| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹9.9 L+₹50,403 (5.36%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L3₹9.9 L+₹50,403 (5.36%)Rejected-AOC STAKMO | L3 | Rejected-AOC Quoted high rate as compared to L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Registration card not renwed from 3/2021 |
Tender Value
₹10 L
Closing Date
3 Nov 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of side room set near community hall Murgi, Block Panamik
2022_RDD_8219_3
NIT 47 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
8 Feb 2023
27 Oct 2022
5 Nov 2022
27 Oct 2022
3 Nov 2022
27 Oct 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr. All kinds of soil.
Providing and laying of stone soiling of any thickness, hand packed in horizontal level, including cost of stone.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 2 coarse sand: 4 graded stone aggregate 40mm nominal size). Nallah Stones.
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and laying damp-proof course 5Crnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size Crushed
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo Mechanically Treated Bars.
Centring and shuttering including strutting, propping etc. and removal of form for Column:
Centring and shuttering including strutting, propping etc. and removal of form for : lintel , beams etc
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
Carriage of cement and steel from an average lead up to 20 Km by Mechanical Transport
Carriage of sand and coarse aggregates from an average lead up to 15 Km by Mechanical Transport.
M/S TASHI LAWANG
M/S TSEWANG NAMGIAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .