| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.4 LAdmitted-Finance NO 9910098672 MAYUR VIHAR PHASE 3 NEW DELHI DELHI 110096 | 991009 | -31.50% | ₹21.4 L | L1 | Admitted-Finance |
| 2 | L2₹27.2 LAdmitted-Finance | -13.00% | ₹27.2 L | L2 | Admitted-Finance |
| 3 | L2₹27.2 LAdmitted-Finance 0 BILPURA TARF BINWAR NEAR PANI KI TANKI HAMIRPUR UTTAR PRADESH 210501 | HAMIRPUR | UTTAR PRADESH | 210501 | -13.00% | ₹27.2 L | L2 | Admitted-Finance |
| 4 | L3₹27.8 LAdmitted-Finance 125 FIRST FLOOR VYAAR BHAWAN CHANDERPURI GHAZIABAD UTTAR PRADESH 201001 | GHAZIABAD | UTTAR PRADESH | 201001 | -11.06% | ₹27.8 L | L3 | Admitted-Finance |
| 5 | L4₹27.8 LAdmitted-Finance E 07 OFFICE 02 BEST HOME STREET NO 1 SARFABAD SECTOR 73 NOIDA 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | -11.00% | ₹27.8 L | L4 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Apr 2026, 5:30 pmClosed
Sr. Engineer NBP CAG
BHEL Sadan Noida Sec 16A
Misc Civil Works for repair and maintenance purposes of existing HRDI PPEI and BHEL SADAN building at BHEL SADAN Campus Plot No 25 Sector 16A Noida
2026_BHEL_59587_1
AA CAG 26 27 MISC CIVIL WORK 17
Open Tender
Civil Works
365 days
BHEL Sadan Noida sec 16A
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
14 May 2026
24 Mar 2026
15 Apr 2026
24 Mar 2026
14 Apr 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | - | cum | 181.85 | - | BI01010001010000000000000515BI0100001113 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size). | - | cum | - | - | BI01010001010000000000000515BI0100001114 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | - | cum | - | - | BI01010001010000000000000515BI0100001115 | |
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | cum | 219.65 | - | BI01010001010000000000000515BI0100001116 | |
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1. m. All kinds of soil. | - | Sqm | 24.35 | - | BI01010001010000000000000515BI0100001117 | |
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum. | 1,737.45 | - | BI01010001010000000000000515BI0100001118 | |
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats | - | kg | 1.7 | - | BI01010001010000000000000515BI0100001119 | |
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm. | - | Sqm | 54.85 | - | BI01010001010000000000000515BI0100001120 | |
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | - | cum. | 1,469.9 | - | BI01010001010000000000000515BI0100001121 | |
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | Cum | 2,534.7 | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_64491.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid