at proposed CNG Stations in Pune, Nanded and Nizamabad GA.
2023_MNGL_149368_1
MNGL/CP/2022-23/221
Open Tender
Miscellaneous Works
Works
365 days
Nanded and Nizamabad GAs of MNGL
As per tender document
17 documents required · 17 mandatory
₹0
₹2 L
Yes
MNGL, Baner, Pune OR VC link given in NIT documnet
30 May 2023
18 Mar 2023
10 Apr 2023
18 Mar 2023
8 Apr 2023
18 Mar 2023
24 Mar 2023
Amount
SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (ie, unions, reducers, elbows, Tees , front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations.
1”OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A)
¾”OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A)
½”OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
Erection rates of following items (Refer TS Section III - A)
Ball Valves ¾” Size
Ball Valves ½” Size(2 way/3 way)
Ferrule Fittings 1” (if to be changed)
Ferrule Fittings ¾” (if to be changed)
Ferrule Fittings ½” (if to be changed)
Dismantaling of SS tubes along with all fittings (ie, unions, reducers, elbows, Tees , front Ferrule, Back Ferrule, NRV, Valves etc.) from the existing CNG station as per Instruction from Engineer In-Charge and scope of work including handling, lifting, transportation and submiting to Company's Stores from CNG site.
SS 316 tube of 3/4" OD/ 1/2" OD/ SS 304 tube of 1/2" OD
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations. (Note:Total no.of ferrule fittings may be considered as one jointing ferrule at every 5.0 m)
½”OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
SS Ball Valves ½” Size
Reducer ½” x 1/4" Size
Euqal Tee ½" Size
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B)
SECTION-B (ii) : UNLOADING , SHIFITNG & LOADING OF MECHANICAL EQUIPMENT IN STATION PREMISE (CASCADE) Unloading from existing position (including Compressed natural Gas venting from cascade if necessary) at Ground level or on roof at 3.5 m above ground level, lifting & erecting on foundation at ground level in the same CNG stations. Again the same cascade is to be shifted to new foundation within the same CNG station. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity. Erection at + 3.5 m level (Refer TS Section III - B)
SECTION-B (iii) : SHIFTING OF MECHANICAL EQUIPMENT IN STATION PREMISE (CASCADE/ BOOSTER COMPRESSOR) Lifting of Cascade / Booster Compressor (including accessories if applicable) from existing position from ground level and shifting & erecting in the same CNG stations on foundation at ground level or on roof at 3.5 m above ground level (in case of Cascade if required) . Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
3000 WL Cascade/ Booster Compressor with accessories. Lifting & Erection at ground /3.5 m level (Refer TS Section III - B)
SECTION-B (iv) : UNLOADING, TRANSPORTAION & LOADING OF BOOSTER COMPRESSOR Unloading from existing position (including dismantaling of connection, packaging of booster Compressor package), handling including lifting and transportation from CNG stations to Company's store / erecting on civil foundation at or above ground level in other CNG station site if necessary. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, wire rope, gasket, nut bolts, etc.
Hydraulic Booster Compressor (Refer TS Section III - B)
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC.
Water cooler (Refer TS Section III - C)
Fire fighting Equipments (Refer TS Section III - C)
DCP -9 Kg
DCP -75 Kg
Sand Bucket Set (6 Nos. on each strand)
Description of Work / Item(s)
Amount
SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (ie, unions, reducers, elbows, Tees , front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations
1”OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A)
¾”OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A)
½”OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
Erection rates of following items (Refer TS Section III - A)
Ball Valves ¾” Size
Ball Valves ½” Size(2 way/3 way)
Ferrule Fittings 1” (if to be changed)
Ferrule Fittings ¾” (if to be changed)
Ferrule Fittings ½” (if to be changed)
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations. (Note:Total no.of ferrule fittings may be considered as one jointing ferrule at every 5.0 m)
½”OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
SS Ball Valves ½” Size
Reducer ½” x 1/4" Size
Euqal Tee ½" Size
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (0 -50) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (51-100) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (101-150) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (151-200) Km
SECTION-B (ii) : SHIFTING OF MECHANICAL EQUIPMENT IN STATION PREMISE (CASCADE/ BOOSTER COMPRESSOR) Lifting of Cascade / Booster Compressor (including accessories if applicable) from existing position from ground level and shifting & erecting in the same CNG stations on foundation at ground level or on roof at 3.5 m above ground level (in case of Cascade if required) . Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
3000 WL Cascade/ Booster Compressor with accessories. Lifting & Erection at ground /3.5 m level (Refer TS Section III - B)
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC.
Water cooler (Refer TS Section III - C)
Fire fighting Equipments (Refer TS Section III - C)
DCP -9 Kg
DCP -75 Kg
Sand Bucket Set (6 Nos. on each strand)
Description of Work / Item(s)
Amount
SECTION-A : SS TUBE LAYING & TESTING Laying, testing and commissioning of SS tubes along with all fittings (ie, unions, reducers, elbows, Tees , front Ferrule, Back Ferrule, NRV etc.) (all free issue items) as per Technical Specification & Typical P & ID for type of CNG station and scope of work including handling, lifting, transportation from Company's Stores to CNG Stations
1”OD X 0.120” min Wall thk. SS Tube (Refer TS Section III - A)
¾”OD X 0.095” min Wall thk. SS Tube (Refer TS Section III - A)
½”OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
Erection rates of following items (Refer TS Section III - A)
Ball Valves ¾” Size
Ball Valves ½” Size(2 way/3 way)
Ferrule Fittings 1” (if to be changed)
Ferrule Fittings ¾” (if to be changed)
Ferrule Fittings ½” (if to be changed)
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations. (Note:Total no.of ferrule fittings may be considered as one jointing ferrule at every 5.0 m)
½”OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
SS Ball Valves ½” Size
Reducer ½” x 1/4" Size
Euqal Tee ½" Size
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (0 -50) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (51-100) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (101-150) Km
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (151-200) Km
SECTION-B (ii) : SHIFTING OF MECHANICAL EQUIPMENT IN STATION PREMISE (CASCADE/ BOOSTER COMPRESSOR) Lifting of Cascade / Booster Compressor (including accessories if applicable) from existing position from ground level and shifting & erecting in the same CNG stations on foundation at ground level or on roof at 3.5 m above ground level (in case of Cascade if required) . Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
3000 WL Cascade/ Booster Compressor with accessories. Lifting & Erection at ground /3.5 m level (Refer TS Section III - B)
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC.
Water cooler (Refer TS Section III - C)
Fire fighting Equipments (Refer TS Section III - C)
DCP -9 Kg
DCP -75 Kg
Sand Bucket Set (6 Nos. on each strand)
ONIX ENCLAVES PVT LTD
Rhino Services
TECHSOL ENGINEERS
NOPS INFRASTRUCTURE PVT. LTD.
TDFM FACILITIES PVT LTD
ONIX ENCLAVES PVT LTD
TECHSOL ENGINEERS
Rhino Services
NOPS INFRASTRUCTURE PVT. LTD.
TDFM FACILITIES PVT LTD
ONIX ENCLAVES PVT LTD
Rhino Services
TECHSOL ENGINEERS
NOPS INFRASTRUCTURE PVT. LTD.
TDFM FACILITIES PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .